Borough of Dublin
Anti-Data Center Policies
Bucks County’s Newtown-area ordinance allows data centers through an approval process but limits where and how they can operate, with setbacks, minimum site sizes, and noise controls.
Rating and summary from Bucks County as there are no scored current or future laws outside temporary restrictions for Borough of Dublin.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
pending · Dublin BoroughThe draft is unnumbered and still includes the TC-1 district that the county Planning Commission recommended removing, and the Council's October 26, 2026 agenda listed a public hearing and consideration of adoption, whose outcome has not yet been posted.Dublin Borough, Bucks County — proposed data-center ordinance (None Adopted)
What this means
The proposal would impose noise limits and sound testing, setbacks from homes or other protected places and water-supply requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements17
45 ft maximum; rooftop equipment not limited, § 27-505.E(E8)(2)
Single 60 dBA CNEL limit at sensitive receptor properties and 70 dBA elsewhere, § 27-505.E(E8)(7)(a)
C-weighted and octave band levels must be shown acceptable; no numeric limit, § 27-505.E(E8)(7)(a)(v)
Sound study with the application and before occupancy; none at building permit, § 27-505.E(E8)(7)(d)
Public water service required for the use, with DRBC approval above withdrawal thresholds, § 27-505.E(E8)(8)(a) and (b)
Cooling methods using less water required; closed loop not mandated, § 27-505.E(E8)(8)(c)
Section 27-505.E(E8)(8)(d) of the October 2026 draft requires the applicant to demonstrate that disposal of domestic, cooling, and industrial wastewater has been provided and approved by DEP, but does not state that the approval must be in hand before the zoning permit.
Decommissioning plan removes electronics and batteries, with certified e-waste recycling, § 27-505.E(E8)(10)(a).
Utility capacity certification and third-party electrical inspection before occupancy, § 27-505.E(E8)(9)(a) and (b)
Known impacts on electric rates must be noted, § 27-505.E(E8)(9)(a)
25-ft landscape buffer, § 27-505.E(E8)(5)
Equipment within 100 ft of roads, residential districts, or receptors enclosed or screened; no height standard, § 27-505.E(E8)(6)
Third-party electrical inspection before occupancy, § 27-505.E(E8)(9)(b)
110% security before occupancy; no closure notice or removal deadline, § 27-505.E(E8)(10)(b)
One post-construction sound study, with later studies on request, § 27-505.E(E8)(7)(d)
Owner must remediate noise violations, § 27-505.E(E8)(7)(d)(iii)
Sound studies reviewed by a Borough-selected engineer; cost assigned only for decommissioning reviews, § 27-505.E(E8)(7)(d) and (10)(b)
Benefits & exceptionsHide benefits & exceptions1
Proposed approval pathway: Proposed: conditional use in the IND and TC-1 districts
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data