East Chillisquaque Township
Anti-Data Center Policies
East Chillisquaque Township’s enacted ordinance sets cooling and water-use rules, requires funds for eventual removal, and imposes noise limits and sound testing; data centers may still be approved, but must meet these requirements.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · East Chillisquaque TownshipThe rules are in Ordinance 2026-2, which the Board of Supervisors enacted on July 6, 2026, according to the signed signature page.East Chillisquaque Township, Northumberland County — data-center ordinance (No. 2026-2)
What this means
The measure imposes cooling and water-use rules, money set aside for eventual removal and noise limits and sound testing. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements28
Water feasibility study covers nearby surface waters, but no buffer or environmental assessment, § 713.9.B
Material modifications to existing data centers must comply; no new approval or phasing plan for expansions, § 713.3
67 dBA weekday daytime and 57 dBA night and weekend at the property line, § 713.8
Section 713.8.A to C of Ordinance 2026-2 require preliminary, interim (building permit), and as-built sound studies six months after occupancy using ANSI S1.4 meters and generally accepted methodology, but the limits apply during normal operations and the as-built study is not required at full operating load.
Generator testing hours not addressed; limits do not apply during outages, § 713.8.E
Vibration study showing no vibration perceptible beyond the property line, § 713.8.F.
Wells limited to domestic use and cooling water barred from private wells, with a water feasibility study; no pump tests, § 713.9.B and § 713.10.C
Closed-loop cooling required and open evaporative cooling towers prohibited absent an exemption, § 713.10.A.
Projected water demand and use by purpose disclosed, with Susquehanna River Basin Commission approval above thresholds; no cap or reporting, § 713.9.B and C
Section 713.9.D requires the applicant to demonstrate that disposal of domestic, cooling, and industrial wastewater has been provided and approved by the Sewage Enforcement Officer or DEP, and Section 713.11 requires NPDES coverage for any blowdown or process discharge before building approvals.
Plan must show closed-loop heat recovery opportunities; no thermal impact plan, § 713.13.A
Decommissioning removes hazardous materials, cabling, and electrical components; no recycling plan, § 713.18.B
Electric provider must certify capacity and service; no third-party electrical inspection, § 713.13.B.1.
Plan showing how the design minimizes energy and water use; no on-site renewable requirement, § 713.13.A
New primary distribution lines must be buried; substations counted as accessory uses without placement or screening rules, § 713.13.C and § 713.2
Applicant pays undergrounding costs and must note known rate impacts; general grid upgrade costs not assigned, § 713.13.B.1 and C.3
50-ft buffer along all property lines with a landscaped screen at least 25 ft wide, § 713.7.A and B
Landscaped buffer must screen the facility from public view, with an 8-ft security fence; no equipment height or acoustic standard, § 713.7.B and C
Emergency Response Plan accepted by the fire department with posted 24-hour contact; no annual updates or radio coverage, § 713.14
Plan must ensure first responders receive system-specific training, § 713.14.B.2
Spill prevention and secondary containment for hazardous cooling fluids; no storage setbacks, § 713.12.A
Annual fire safety inspections by a qualified professional, § 713.14.B.2
Restoration of roads disturbed by undergrounding with possible financial security; no work hours or haul routes, § 713.13.C.1.e and C.3.b
Security of net cost plus 10 percent, notice within 48 hours, removal within 12 months, § 713.18.A, E, and F
Section 713.18.D requires a professional engineer's decommissioning estimate after the first year of operation and every fifth year thereafter, and Section 713.18.E requires Decommissioning Funds to be posted and maintained equal to Net Decommissioning Costs plus 10 percent, so the security follows the updated estimate.
One as-built sound study after occupancy and annual containment certification; no ongoing noise, water, or power reports, § 713.8.C and § 713.12.B
Noise violations found by the as-built study are ordinance violations, § 713.8.D
Township may require third-party validation of closed-loop claims; cost not assigned, § 713.11
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Special exception (districts not specified)
Sources
- eastchillisquaquetownship.com
- eastchillisquaquetownship.com
- eastchillisquaquetownship.com
- eastchillisquaquetownship.com
- eastchillisquaquetownship.com
- eastchillisquaquetownship.com
- eastchillisquaquetownship.com
- www.ckcog.com
- northumberlandcountypa.gov
- eastchillisquaquetownship.com
- eastchillisquaquetownship.com
- drive.google.com
- padatacenterordinances.org
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data