East Penn Township

Anti-Data Center Policies

East Penn Township requires data centers to undergo technical studies and utility checks, meet noise limits and sound-testing requirements, and keep setbacks from homes and other protected places; approval remains possible, but compliance and review can cost more.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · East Penn Township
The standards are in Section 503.13 of Zoning Ordinance No. 2009-07, added by Ordinance No. 2026-01, which the Board of Supervisors adopted on June 1, 2026, effective five days after enactment.East Penn Township, Carbon County — data-center ordinance (No. 2026-01)

What this means

The measure imposes technical studies and utility checks, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements18
  • Environmental impact assessment required, including riparian buffers, wetlands, and steep slopes, § 503.13.N

  • 67 dBA day and 57 dBA night at all property lines, § 503.13.R.1

  • Section 503.13.R requires a preliminary study at special exception, an interim study at building permit, and an as-built study six months after occupancy, using ANSI S1.4-2014 meters and generally accepted criteria.

  • Water resources impact study at 4,000 gpd with groundwater monitoring wells; no pump test or well restriction, § 503.13.L and M

  • Annual reports of daily withdrawals and groundwater levels; no drought plan, § 503.13.M.5

  • Sewage report including pollutant and heat removal methods, § 503.13.L.3

  • Stormwater management plan under Ordinance No. 2007-09 required, § 503.13.N

  • Interconnection agreement showing capacity with the application; no electrical inspection, § 503.13.O.

  • Substations and other accessory uses screened by the 100 ft buffer yard, § 503.13.D

  • Known impacts on electric rates must be noted, § 503.13.O

  • Section 503.13.D requires a 100-foot buffer yard of 100 percent evergreen trees along all property lines and streets, with a recorded note that any plant material which dies shall be replaced by the landowner, backed by a performance guarantee.

  • Low-reflective earth tone colors required; fluorescent and metallic colors barred, § 503.13

  • All equipment, fuel tanks, and batteries screened by the buffer yard and an 8 ft perimeter fence; no acoustic screening, § 503.13.D

  • Fire protection plan reviewed by the fire company, radio coverage, and Knox boxes; no annual update or posted contacts, § 503.13.P

  • Spill containment system for fuel and oils; no storage setbacks, § 503.13

  • Annual reports on water withdrawals and groundwater levels, § 503.13.M.5

  • Section 503.13.R allows the Township to revoke zoning permits if a sound violation is not remedied within 90 days of notification.

  • Affidavit of the owner and applicant or operator permission required; no end user, § 503.13.Q

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Special exception in the Industrial Commercial District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data