Anti-Data Center Policies

Cranberry Township’s enacted ordinance sets setbacks, cooling and water-use rules, and noise limits with sound testing. Projects can still be approved, but siting and operating limits narrow where and how they can proceed.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Cranberry Township
The Board of Supervisors adopted these rules as Ordinance No. 2025-526 on April 24, 2025 by a 4 to 0 vote, according to the meeting minutes, and no later amendment on data centers was found.Cranberry Township, Butler County — data-center ordinance (No. 2025-526)

What this means

The measure imposes setbacks from homes or other protected places, cooling and water-use rules and noise limits and sound testing. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements10
  • Conditional use heard and decided by the Supervisors; approval expires if no application or permit is filed within 12 months, not tied to start of construction, § 27-702(7) and (11).

  • Section 27-705, Data Center item (1)(D), requires at least 300 feet between a data center and other similar uses, but the section does not regulate commonly controlled lots as one campus or apply performance limits to the combined output of nearby data centers.

  • Sound studies must show compliance with the § 27-313 octave-band limits at the lot line, reduced 5 dB at night; no dBA day and night limits, § 27-705 item 61(1)(E)

  • § 27-313 sets octave-band limits for low-frequency bands (74 dB at 20 to 75 Hz); no dBC limit, § 27-705 item 61(1)(E)

  • Pre-construction sound study with the proposal and post-construction study before occupancy; none at building permit, § 27-705 item 61(1)(E)

  • Latest water conservation technology including closed loop systems required; evaporative cooling not restricted, § 27-705 item 61(1)(G)

  • Letter from the electric provider certifying network capacity required with the proposal; no electrical inspection, § 27-705 item 61(1)(B).

  • Roof-mounted solar at the maximum allowance required; no energy usage plan, § 27-705 item 61(1)(F)

  • Rooftop and ground-mounted equipment fully screened from view and placed to shield sound; no minimum screen height, § 27-705 item 61(1)(E)(1)-(2).

  • Post-construction sound study is due before occupancy; no report after opening, § 27-705 item 61(1)(E)

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the TLI Transitional Light Industrial District