Fairview Township’s enacted ordinance allows data centers but requires noise limits and testing, setbacks from homes and other protected places, and height limits, adding construction and compliance costs.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Fairview Township
The standards were added as Section 246-34(52) of the zoning chapter by Ordinance No. 1-5-2026, which the Board of Supervisors adopted on January 5, 2026 after an advertised hearing.Fairview Township, Luzerne County — data-center ordinance (No. 1-5-2026)

What this means

The measure imposes noise limits and sound testing, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements16
  • 67 dBA day and 57 dBA night and weekend at the property line, § 246-34(52)F(1)

  • Section 246-34(52)F(1)(a) to (c) requires preliminary, interim, and as-built studies using ANSI S1.4 meters and generally accepted methodology.

  • Vibration study showing no vibration perceptible beyond the property line, § 246-34(52)F(3).

  • Water feasibility study for nonpublic supply; no pump tests or cooling-well bar, § 246-34(52)G(2)

  • Projected water demand disclosed, § 246-34(52)G(2)(a)

  • Wastewater disposal, including cooling wastewater, approved by the SEO or DEP as part of approval, § 246-34(52)G(4)

  • Utility certification of capacity and service; no electrical inspection, § 246-34(52)H(1).

  • Substations counted as accessory uses; equipment within 300 ft enclosed or screened, § 246-20 and § 246-34(52)E(1)

  • Only known rate impacts must be noted, § 246-34(52)H(1)

  • 25-ft planted buffer next to residential districts and sensitive receptors, § 246-34(52)D(1)

  • Equipment within 300 ft of roads, residential districts, or sensitive receptors enclosed or screened; no height or acoustic standard, § 246-34(52)E(1)

  • Plan reviewed and accepted by the fire department; no annual updates, radio coverage, or posted contacts, § 246-34(52)I(1)(a)

  • First responders must receive system-specific training; cost not assigned, § 246-34(52)I(1)(d)

  • Annual fire safety inspections, § 246-34(52)I(1)(e)

  • As-built sound study after occupancy, § 246-34(52)F(1)(c)

  • As-built noise violation treated as an ordinance violation, § 246-34(52)F(1)(c)

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the GI General Industrial District