Douglass Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Douglass Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Douglass Township
The unnumbered draft, which the township manager provided on October 20, 2026, has no date set for further discussion or a public hearing.Douglass Township, Berks County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose cooling and water-use rules, money set aside for eventual removal and noise limits and sound testing. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements34
  • Conditional use; no approval expiration, draft § 27-768.1

  • Allowed only in the GI district, which excludes agricultural districts; preserved farmland and agricultural security areas not addressed, draft § 27-768.1

  • Buildings 200 ft from all lot lines and a 300-ft buffer yard along residential lot lines, draft § 27-768.2.A(2)(a) and B(1)(a)

  • 200 ft from all lot lines and berms along sensitive receptor lot lines; substation setbacks from sensitive receptors left blank, draft § 27-768.2.A(2) and B(1)(d)

  • 35 ft including roof-mounted equipment, marked as an open drafting question; no 10-ft rooftop limit, draft § 27-768.2.A(5)

  • Riparian forest buffer of 100 ft on each side, wider on slopes over 10% and 25 ft wider at wetlands, draft § 27-768.2.R(5) to (7)

  • Campuses only encouraged to vary building size, with campus approval an open question; no separation rule, draft § 27-768.2.E(3)

  • Single CNEL limits of 60 dBA at sensitive receptors and 70 dBA at other developed property, draft § 27-768.2.F.1(a) and (b)

  • Applicant must show C-weighted and octave band noise at acceptable levels; no numeric dBC limit, draft § 27-768.2.F.1(e)

  • Pre-construction study with the application and post-construction study before occupancy; none at building permit, draft § 27-768.2.F.4

  • Generator testing only 9 a.m. to 3 p.m. on weekdays and capped at 100 hours per year, draft § 27-768.2.I(4)(c)

  • Closed-loop cooling required, with alternatives allowed; evaporative cooling not restricted, draft § 27-768.2.K(2)

  • Drought response plan required; no use cap or reporting, draft § 27-768.2.K(5)

  • Diesel generators must meet EPA Tier 4 with annual testing and reports to the township, draft § 27-768.2.I(4)(a) and (b)

  • Heat islands listed among impacts and waste heat recovery listed among green building practices; no thermal impact plan, draft § 27-768.2.N(5) and O(2)(e)

  • Decommissioning plan covers electronics, batteries, and cooling equipment with certified e-waste recycling; refrigerants not named, draft § 27-768.2.T(1)

  • Utility interconnection application, transmission security agreement, and energization date documented with the application; no third-party inspection, draft § 27-768.2.I(1)(f)

  • Energy usage plan required, and over 50 MW must buy 10% renewable power; no on-site renewable requirement, draft § 27-768.2.I(1) and (3)

  • Energy generation for normal operations is a separate principal use with its own approval and setbacks, draft § 27-768.2.J(1) and A(2)(e).

  • Substations at the side or rear and screened from public view; on-site lines of 34.5 kV or less buried, draft § 27-768.2.J(2) and (3)

  • 300-ft buffer yard with a landscape buffer along residential lot lines, draft § 27-768.2.B(1)(a) and (g).

  • Material and color limits of 80%, articulated main entrance, and articulation across 60% of facades, draft § 27-768.2.E(5)

  • Ground equipment behind an opaque wall and rooftop equipment screened on four sides; no 12-ft or acoustic standard, draft § 27-768.2.B(2)

  • Elevations or renderings of all facades required; no visual impact study, draft § 27-768.2.E(5)(f)

  • Plan reviewed by the fire department, in-building radio coverage, and 24-hour contact signs; no annual plan updates, draft § 27-768.2.S(1) to (3)

  • Plan must ensure first responders receive system-specific training; no funding, draft § 27-768.2.S(3)(e)

  • Types of stored materials disclosed in the impact analysis; no storage setbacks or containment, draft § 27-768.2.N(1)

  • Annual fire safety inspections; no third-party electrical inspection, draft § 27-768.2.S(3)(f)

  • Vehicle trips described in the impact analysis only; no traffic study

  • Security of 110% of decommissioning cost; no closure notice or removal deadline, draft § 27-768.2.T(2)

  • Township may require a new estimate no more often than every 5 years; no first-year update, draft § 27-768.2.T(2)

  • One post-construction sound study before occupancy, with later studies on request, draft § 27-768.2.F.4(c)

  • Owner must promptly remediate sound violations; no specific penalties, draft § 27-768.2.F.4(c)

  • Sound studies reviewed by a township-selected noise expert, cost not assigned, draft § 27-768.2.F.4(a)

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: conditional use in the GI District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data