Clifton Township
Anti-Data Center Policies
Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.
Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Clifton Township.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
pending · Clifton TownshipThe revised draft dated October 14, 2026 would replace Ordinance 3-2025, which the Lackawanna County Court of Common Pleas declared void on August 19, 2026, and the Planning Commission's October 28, 2026 agenda listed review of the revised draft, which the township solicitor said must be re-advertised and brought to another public hearing before any adoption.Clifton Township, Lackawanna County — proposed data-center ordinance (None Adopted)
What this means
The proposal would impose noise limits and sound testing, setbacks from homes or other protected places and limits on backup generators or on-site power. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements33
300 ft from residential zoning districts, increasing 4 ft per foot of height above 55 ft, § 27-602.C(38)2.e.i
45 ft building height with roof equipment up to 10 ft more (55 ft combined), above the 40 ft standard, § 27-602.C(38)2.e.vii
Environmental Impact Study required with the conditional use application, § 27-602.C(38)2.g
Expansions must file an Energy Usage Plan and thermal plan, but no new approval or phasing plan is required, § 27-602.C(38)2.k.ii, m.ii
60 dBA day and 50 dBA night at existing dwellings and R-1 and OS districts (65 and 55 dBA in C and I), § 27-706.B.b.iii
Section 27-706.B.b.i caps noise at 10 dBA above the Ambient Noise Level, which is defined as an average Leq and measured under ANSI/ASA S1.13 (Section 27-706.B.d.iii).
Section 27-602.C(38)2.l.iii requires a preliminary study with the conditional use application and an as-built survey six months after occupancy, using ANSI S1.4-2014 meters.
Must meet the vibration limits of § 27-706; no vibration study required, § 27-602.C(38)2.l.i
Hydrogeologist water needs analysis and feasibility study, with aquifer testing when withdrawals exceed 25,000 gpd; wells not barred where public water is available, § 27-602.C(38)2.j, 602.C(40)5
Cooling technologies must be described in the Thermal Impact Mitigation Plan; closed loop not required, § 27-602.C(38)2.m.iv.2
Section 27-602.C(38)2.j.vii requires gauged wells with monthly reports to the Township, and the drought response plan tied to state, supplier, or local declarations appears only for Large-Scale Water Extraction under Section 27-602.C(40)5.d.
Section 27-602.C(38)2.j.viii requires the applicant to demonstrate that disposal of domestic, cooling, and industrial wastewater has been provided and approved by the Sewage Enforcement Officer or DEP, with an off-site disposal plan if unsewered.
Stormwater thermal impact analysis required; other stormwater rules stated as applying, § 27-602.C(38)2.m.iv.6, m.x
Diesel backup generators must meet at least EPA Tier 4; no annual emissions testing or reports, Item 5 definition
Thermal Impact Mitigation Plan required, but review of waste heat reuse is not required, § 27-602.C(38)2.m
Utility interconnection agreement or feasibility study showing capacity with the conditional use application; no third-party electrical inspection, § 27-602.C(38)2.k.ix.
Energy Usage Plan required; rooftop solar is only an effort to document, and the 10% renewable rule over 50 MW is off-site supply, § 27-602.C(38)2.k.ii-x
On-site power generation is a separate principal use with its own conditional use approval and 500 ft setbacks, § 27-602.C(38)2.k.xi, 602.C(39).
Electrical substations are Data Center Accessory Uses subject to the use setbacks; no burial of lines, Item 3 definition
NFPA 75 required for all structures; NFPA 855 not cited, § 27-602.C(38)2.n.i
Owner solely responsible for all utility-required contributions and interconnection costs, and must identify rate impacts, § 27-602.C(38)2.k.ix.
100 ft woodland buffer along all exterior property lines, planted where woods are insufficient, § 27-602.C(38)2.b-c.
Dark Sky International compliant fixtures required; no light trespass standard, § 27-602.C(38)2.f.v
Equipment screened from roads and homes, and four-sided acoustical barriers if needed to meet noise limits; no minimum screen height, § 27-602.C(38)2.e.xi, l.ii
Emergency Response Plan required and kept current, with fire chiefs' annual review of the fire water supply; no radio coverage requirement, § 27-602.C(38)2.g, n
Section 27-602.C(38)2.n.i and n.iv require the operator to make representatives available for annual training and to provide specialized equipment identified in the Emergency Response Plan at its expense.
Secondary containment for petroleum fuel storage; no storage setbacks, § 27-602.C(38)2.f.i
Section 27-602.C(38)2.g.i requires a Traffic Study with every conditional use application, covering employees per shift and traffic after construction is completed.
Decommissioning plan required; financial security optional at the Township's discretion, § 27-602.C(38)2.o
Plan updated every 7 years, but no cost estimate is required, § 27-602.C(38)2.o
Monthly reports of water drawn by each well, § 27-602.C(38)2.j.vii
Section 27-602.C(38)2.l.iv and v allow the zoning permit to be rescinded or revoked for an uncured noise violation.
Sections 27-602.C(38)2.k.v and m.vii require the applicant to reimburse consultant review of the energy and thermal plans, and Section j.iii.6 requires a Township-selected hydrogeologist at applicant expense, all within the conditional use application.
Benefits & exceptionsHide benefits & exceptions1
Proposed approval pathway: Proposed: conditional use in the Industrial (I) District