Earl Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Earl Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Earl Township
The draft was reviewed at the October 1, 2026 joint meeting of the Board of Supervisors and Planning Commission, and a draft notice enclosed with the township's October 22, 2026 Right-to-Know response lists a public hearing and possible enactment on November 16, 2026, although the township said the ordinance had not yet been advertised.Earl Township, Berks County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements31
  • Section 1237.A(15) requires 1,000 ft from any data center on another property, and the Section 302 definition treats parcels in a single land development plan as one data center, but lots under common ownership or control filed separately are not regulated as one use.

  • Building count capped, but no new approval required for added phases or capacity, § 1237.A(4)

  • Section 1237.I(1) sets 50 dBA day and 45 dBA night as 5-minute LAeq at residential and other sensitive receiving properties, measured with a Type 1 meter under ANSI/ASA S1.13-2020 and S12.18-1994 by a qualified acoustical consultant.

  • 60 dBC day and 55 dBC night at residential and similar receiving properties, § 1237.I(1)

  • Section 1237.J requires a preliminary study with the conditional use application, an interim study at building permit, and an as-built study within six months of occupancy once the data center is 50 percent occupied, using ANSI S1.4-2014 meters.

  • Testing and maintenance capped at 100 hours per year; no weekday daytime limit, § 1237.U(3)

  • Public water required and on-lot wells prohibited, with a water feasibility study; no pump test, § 1237.O and S

  • Section 1237.A(11) requires a closed-loop liquid-based cooling system and bars air cooling as the primary system, but it does not limit the water use of any evaporative heat rejection or tie it to the noise limits.

  • Quantity of water required and projected demands disclosed; no cap, reporting, or drought plan, § 1237.R and S

  • Cooling fluids and condensate removed off site, never discharged, and PPC Plan covering blowdown filed with the permit application, § 1237.A(11) and T

  • PPC Plan stormwater measures, oil and water separators, and fire water secondary containment, § 1237.A(13) and T

  • Natural gas generators must meet state and federal air rules; annual reports only if the Board requires them, § 1237.A(12) and U

  • Heat limited only to levels set by applicable law, § 1237.W

  • Removal of electronic equipment, batteries, and generators with recycling where practical; refrigerants not addressed, § 1237.DD

  • Utility interconnection agreement confirming capacity with the conditional use application; no electrical inspection, § 1237.L.

  • On-site generation limited to temporary emergency use, with generator setbacks, § 1237.N and U(6)

  • Substations and service lines concealed by landscaping and equipment kept in the rear yard; buried lines not required, § 1237.A(8) and N

  • Battery systems must meet applicable fire, building, and electrical codes; NFPA 855 not named, § 1237.A(13)

  • Section 1237.M requires an interconnection agreement from the electric service provider with the conditional use application, and Section 1237.Q makes the applicant pay for any utility upgrades, but neither requires the upgrades or their cost to be disclosed.

  • Berm and dense planted buffer next to homes and residential districts; width not set, § 1237.CC(3)

  • Facades must include at least two design elements every 100 ft, § 1237.CC(1).

  • Ground and rooftop equipment screened with noise mitigation; no 12-ft or all-sides standard, § 1237.CC(2)

  • Sections 1237.G and H require annual training for fire and EMS personnel at the operator's expense and specialized equipment provided to the local fire and EMS providers, but training is not required before occupancy and the equipment is not kept on site.

  • Spill containment and chemical inventory in the PPC Plan; no storage setbacks, § 1237.A(11) and T

  • Traffic impact study only above 50 peak-hour trips, § 1237.Y and § 1508.C

  • Secondary emergency access required; arterial or collector access not required, § 1237.E

  • Section 1237.DD requires security of at least 125 percent of net decommissioning cost, a utility agreement to report a 50 percent drop in consumption, and removal of electronic equipment, batteries, and generators within six months, but the agreement is not recorded and buildings are not required to be removed unless reused within two years.

  • Estimate at zoning permit and every fifth year; no first-year update, § 1237.DD

  • One as-built noise study after opening; annual generator reports only at Board discretion, § 1237.J(3) and U(8)

  • Operator must remediate noise violations; no specific penalties or revocation, § 1237.J(3)

  • Section 1237.S lets the Township retain professionals at the applicant's cost to review water impact studies, but the review is not tied to land development review and other studies are not covered.

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: conditional use in the I Industrial District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data