Ephrata Township’s enacted ordinance limits noise and building height and requires sound testing and setbacks from homes or other protected places, increasing costs while still allowing data centers to be approved.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Ephrata TownshipThe rules are in Ordinance No. 290, which the Board of Supervisors adopted on May 5, 2026.Ephrata Township, Lancaster County — data-center ordinance (No. 290)
What this means
The measure imposes noise limits and sound testing, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements21
Buffer from the Agricultural district only; no farmland bar
200-ft yards and a 100-ft buffer yard next to residential uses and districts, § 662.B
Section 662.C caps structures at 40 feet and limits roof-mounted equipment to 10 feet above the roof, with Section 662.D requiring visual screening of roof-mounted components, but the Industrial District height limit for other principal buildings in Section 407 is not in the amending text.
70 dBA day and 65 dBA night at the property line, § 662.E.2 Table 1
80 dBC day and 65 dBC night limits and low-frequency modeling, § 662.E.2 Table 1
Pre-construction and post-construction noise studies; no building permit study, § 662.E.2.a and b
Generator testing only from 7 a.m. to 7 p.m. at 80 dBA or dBC; no weekday limit or hours cap, § 662.E.2.d
Water feasibility study with drought-based safe yield; no bar on wells for cooling, § 662.G.1
Projected water needs disclosed, § 662.G.1.a
Study must identify how water will be recycled or released, § 662.G.1.g
Emissions must meet state and federal standards, § 662.G.4
Decommissioning plan must address electronic waste, § 662.G.5
Generators and fuel cells addressed as screened accessory equipment, § 662.D.1
Substations visually and audibly screened, § 662.D.1
100-ft buffer yard with required planting next to residential uses and districts, § 662.B.4.
Fully shielded or cutoff fixtures with a photometric plan, § 662.E.1
Visual screening on all sides to 12 ft for ground equipment and 10 ft for rooftop equipment, plus acoustic screening, § 662.D.1.
Hazardous materials addressed only in the decommissioning plan
Decommissioning plan without financial security, § 662.G.5
One post-construction noise study after opening, § 662.E.2.b
Zoning Administrator enforces noise studies and mitigation; no specific penalties, § 662.E.2.e
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Special exception in the Industrial District
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data