Edgmont Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Edgmont Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Edgmont Township
The township has posted draft Ordinance No. 254 of 2026 with the enactment date blank, the October 13, 2026 Board of Supervisors agenda listed authorizing staff to send it to the County for Act 247 review and to the Planning Commission, and the October 26, 2026 Planning Commission agenda listed its review, but no public hearing or adoption vote has been scheduled in posted records.Edgmont Township, Delaware County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose cooling and water-use rules, money set aside for eventual removal and noise limits and sound testing. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements28
  • Conditional use in the C-3 Planned Commercial/Residential and LI Light Industrial Districts only, Sections 2 and 3, § 365-89C(14) and § 365-106C(16)

  • 35 ft building height; rooftop equipment capped at 45 ft total rather than a stated distance above the roof, § 365-201D

  • Section 365-201A(2) requires phasing plans to be posted on the project website, but no phase states its electrical demand and no new approval is required for added phases or capacity.

  • Section 365-201I(10) Tables 1 and 5 set 45 dBA day and 40 dBA night as 1-hour Leq values at the property line of residential and sensitive receptors, measured with Type 1 or Type 2 ANSI-certified meters with field calibration.

  • Section 365-201I(5) and Table 6 treat an increase of 2 dBA or more above the pre-construction baseline ambient level as a violation, with Type 1 or Type 2 meters in Table 5, but the baseline is not an L90 measure and the cap applies only where the baseline already exceeds the fixed limits.

  • 60 dBC day and 50 dBC night, § 365-201I(10) Table 3

  • Pre-construction study with the application and as-built study within 180 days of operation; no study at building permit, § 365-201I(1) and (3)

  • Numeric vibration limits of 65 VdB and 0.2 to 0.5 in/sec PPV with vibration studies; no bar on perceptible vibration past the property line, § 365-201I(1) and (3)(f)

  • Public water required and groundwater barred as the primary cooling source, with provider capacity documentation; no hydrogeologic study or pump test, § 365-201J(1)-(4)

  • Air-cooled or closed-loop cooling required unless an approved alternative uses less water and energy, § 365-201J(5).

  • Daily and annual water use estimates and a drought response plan; no use cap or ongoing reporting, § 365-201J(2) and (6)

  • Wastewater analysis including HVAC discharge, pretreatment approved by the sewer provider, and no untreated discharge to stormwater or surface waters, § 365-201K

  • Diesel generators must meet EPA Tier 4 with annual testing reports, § 365-201H(7)(a)-(b)

  • Electronic Waste Plan for server infrastructure, batteries, and hazardous materials, with refrigerant disposal at decommissioning, § 365-201O and P(4)(b).

  • Utility interconnection application, transmission security agreement, and energization date documented in the energy plan before approval; no electrical inspection, § 365-201H(6) and (8)

  • Energy usage plan and 10% renewable procurement above 50 MW; rooftop solar listed only as an example, § 365-201H(5) and (9)

  • Substations to the side or rear and screened from public view, and all on-site power lines buried, § 365-201L(2)-(4)

  • Ground and rooftop equipment screened on all sides or set back from view; no height or acoustic screening standard, § 365-201F

  • Elevations and renderings required with the conditional use application; no visual impact study, § 365-201G

  • Emergency response plan accepted by the fire department, radio coverage, and 24-hour contact signage; no annual plan updates, § 365-201M(1), (5) and (6)

  • Hazardous materials addressed in the waste and decommissioning plans; no storage setbacks or containment, § 365-201O and P(4)(b)

  • Annual fire safety inspections; no third-party electrical inspection, § 365-201M(1)(e)

  • Construction plan sets times and locations for construction vehicle access; no road damage bond, § 365-201N

  • Security for the full cost, notice of closure, and removal completed within 18 months after decommissioning begins, § 365-201P(2), (3) and (5)

  • Monthly reports from permanent noise monitoring stations at each property line, § 365-201I(9)

  • Corrective action within 90 days and interim curtailment; no specific penalties or permit revocation, § 365-201I(4) and (8)

  • Township Engineer or consultant may review studies and monitoring data; cost not assigned, § 365-201I(3)(h)

  • Advertised applicant public meeting before the first Planning Commission meeting and a project website kept through final land development approval, § 365-201A

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Conditional use in the C-3 Planned Commercial/Residential and LI Light Industrial Districts (proposed)

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data