Drumore Township
Anti-Data Center Policies
Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.
Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Drumore Township.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
pending · Drumore TownshipThe Board of Supervisors authorized the township engineer to move the draft forward, it has been sent to the Lancaster County Planning Department for comment, and the township Planning Commission was scheduled to review it on October 27, 2026, with no outcome posted yet.Drumore Township, Lancaster County — proposed data-center ordinance (None Adopted)
What this means
The proposal would impose setbacks from homes or other protected places and minimum site-size requirements. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements18
Conditional use; no approval expiration
Section 553.A caps the aggregate footprint of all data center and data center accessory uses and structures at 100,000 square feet, and Section 1 defines accessory uses to include cooling infrastructure, substations, pump stations, and backup generators.
Section 553.D caps structures at 35 feet and limits roof-mounted equipment to 10 feet above the roof, which Section 553.F.1 requires to be fully screened, but the height limit for other principal buildings in the district is not in the draft text.
Section 553.M.3 requires the as-built study to show noise at residential property lines no greater than pre-construction levels, but no measurement method, L90 background, or floor is stated.
Pre-construction and post-construction noise studies
Noise and vibration study required
Public water required; no groundwater withdrawal
Closed-loop cooling encouraged only
Public sewer required with will-serve letter
Generators must meet EPA Tier 4; no testing reports
Total energy documentation required
Utility impact assessment and mitigation required
Ground equipment screened all sides to 12 ft; not acoustic
Emergency plan reviewed by fire company; 24-hour contact
Annual fire safety inspections
§ 553.U: security required, amount not set; start within 60 days
Security reviewed every 3 years and before sale
One post-construction noise study
Benefits & exceptionsHide benefits & exceptions1
Proposed approval pathway: Conditional use in the Commercial/Industrial zone (draft)
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data