Cooper Township
Anti-Data Center Policies
Cooper Township requires technical studies, utility checks, noise limits, and sound testing for data centers, increasing review and compliance costs; approval remains possible.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Cooper TownshipOrdinance 2026-0608 added these rules after a joint hearing on June 8, 2026, and the joint code lists it as adopted June 11, 2026.Cooper Township, Montour County — data-center ordinance (No. 2026-0608)
What this means
The measure imposes technical studies and utility checks and noise limits and sound testing. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements16
ID district height applies; no data center height limit
67 dBA day and 57 dBA night at the property line, Section 250-45.5.C(1)
Section 250-45.5.C(1)(a) to (c) require preliminary (conditional use), interim (building permit), and as-built sound studies six months after occupancy using ANSI S1.4 meters and generally accepted methodology, but the limits apply during normal operations and the as-built study is not required at full operating load.
Vibration study showing none perceptible past the property line, Section 250-45.5.C(3).
Water feasibility study for nonpublic sources; no bar on wells for cooling, Section 250-45.5.D(2)
Water use for cooling must be described; no cooling method required, Section 250-45.5.D(2)(c)
Projected water demand disclosed, Section 250-45.5.D(2)(a)
Section 250-45.5.D(4) requires the applicant to demonstrate that adequate disposal of domestic, cooling, and industrial wastewater has been provided and approved by the Sewage Enforcement Officer or DEP.
Utility certification of capacity; no electrical inspection, Section 250-45.5.E(1).
On-site generation for normal operations is a separate use with its own approval, Section 250-45.5.E(2).
20-ft planted buffer next to residential districts and roads, Section 250-45.5.B
Emergency response plan accepted by the fire department; no annual update, radio, or contacts, Section 250-45.5.F(1)
Plan must ensure responder training; no funding, Section 250-45.5.F(1)(d)
Annual fire safety inspections, Section 250-45.5.F(1)(e)
One as-built sound study after opening, Section 250-45.5.C(1)(c)
As-built noise exceedance is a violation; general enforcement only, Section 250-45.5.C(1)(c)
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the ID Industrial Development District