Dover Township
Anti-Data Center Policies
Dover Township requires data centers to meet cooling, water-use and noise rules, complete studies and utility checks, and undergo sound testing; approval remains possible, but compliance and review add costs.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Dover TownshipThe rules are in Ordinance No. 2026-02, which the Board of Supervisors adopted on June 22, 2026.Dover Township, York County — data-center ordinance (No. 2026-02)
What this means
The measure imposes cooling and water-use rules, technical studies and utility checks and noise limits and sound testing. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements7
Warehouse use permitted by right
Single 55-decibel limit at the property line, § 27-680(3)(a)
Reclaimed water or other low-impact method required for cooling, § 27-680(3)(b)
Provider capacity verification and third-party inspection before occupancy, § 27-680(3)(d)
Power generators included in the data center definition, Ord. 2026-02 § 4
Substations included in the use and noise setback, § 27-680(3)(a)
Noise monitor reporting to the Township on an ongoing basis, § 27-680(3)(a)
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Permitted by right as a warehouse use in the Industrial zone
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data