Chartiers Township

Anti-Data Center Policies

Chartiers Township’s enacted ordinance requires setbacks from homes and other protected places, plus water-supply measures, increasing project costs; data centers can still be approved.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Chartiers Township
The rules are in Ordinance No. 424, which the Board of Supervisors adopted on July 28, 2026.Chartiers Township, Washington County — data-center ordinance (No. 424)

What this means

The measure imposes setbacks from homes or other protected places and water-supply requirements. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements25
  • Water impact study only; no riparian buffer or impact assessment

  • Single 65 dB limit at the property line, Ord. 424 § F.1

  • Ordinance 424, Article II, Section 2(F)(1), requires preliminary, interim, and as-built sound studies using ANSI S1.4 sound level meters, with the as-built study six months after the certificate of occupancy, but does not require any study at full operating load.

  • Testing frequency reported annually; no hours limit

  • Vibration study showing none perceptible past the property line, Ord. 424.

  • Public water required and well water barred; water impact study, Ord. 424 § G

  • Water-conserving technology including closed-loop systems; evaporative cooling not restricted, Ord. 424 § G.2

  • Ordinance 424, Section 2(G)(5) and Section 4(3)(c), require annual water usage reports to the Township, but Section 2(G)(3) only calls for conservation during drought conditions without tying it to state, basin commission, or supplier drought declarations.

  • Ordinance 424, Section 2(G)(7), requires disposal of cooling and industrial wastewater to be provided and approved by DEP and the other listed authorities, and Section 3(4) requires copies of the applicable DEP permits as part of the zoning permit submission.

  • Batteries, refrigerants, and e-waste disposed of at decommissioning; no recycling plan, Ord. 424 § II.K

  • Utility capacity documentation; no electrical inspection, Ord. 424.

  • Energy Sustainability Plan required; renewables only encouraged, Ord. 424

  • Substations placed toward the site interior and screened; no line burial, Ord. 424 § E and § F.4

  • Ordinance 424, Section 2(H)(1) to (4), requires utility documentation identifying any transmission, distribution, substation, or related improvements required, written utility certification, and a Power Infrastructure Impact Study, with the applicant paying all costs, but does not require an estimated cost, the tariff terms, or an executed service agreement.

  • 25-ft landscape buffer, Ord. 424 § II.D

  • Equipment within 300 ft of roads or residential land enclosed or screened, Ord. 424 § II.E

  • Plan reviewed by the fire department, annual update, 24-hour contact signs; no radio coverage, Ord. 424 § II.I and § 4

  • Hazardous materials list, spill prevention, and secondary containment; no storage setbacks, Ord. 424 § II.I.1

  • Annual fire safety inspections; no electrical inspection, Ord. 424 § II.I

  • 115% security and notice of cessation; 12-month removal, Ord. 424 § II.K

  • Estimate and security updated every 5 years; no first-year update, Ord. 424 § II.K.3

  • Quarterly noise, vibration, water, and energy reports for two years and annual permit reports, Ord. 424 § 4

  • Ordinance 424, Section 4(4)(b), allows the Township to suspend or revoke the annual permit following notice and an opportunity to be heard, and Section 4(4)(a)(iii) allows revocation for repeated or willful violations, but the ordinance does not provide for enforcement under Sections 616.1 and 617.2 of the Municipalities Planning Code.

  • Ordinance 424, Section 3(1), requires a $5,000 fund, with costs above it reimbursed, for Township administrative, inspection, and engineering costs under the zoning permit provisions, not in land development review.

  • Operator name required on site signs; no developer or end user disclosure, Ord. 424 § 3

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the I-1 Industrial district

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data