Falls Township
Anti-Data Center Policies
Falls Township’s enacted rules limit noise, require sound testing, and set separation distances from homes and other protected places, adding costs and review requirements while still allowing data centers.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Falls TownshipThe data center rules are in Section 812 of the restated Falls Township Zoning Ordinance, which the Board of Supervisors enacted on March 12, 2026, effective immediately, and the county subdivision ordinance amendment took effect on September 9, 2026.Falls Township, Wyoming County — data-center ordinance (Zoning Ordinance Of March 12, 2026)
What this means
The measure imposes noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements21
Special exception by the Zoning Hearing Board; approval expires after one year without construction, § 1208.5
Zoning: 100 ft or building height from residential districts and uses (§ 812.4.B)
Underlying district height stated as applying; no rooftop limit, § 812.4
Township may require an environmental study, but none is required, § 812.4.D
Zoning § 701.6 applied by § 812.8: 60 dBA day and 50 dBA night at dwellings; county SALDO 55 dBA
County SALDO: Where equipment is anticipated to generate low-frequency, tonal, or impulsive sound, the Sound Impact Study must include additional analysis, which may include octave-band data (Sec. 204, 702.2F). No dBC limit.
County SALDO: Sound Impact Study by a credentialed acoustics engineering expert with the land development application, including 24-hour ambient monitoring and post-construction modeling (Sec. 702.2F). No study at building permit or after opening.
County SALDO: Ground-Borne Vibration defined, and the Sound Impact Study must analyze it where anticipated, with mitigation such as isolation pads and foundations (Sec. 204, 702.2F). No vibration limit at the property line.
Water supply documentation and SRBC compliance required (§ 812.6, which cites § 701.2); county will-serve letter
County SALDO: A water demand, cooling system, and water infrastructure narrative is a required application material (Sec. 410). Closed-loop cooling is not required.
County SALDO: Maximum consumptive water use disclosed; SRBC permit at 20,000 gpd (Sec. 611I)
County SALDO: Industrial wastewater discharge permit where required by DEP
County SALDO: Chapter 102 and NPDES permits stated as applying
Interconnection agreement showing available capacity, § 812.7; no electrical inspection.
Known impacts on electric rates must be noted, § 812.7
50 ft undisturbed buffer along all property lines, § 812.2.A
County SALDO: General design language: the site design narrative must address roof or facade materials, with lighter colors only where voluntarily proposed (Sec. 712), and the sound standards sit within the nonresidential design standards (Sec. 702.2).
Data center equipment kept behind buildings and away from homes, § 812.4.C; county STC 35 noise screening where needed
County SALDO: Sight-line subplans with renderings may be required (Sec. 615.6)
County SALDO: Emergency access and fire protection narrative required (Sec. 410), with fire chief input on fire suppression improvements (Sec. 620) and an annual consultation covenant (Sec. 621.3A). No radio coverage or posted contacts.
Township may require a traffic study, but none is required, § 812.4.D
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Special exception in the I Industrial District; county subdivision standards also apply
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data