East Hempfield Township

Neutral Data Center Policies

East Hempfield Township adopted a resolution supporting a separate zoning review process for data centers. The resolution itself does not impose new building limits or freeze all applications.

Incentives

Financial Incentive
2

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · East Hempfield Township
The Supervisors unanimously adopted Resolution 2026-26 setting out specific findings of invalidity as to data centers.East Hempfield Township, Lancaster County — data-center resolution 2026-26

pending · East Hempfield Township
The draft, in a file dated August 19, 2026, follows Resolution 2026-26 of September 2, 2026 finding the zoning ordinance invalid as to data centers, is posted on the township's Pending Legislation page, and is listed for the Supervisors' December 2, 2026 agenda.East Hempfield Township, Lancaster County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose noise limits and sound testing, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements18
  • Conditional use; no approval expiration, § 270-5.2.RRR

  • Applicant must list environmental impacts and mitigation, § 270-5.2.RRR(10); no riparian buffer

  • 60 dBA day and 55 dBA night at any property line, above 50/45, Table 270-5.2.RRR.F

  • 70 dBC day and 55 dBC night; the daytime limit is above 60 dBC, Table 270-5.2.RRR.F

  • Pre-construction study at plan submittal and post-construction study 1 to 12 months after CO; none at building permit, § 270-5.2.RRR(6)(b)[1]-[2]

  • Generator testing only from 7:00 a.m. to 7:00 p.m.; no weekday limit or hours cap, § 270-5.2.RRR(6)(b)[4][a]

  • Only state and federal vibration requirements, § 270-5.2.RRR(9)

  • Water feasibility study with wells within 1,000 ft and site testing; no well restriction or pump test, § 270-5.2.RRR(8)(a)[1]

  • Projected water needs calculated; SRBC approval above thresholds, § 270-5.2.RRR(8)(a)[1]-[2]

  • Only state and federal stormwater requirements, § 270-5.2.RRR(9)

  • Emissions must meet applicable state and federal standards, § 270-5.2.RRR(8)(c)

  • Decommissioning plan for e-waste and hazardous materials, § 270-5.2.RRR(8)(d)

  • Substations and transformers visually and audibly screened, § 270-5.2.RRR(5)(a)

  • Industrial buffer yards of § 270-4.13.A(4) apply; width not stated in the draft, § 270-5.2.RRR(3)(d)

  • Ground and roof equipment screened on all sides to 12 ft and 10 ft, with audible screening, § 270-5.2.RRR(5)(a).

  • Emergency Response Plan approved by the Chief Fire Official, § 270-5.2.RRR(7)(b)

  • Decommissioning plan without financial security, § 270-5.2.RRR(8)(d)

  • Annual noise study at all property lines and monitored on-site acoustic sensors, § 270-5.2.RRR(6)(b)[3] and [6]

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: conditional use in the Enterprise zone

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data