Concord Township
Anti-Data Center Policies
Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.
Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Concord Township.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
pending · Concord TownshipTownship Council closed the public hearing on October 14, 2026 and accepted the final draft, and the township has stated that Council will vote on the ordinance at its November 4, 2026 public meeting.Concord Township, Delaware County — proposed data-center ordinance (None Adopted)
What this means
The proposal would impose setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements25
Conditional use before Township Council; no approval expiration, § 210-154.D(1)
35 ft including roof equipment, but 45 ft allowed with 50 more feet of setback, § 210-154.D(2)(h)
52 dBA day and 45 dBA night LAeq at residential property lines; day limit above 50 dBA, § 210-154.D(11)(b)
Ambient level becomes the limit where it exceeds Table 1; no numeric cap above background, § 210-154.D(11)(a)(iv) and (b)(xi)
Pre-construction study and post-construction study 1 to 3 months after occupancy; none at building permit, § 210-154.D(11)(a)
Wells and surface withdrawals barred as the cooling source; all water from a public utility, § 210-154.D(8)(a) and (b)
Closed-loop cooling required, with alternatives allowed; evaporative cooling not restricted, § 210-154.D(8)(c)
Water capacity certification and a curtailment agreement for water emergencies; no cap or usage reporting, § 210-154.D(8)(d) and D(16)
Wastewater Discharge Analysis including cooling blowdown, with Sewer Department capacity allocation before conditional use approval, § 210-154.D(8)(f)
Tier 4 Final generators with annual testing reports to the Township, § 210-154.D(7)(a) and (b)
Thermal Impact Mitigation Plan including waste heat reuse review, § 210-154.D(9).
Electronic Waste Plan for servers, batteries, and hazardous materials; refrigerants in decommissioning, § 210-154.D(13) and (15).
Utility application and interconnection documentation with utility verification; no electrical inspection, § 210-154.D(5)(b).
Energy Usage Plan and LEED BD+C design; no required on-site renewables, § 210-154.D(5)
Substations at side or rear and screened; lines of 34.5 kV or less buried, § 210-154.D(6)
Section 210-154.D(5)(b)(ix) requires the applicant to pay for upgraded substations, transmission taps, and lines if the regional suppliers find them necessary, and Section 210-154.D(5)(b)(viii) requires an analysis of effects on electric rates and availability, but the required grid upgrades are not identified or disclosed.
50-ft planted buffer, § 210-154.D(3)(a)
10-ft security fence, substation screening, and generator enclosures; no full equipment screening, § 210-154.D(4), (6), and (7)
Plan reviewed by the Fire Marshal and emergency services; no annual updates, radio coverage, or posted contacts, § 210-154.D(12)(a)
Fire suppression and spill water contained on site and Safety Data Sheets for cooling chemicals; no storage setbacks, § 210-154.D(8)(f)
Annual fire safety inspections by a qualified professional, § 210-154.D(12)(a)(iv)
Plan, 90-day closure notice, and bond set by the engineer before occupancy; no 110% or removal deadline, § 210-154.D(15)
Annual generator reports and one post-occupancy noise and vibration study, § 210-154.D(7) and (11)
Any noise increase above baseline deemed a violation; no specific penalties or revocation, § 210-154.D(11)(a)(iv)
Township consultants may require supplemental plans; cost of their review not assigned, § 210-154.D(5), (9), and (13)
Benefits & exceptionsHide benefits & exceptions1
Proposed approval pathway: Proposed: conditional use in the LI Light Industrial District
Sources
- cms9files.revize.com
- delcopa.gov
- delcopa.gov
- chaddsfordlive.com
- chaddsfordlive.com
- citizenportal.ai
- www.thecooldown.com
- www.zoneomics.com
- cms9files.revize.com
- www.townshipofconcord.com
- cms9files.revize.com
- cms9files.revize.com
- www.townshipofconcord.com
- cms9files.revize.com
- chaddsfordlive.com
- padatacenterordinances.org
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data