Chadds Ford Township
Anti-Data Center Policies
Chadds Ford Township’s enacted ordinance requires setbacks, minimum site sizes, and cooling and water-use limits for data centers. Projects can still seek approval, but these rules narrow where they can be built and how they can operate.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Chadds Ford TownshipThe current rules are in Ordinance No. 184, which the Supervisors adopted unanimously on April 8, 2026.Chadds Ford Township, Delaware County — data-center ordinance (No. 184)
What this means
The measure imposes setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements31
Conditional use with Supervisors hearing; approval expires if construction not begun in 12 months, § -3.D and J
Section -4.B sets a 40-foot all-inclusive height with rooftop equipment recessed 5 feet below the roofline, but the LI-1 district limit for other principal buildings is not in the ordinance text that was read.
Riparian buffers of 100 to 200 ft and 200-ft water setback; no steep slope widening, § -5.D and § -9
Added demand over 10% or new outdoor equipment requires conditional use amendment, § -3.
55 dBA day and 52 dBA night limits, § -7.A.3
Section -7.A.1 caps sound at 3 dBA above the pre-construction ambient level from a 30-day baseline study that includes the quietest night hour, measured as Leq under Section -7.A.2.
65 dBC at residential property lines, § -7.C.1
Baseline study before approval and audits at 30 days and 6 months; none at building permit, § -7.E
Section -8.C.5 and C.7 limit generator use to emergencies and routine testing of no more than 1 hour per generator per month, weekdays from 10:00 a.m. to 4:00 p.m., or as otherwise required by law.
Hydrogeologist water feasibility study for non-public sources; no cooling-well bar or pump tests, § -8.B.3
Closed-loop air-cooled or dry cooling required; evaporative and open-loop cooling prohibited, § -8.A
Section -7.E.3 requires an annual third-party compliance certification that, with the tenant reporting provisions, covers water use, and Section -20.B funds verification of water consumption reports, but the DRBC drought provision in Section -8.B.7(c) is only a waiver of caps, not a drought response plan.
Section -7.H.6(a) bars cooling discharge to storm sewers and allows sanitary discharge only with an approved pretreatment agreement and a DEP WQM permit, or zero liquid discharge, but does not require these approvals before the zoning permit.
Section -7.H.6(b) designates the site a stormwater hotspot with structural BMPs treating 100% of runoff, and Section -11 requires containment of fire suppression water, but no spill containment is required for fuel, generator, and transformer areas.
EPA Tier 4 Final generators with SCR and filters; no annual emissions testing, § -7.H.3 and § -8.C.6
2 degree F heat limit with CFD modeling; no waste heat reuse review, § -7.H.2
Utility certification and interconnection agreement before building permit; no electrical inspection, § -8.C
50% renewable energy sourcing, on-site or off-site; on-site renewables not required, § -8.C.8
Substation screened by 8-ft wall and on-site lines buried; no side or rear placement rule, § -5.F and G, § -18.F
Section -8.C.2 requires a Grid Impact Study identifying peak load and required transmission upgrades, and Section -8.C.3 and Section 18.E require the applicant to fund them, but the estimated cost, tariff terms, and an executed service agreement before the zoning permit are not required.
8-ft berm and double evergreen row facing homes; no buffer width, § -6.A and B
Visual simulation and balloon test from historic vantage points; public roads not required, § -5.M
Emergency plan approved by fire marshal and fire company, 24-hour contact signs; no annual update or radio coverage, § -11 and § -13
Hazardous materials inventory and fire-water containment; no storage setbacks, § -14.B.3(a) and § -11.G
Annual testing and reporting of generators, batteries, and suppression systems, § -11.C
Section -14.B.1(c) requires a traffic study in every Environmental and Community Impact Analysis covering trip frequencies, construction equipment deliveries, and fuel deliveries, but no study area reaching an arterial or interchange is stated.
150% security, abandonment after 12 months; no closure notice or removal deadline, § -17
Estimate updated annually and security reviewed every 5 years, § -17.A.1(c) and B
Annual noise compliance certification and water and power monitoring, § -7.E and § -8
Section -20.A requires an Administrative Escrow at the time of the conditional use application to pay township consultants who review the application and its studies.
Ultimate parent entity of operator disclosed; end user not required, § -16.A
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the LI-1 District