City of Duquesne
Anti-Data Center Policies
Duquesne does not specifically list data centers; in industrial districts, they may require special-exception approval and must meet general site and impact standards, including limits on noise and glare.
current law · City of DuquesneRequires data centers to follow general zoning rules; it does not set data-center-specific standards.Article VI: Supplemental Regulations, Duquesne Zoning Ordinance (§ 425-30)
What this means
Data centers are not specifically listed, so one may be treated as an “all other non-residential use” in the industrial district and require special-exception approval. General site and environmental rules also apply, including standards for noise, glare, and other impacts, creating review, cost, and delay without special data-center benefits.
People behind it
- City Council of the City of Duquesne
Adopted the zoning ordinance on June 14, 2017.
- Environmental Planning & Design, LLC
Identified as the preparer of the 2017 zoning ordinance.
- Zoning Officer
Designated to administer and enforce the zoning chapter.
Restrictions & requirementsHide restrictions & requirements4
A data center is not expressly listed as a use. If treated as an unlisted nonresidential use, it may be considered only through a special-exception application, with site plans and elevations and a showing that its impacts are no greater than those of a listed district use and that it meets health, safety, neighborhood, and other applicable standards. Unlisted nonresidential uses
Before construction, alteration, or a change or start of use, the applicant must obtain a certificate of zoning compliance; an occupancy permit is also required before using or occupying a structure or lot. Certificate required before specified activities and occupancy permit required
If treated as an all-other use for parking purposes, required off-street parking is determined through Planning Commission review. More generally, applicable new uses must provide off-street parking, and uses receiving or distributing goods by truck may also have to provide loading spaces. Parking for all other uses and loading requirements
New and existing uses must meet environmental operating standards. These include district-based noise limits (60 dBA in residential districts, 65 dBA in commercial districts, and 75 dBA in industrial and City Center districts), restrictions on glare and air pollution or odors, and compliance with applicable rules for toxic, hazardous, radioactive, flammable, or explosive materials. Standards apply to new and existing uses, noise limits, and hazardous-material requirements
Benefits & exceptionsHide benefits & exceptions2
In the M-1 district, an unlisted nonresidential use may apply for special-exception approval. The applicant must show, among other things, that the use’s impacts are no greater than those of uses listed for the district and that it meets applicable ordinance standards; the provision does not guarantee approval. Other nonresidential uses are listed for M-1.
A lawful nonconforming data-center use may expand by up to 50% in an industrial or special district, subject to applicable dimensional standards and limits: the expansion cannot make a conforming structure nonconforming, extend the use onto another lot, or reduce required parking or loading. The Zoning Hearing Board may allow a larger expansion for required parking/loading or to correct a hazardous or unsafe condition, if it is not materially detrimental to nearby properties or the City. Expansion limits for nonconforming uses.
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data