Franklin County’s enacted rules make data centers harder to build, requiring 1,000-foot setbacks, a 35-foot height limit unless waived, impact studies, and decommissioning financial security. They do not ban facilities or override municipal zoning authority.
Rating and summary from Franklin County as there are no scored current or future laws outside temporary restrictions for Fannett Township.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
pending · Fannett TownshipThe revised draft, Proposed Ordinance 3-2026 dated September 16, 2026, was listed for consideration at the Board of Supervisors meeting on October 6, 2026, and no record posted online shows whether the Board adopted it.Fannett Township, Franklin County — proposed data-center ordinance (None Adopted)
What this means
The proposal would require a 60-acre site, substantial setbacks and strict noise limits, with all power generated on site and no grid connection. The power restriction and land requirements would make many otherwise workable projects substantially harder to build.
Restrictions & requirementsHide restrictions & requirements37
Township permit from the Board of Supervisors; no conditional use, hearing, or special exception, Sec. 4(1)
Limits on Class I, II, and III soils (25%, 40%, and 50%) but no bar on preserved farmland or agricultural security areas, Sec. 3(17).
Sec. 3(3)(e) and (g) cap buildings at 35 feet, let screened rooftop equipment extend no more than 10 feet above the limit, and allow a waiver with fire company certification, but Fannett has no zoning ordinance, so there is no district limit for other principal buildings to compare.
Barred in floodplains, within 50 ft of streams and wetlands, in Chapter 102 riparian buffers, and on PNDI species sites; no 100-ft buffer, Sec. 3(2)(f) and (g)
Sec. 4(2) requires a new permit when an existing facility is physically modified in a manner that materially alters it and exempts routine maintenance and like-kind replacements, but it lists no specific triggers such as added generators, cooling, or electrical demand.
Sec. 3(14)(a) sets 50 dBA by day and 40 dBA at night at the property line, and the required sound studies must use sound level meters described in ANSI S1.4-2014.
Sec. 3(14)(a) bars sound more than 10 dBA above the predevelopment ambient level and requires a baseline evaluation of ambient noise, but the ambient is not an L90 measure, no ambient measurement method is stated, and no floor applies below the absolute caps.
50 dBC day and night at the property line, with octave band frequency analysis, Sec. 3(14)(a) and (c)
Sec. 3(14)(c) requires a preliminary study before preliminary approval, an interim study at building permit, and an as-built study six months after occupancy using ANSI S1.4-2014 meters, but the as-built study is not required to be measured at full operating load.
Diesel generators limited to emergency use, but no testing hours or hours cap, Sec. 3(6)(g)
Vibration study, and vibrations may not extend past the property line, Sec. 3(15).
Water supply feasibility study, and phased groundwater study with aquifer pumping tests; wells not barred where public water is available, Sec. 3(11) and (13)
Best available technology, including closed loop cooling, to minimize consumptive use, with water use by purpose disclosed; evaporative cooling not restricted, Sec. 3(11)(a) and (b)(vii)
Average and peak water demand disclosed and peak groundwater demand limited to 50% of drought safe yield; no cap, reporting, or drought plan, Sec. 3(11)(b) and 3(13)(d)
Wastewater plan, including cooling water, approved by the Sewage Enforcement Officer or PADEP, with any NPDES permit before approval, Sec. 3(16)
Emergency generators must meet Tier IV; no annual emissions testing or reports, Sec. 3(6)(g)
Thermal impact mitigation plan including waste heat reuse options, Sec. 3(9).
BESS decommissioning must follow hazardous waste and recycling rules; no plan for servers or refrigerants, Sec. 3(8)(p)(x)
Grid connection prohibited; no utility letter or electrical inspection, Sec. 3(6)(b)
Power needs disclosed and engineer power plan required, and roof-mounted solar must be installed to the maximum extent practicable, Sec. 3(6)(a), (c), and (h).
All power must be self-generated on site under a township-approved plan; not a separate use, Sec. 3(6)(b) through (e)
Substations screened from public view, behind buildings where practicable; line burial not addressed, Sec. 3(3)(h)
100-ft densely planted buffer along all property lines, Sec. 3(2)(d).
Principal facades must use at least two design elements, with color standards, Sec. 3(3)(c) and (f).
Equipment in a fully enclosed building unless infeasible, and rooftop equipment behind noise-absorbing screens; no 12-ft standard, Sec. 3(2)(h) and (i)
Buildings oriented to minimize visual impact, but no visual study, renderings, or elevations required, Sec. 3(3)(b)
Emergency Response Plan reviewed by the fire and ambulance companies, with 24-hour contact signage; no annual plan updates or radio coverage, Sec. 3(8)(a) and (m)
Sec. 3(8)(n) and (o) require the applicant to pay for responder training at least annually and for necessary fire company equipment, but the applicant is not required to deliver the training before occupancy or keep the equipment on site.
Sec. 3(5) keeps regulated substance tanks 200 feet from property lines and requires a copy of the PPC Plan to be provided to the Township, but no tank setback from wells is stated and the only stream rule is a 50-foot facility setback in Sec. 3(2)(g).
Annual fire safety inspections; no third-party electrical inspection, Sec. 3(8)(m)(xiii)
Sec. 3(10)(a) requires a traffic study in every case addressing daily operational traffic and emergency access, with construction routes in a separate plan, but the study does not cover construction traffic or a stated study area.
Two separate emergency access routes; no arterial or collector road requirement, Sec. 3(8)(r)
Sec. 3(10)(b) and (c) limit construction to weekdays from 8:00 a.m. to 5:00 p.m., require a construction route plan, and require a road repair bond, but road posting under 67 Pa. Code Chapter 189 is not required.
Notice within 24 hours and security of the estimate plus 25%, but removal within 12 months after a 6-month abandonment period, Sec. 3(18)
One as-built sound study 6 months after occupancy, Sec. 3(14)(c)(iii)
Sec. 4(7) allows permit revocation if the facility is altered, and Sec. 5 enforces violations as summary offenses under Section 1601 of the Second Class Township Code with fines up to $1,000 per day, but no notice or hearing is required before revocation.
Sec. 4(10) requires a $50,000 escrow at filing to pay independent township reviewers, inspections, and compliance monitoring, and Sec. 3(6)(e) has the applicant pay specialists reviewing the power plan, but the review is part of the township permit, not land development review.