Foster Township

Anti-Data Center Policies

Foster Township’s enacted rules sharply limit where data centers may locate and require approval, setbacks, and noise testing, making projects harder but not impossible; owners may seek rezoning.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Foster Township
Would restrict data centers to designated energy-overlay districts and require township approval, substantial setbacks, and studies addressing safety, noise, vibration, and water supply.White Haven Center Data Center Ordinance

What this means

The proposal would limit data centers to a few energy-overlay areas and require conditional-use approval, substantial setbacks, and sound, vibration, and water studies—significant hurdles to building and operating facilities (district limits and conditional-use review). Because property owners could still seek rezoning, it is not an outright ban (owners could apply to have land rezoned).

People behind it

  • Reviewed the proposed zoning amendment and will recommend whether it should advance to the township supervisors.

  • Will vote on the amendment; under its proposed terms, they would approve or deny data-center conditional-use applications after public hearings.

Restrictions & requirementsHide restrictions & requirements10
  • The proposal limits data centers to energy overlay (AEO) districts, although landowners elsewhere could apply to rezone their property for that use. AEO districts

  • A data center would require conditional-use approval from the township supervisors after a public hearing. conditional use

  • Data centers would need a 300-foot setback from property lines; accessory uses would need a 250-foot setback. 300 feet from all property lines

  • Data centers would need to be 500 feet from specified sensitive places and uses, including homes, schools, childcare facilities, places of worship, and outdoor recreation facilities. set back 500 feet

  • Applicants would have to show that fire-suppression, containment, ventilation, and evacuation procedures sufficiently protect public health, safety, and welfare. procedures for fire suppression

  • The proposal would regulate facility height and require data center buildings to be completely enclosed by a buffer area; the article gives no specific height limit. completely enclosed by a buffer area

  • Applicants would need a sound study showing that noise stays within maximum decibel levels; the article does not state the specific limits. sound study

  • Applicants would need a vibration study showing that building vibrations would not be perceptible to people beyond the property line. vibration study

  • For a public water supply, applicants would need certification that the authority can provide the required water; for a nonpublic supply, they would need a water-feasibility study. water feasibility study

  • The draft called for the water study to identify existing and proposed wells within 1,000 feet; the planning commission recommended increasing that distance to 3,000 feet. 1,000 feet originally proposed

Benefits & exceptionsHide benefits & exceptions1
  • The proposed amendment allows data centers as a conditional use in energy overlay (AEO) districts, subject to township supervisors’ approval after a public hearing.

Sources

current law · Foster Township
The rules are in Ordinance 5 of 2026, which the supervisors adopted after a public hearing on July 8, 2026.Foster Township, Luzerne County — data-center ordinance (No. 5 Of 2026)

What this means

The measure imposes setbacks from homes or other protected places, limited eligible locations and noise limits and sound testing. The limits sharply reduce usable sites or workable project designs, making development substantially harder despite an available approval route.

Restrictions & requirementsHide restrictions & requirements22
  • Section 801.52.A sets a 2,000 ft setback from all property lines for both the data center and its accessory uses, which the definition says include generators, substations, and cooling towers, and a 2,000 ft setback from residential uses and districts.

  • Section 801.52.A.1 limits height to 40 ft including roof-mounted equipment, but the amendment does not contain the district height limits for other principal buildings.

  • 65 dBA day and 55 dBA night at the property line, Section 801.52.A.3

  • Section 801.52.A.3 requires preliminary, interim, and as-built studies using ANSI S1.4 meters and generally accepted methodology, with the as-built study six months after the certificate of occupancy.

  • Generator testing weekdays 9 a.m. to 5 p.m. only; no numeric hours cap, Section 801.52.A.3

  • Vibration study showing none perceptible past the property line, Section 801.52.A.4.

  • Water feasibility study with drawdown tests of wells within 3,000 ft; no bar on wells for cooling, Section 801.52.A.5

  • Water use for cooling must be described; no cooling method required, Section 801.52.A.5

  • Projected water demand disclosed, Section 801.52.A.5

  • Section 801.52.A.6 requires the applicant to show that disposal of domestic and cooling wastewater has been provided and approved by the SEO or DEP.

  • Generator emissions must meet federal and state rules with proof of permits, Section 801.52.A.11.f

  • Decommissioning plan covers disposal or recycling; batteries and refrigerants disposed per law, Section 801.52.A.12

  • Utility certification of capacity; no electrical inspection, Section 801.52.A.7.

  • On-site generation for normal operations is a separate use with its own approval, Section 801.52.A.7.

  • Use fully enclosed by a defined Buffer Area; width not stated in the amendment, Section 801.52.A.2

  • Emergency response plan accepted by the fire department; no annual update, radio, or contacts, Section 801.52.A.8

  • Fuel storage must meet NFPA 30 with permits provided to the township; no setbacks or containment, Section 801.52.A.11.f

  • Annual fire safety inspections, Section 801.52.A.8

  • Plan and security for full cost with 18-month completion; not 110% or 6 months, Section 801.52.A.12

  • Security reviewed bi-annually, Section 801.52.A.12.ii

  • One as-built sound study after opening, Section 801.52.A.3

  • As-built noise exceedance is a zoning violation; general enforcement only

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the AEO overlay district only