Delaware Township

Anti-Data Center Policies

Delaware Township requires data centers to meet setbacks from homes and other protected places and minimum site sizes. Approval remains possible, but these limits substantially restrict suitable projects.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Delaware Township
The rules are an amendment to Zoning Ordinance 110 and its Section 901 definitions, which carries no separate ordinance number and which the Board of Supervisors adopted on July 8, 2026.Delaware Township, Pike County — data-center ordinance (Amendment To Ordinance 110 (No Number))

What this means

The measure imposes setbacks from homes or other protected places and minimum site-size requirements. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements31
  • Section 110.17 XX(B)(2)(b) limits buildings to 35 ft and bars rooftop equipment, but the amendment does not contain the height limits for other principal buildings in the Commercial and Rural Residential districts.

  • Environmental impact assessment required; no riparian buffer, § 110.17 XX(U)(3), (U)(4)(g)

  • Section 110.17 XX(G) requires a new conditional use approval for any expansion, intensification, change in operating capacity or cooling technology, added water or energy demand, or added accessory infrastructure.

  • 55 dBA day at the property line and 45 dBA night at sensitive receptors, § 110.17 XX(J)

  • Low-frequency noise must be limited by design; no dBC limit or study, § 110.17 XX(J)

  • Section 110.17 XX(J) requires ISO 9613-2 modeling with the application, a preliminary study at conditional use, an interim study at building permit, and an as-built study six months after occupancy using ANSI S1.4-2014 meters.

  • Generator testing per industry standards permitted; no hours limits, § 110.17 XX(J)

  • Vibration study showing none perceptible past the property line, § 110.17 XX(K)(3).

  • Water feasibility study and hydrogeologic report with aquifer test; no bar on wells for cooling, § 110.17 XX(P), (Q)

  • Closed-loop cooling to the extent feasible; evaporative cooling not restricted, § 110.17 XX(P)(5)

  • Quarterly groundwater withdrawal reports; no drought response plan, § 110.17 XX(S)

  • Cooling wastewater disposal approved by the SEO, authority, DRBC, or DEP as part of the application, § 110.17 XX(P)(6)

  • Stormwater management plan required; no added standards, § 110.17 XX(U)(4)(g)(iii)

  • Tier 4 generators required; no emissions testing or reports, § 110.17 XX(N)

  • Heat impacts must be disclosed and not perceptible at the property line; no reuse review, § 110.17 XX(K)(1), (U)(4)(f)

  • Decommissioning plan covers e-waste, batteries, and refrigerants disposal; no recycling requirement, § 110.17 XX(X)(6)-(7)

  • Utility certification of capacity with application and third-party electrical inspection before occupancy, § 110.17 XX(N)(3)-(4)

  • On-site power only encouraged; no energy usage plan, § 110.17 XX(N)(1)

  • Power generation for normal operations is a separate use with its own zoning approval, § 110.17 XX(N)(2).

  • Section 110.17 XX(N)(3) requires an interconnection agreement with the named electric service provider and makes the applicant pay the full cost of any needed infrastructure upgrades, but it does not require the upgrades or their cost to be disclosed.

  • 25-ft planted buffer, § 110.17 XX(C)(1)

  • Equipment within 500 ft enclosed or screened, with acoustic barrier; no 12-ft or all-sides standard, § 110.17 XX(I), (J)

  • Plan accepted by the fire department, with in-building radio coverage and 24-hour contact signs; no annual updates, § 110.17 XX(M)

  • Types and storage duration of materials disclosed; no storage setbacks or containment, § 110.17 XX(U)(4)(a)

  • Third-party electrical inspection before occupancy; no annual fire inspections, § 110.17 XX(N)(4)

  • Section 110.17 XX(U)(1) requires a traffic impact analysis covering construction and operation for roadways, intersections, and interchanges within one-half mile of the site.

  • Section 110.17 XX(X) requires 110 percent security, immediate notice of cessation, and removal within six months, but the agreement is not recorded and there is no rule that buildings come down unless lawfully reused within two years.

  • Section 110.17 XX(X)(5) requires decommissioning estimates after the first year of operation and every fifth year, and states that the financial security shall be updated every five years.

  • Quarterly water withdrawal and groundwater reports, § 110.17 XX(S)

  • Section 110.17 XX(J)(5) and (6) rescind the zoning permit after a failed as-built sound study and allow revocation if the violation is not remedied, but no notice and hearing is provided for revocation and Sections 616.1 and 617.2 of the MPC are not cited.

  • Applicant must name owner, developer, and operator; no end user, § 110.17 XX(Y)(2)

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the Commercial and Rural Residential districts

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data