Chanceford Township’s enacted ordinance allows data centers but sets building-height limits and setbacks from homes and other protected places, increasing construction, compliance, or review costs.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Chanceford TownshipThe rules are in Ordinances 2026-1 and 2026-2, which the Board of Supervisors enacted on January 5, 2026.Chanceford Township, York County — data-center ordinance (Nos. 2026-1 And 2026-2)
What this means
The measure imposes setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements20
200-ft setback from all property lines, § 2.C (Ord. 2026-2)
200-ft setback from all property lines and wider buffer yards within 500 ft of schools, day care centers, hospitals, and parks, § 2.C and § 2.O.3
20-ft building height, but screened rooftop equipment may exceed it, § 2.B and § 2.O.2(b)
Riparian forest buffer of 100 ft on each side, wider on steep slopes and at wetlands, § 2.X
Single 24-hour CNEL limit of 60 dBA at sensitive receptors and 65 dBA elsewhere, § 2.F.1
Public water connection required; no hydrogeologic study, § 2.A.4
Reclaimed water for cooling encouraged only, § 2.T
Water use not disclosed or capped
Stormwater management plan required, § 2.S.3
Emission sources identified only; no generator emission standard
Disposal of materials must comply with state and federal rules, § 2.P.3
Utility capacity letter and third-party electrical inspection before occupancy; no confirmation before approval, § 2.I
Rooftop solar required on buildings over 400,000 sq ft where feasible; no energy usage plan, § 2.Y
Substations screened and placed at the side or rear; on-site lines of 34.5 kV or less buried, § 2.L
Planted buffer yard of 100 to 300 ft next to or within 500 ft of residential properties, § 2.O.3.
Low-reflective earth tone colors required and metallic colors barred, § 2.Q.
Ground equipment behind an opaque wall and rooftop equipment screened on four sides; no 12-ft or acoustic standard, § 2.O.2
In-building radio coverage and 24-hour contact signage; no emergency plan, § 2.M and § 2.R
Third-party electrical inspection before occupancy; no annual inspections, § 2.I.5
Trip generation described only; no traffic study
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Special exception in the General Commercial District
Sources