Covington Township

Anti-Data Center Policies

Covington Township’s enacted ordinance requires setbacks, cooling and water-use controls, and noise limits and testing. Data centers can still seek approval, but these limits narrow where and how they can operate.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Covington Township
The standards in § 27-6A04 were set by Ordinance No. 1-2026, which the Board of Supervisors adopted on April 13, 2026 and which is codified on eCode360.Covington Township, Tioga County — data-center ordinance (No. 1-2026)

What this means

The measure imposes setbacks from homes or other protected places, cooling and water-use rules and noise limits and sound testing. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements22
  • Conditional use approved by the Board of Supervisors; no one-year expiration of approval, § 27-6A04(1)

  • Prohibited in all districts other than LI, which excludes agricultural districts; preserved farmland and agricultural security areas not addressed, § 27-6A04(1)(b)

  • Section 27-6A04(11) requires a new conditional use approval for any increase in building area, electrical capacity, generator capacity, server density, or water usage, but it does not exempt like-for-like replacement.

  • Section 27-6A04(4)(a) and (b) set 50 dBA from 7:00 a.m. to 10:00 p.m. and 40 dBA at night at the nearest residential property line or sensitive use, but no metric, meter class, or measurement procedure is stated.

  • Compliance shown by an independent acoustical study at the applicant's expense; no building permit or post-opening study, § 27-6A04(4)(c)

  • Section 27-6A04(5)(b) limits generator testing to weekdays from 10:00 a.m. to 4:00 p.m. and to one hour per month, but the cap has no exception for longer tests required by code.

  • Section 27-6A04(8)(a) requires closed-loop cooling systems, but it does not bar evaporative cooling or limit any evaporative system to a stated water-use rate shown to meet the noise limits.

  • Total anticipated water use disclosed; annual reporting only if the Board requires it, § 27-6A04(8)(b)-(c)

  • Decommissioning and site restoration plan required, but no disposal or recycling terms, § 27-6A04(12)(a)

  • Applicant must show adequate electrical infrastructure; utility capacity documentation only if the Township requires it, § 27-6A04(6)(b)-(c)

  • Engineer's report on peak load and total projected consumption; on-site generation only if the Board requires it, § 27-6A04(6)(a), (d)

  • Board may require on-site or dedicated generation to offset demand, § 27-6A04(6)(d)

  • Substations and transformers held to the use's setbacks, § 27-6A04(3)

  • Section 27-6A04(6)(e) makes required electrical improvements the applicant's sole expense, and Section 27-6A04(6)(c) only allows the Township to request utility documentation identifying required upgrades, so disclosure of the upgrades is not required.

  • Enhanced landscaping and buffering next to residential districts, dwellings, and sensitive uses, with no width set, § 27-6A04(9)

  • Backup generators fully enclosed and sound-attenuated; other equipment screening not addressed, § 27-6A04(5)(a)

  • Emergency response and safety plan reviewed by the Township and local emergency providers, § 27-6A04(10)(a)

  • Applicant must coordinate with the local fire department, § 27-6A04(10)(b)

  • Decommissioning plan and security of 100% of estimated cost; no closure notice or removal deadline, § 27-6A04(12)(a)-(c)

  • Security reviewed and adjusted every five years; no first-year update, § 27-6A04(12)(d)

  • Periodic electrical and annual water reporting only if required as a condition of approval, § 27-6A04(6)(f), (8)(c)

  • Independent acoustical study at the applicant's expense; no general Township expert review, § 27-6A04(4)(c)

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the LI Light Industrial District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data