Center Township

This restriction takes precedence for the map color while in effect.

Anti-Data Center Policies

Center Township has enacted a 180-day pause on covered data-center applications or development, while officials have time to address zoning gaps. This may delay projects but does not ban every data center.

Incentives

Financial Incentive
3

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Center Township
The supervisors approved Data Center Curative Amendment Resolution No.Center Township, Butler County — data-center resolution 2026-07-07

What this means

The measure starts a protected period for local officials to fix gaps in their zoning rules. This can delay developers who need to challenge the old rules, but it does not by itself prohibit every data-center project.

Sources

current law · Center Township
The supervisors unanimously approved a curative amendment and a 180-day halt on data center and power generation development while an ordinance is drafted.Center Township, Butler County — data-center moratorium / curative resolution moratorium (2026-06-10)

What this means

The measure pauses covered data-center applications or development for 180 day. That stops affected projects from moving ahead during the pause, even though it is not a permanent ban.

Timing

Ends
180-day; exact operative ending date not independently verified.

The supervisors unanimously approved a curative amendment and a 180-day halt on data center and power generation development while an ordinance is drafted.

Sources

pending · Center Township
The draft amends Chapter 20 and has not been adopted, and the township tentatively expects adoption in December 2026, after the 180-day moratorium the supervisors approved on June 10, 2026.Center Township, Butler County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose money set aside for eventual removal, noise limits and sound testing and setbacks from homes or other protected places. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements26
  • 100 ft buffer beyond the required setback from residential properties, Section 1508.A.42.A.1

  • Sensitive Receptor defined but no setback set

  • Base ordinance sound limits of Section 20-1402 stated as applying, Section 1508.A.42.I.1

  • Sound modeling study with the application and as-built study 6 months after occupancy, Section 1508.A.42.I.2

  • Generator testing may exceed the sound limits by up to 20 dBA only on weekdays from 8:00 a.m. to 5:00 p.m., for 1.5 hours per 7 days; testing at other times is allowed if it meets the limits, Section 1508.A.42.I.3.e

  • Sound and vibration study against base ordinance standards, Section 1508.A.42.I.2

  • Water supply feasibility study at the Planning Commission's discretion, Section 1508.A.42.J

  • Alternative cooling means must be provided; closed loop not required, Section 1508.A.42.J

  • Section 1508.A.42.K.1 of the draft requires the applicant to demonstrate that disposal of domestic, cooling, and industrial wastewater has been provided and approved by the Sewage Enforcement Officer, Pennsylvania American Water, or DEP, but does not state that the approval must be in hand before the zoning permit.

  • EPA and DEP documentation that emissions are below permit thresholds, Section 1508.A.42.E

  • General removal of all equipment at decommissioning, Section 1508.A.42.N.1

  • Utility certification of capacity for grid connections; no electrical inspection, Section 1508.A.42.L.1.

  • Generation for normal operations is a separate use with a separate permit, Section 1508.A.42.L.2.

  • Known rate impacts must be noted, Section 1508.A.42.L.1

  • Buffer at least 100 ft wide beyond the setback next to residential properties, Section 1508.A.42.A.1.

  • Fully shielded cutoff fixtures with 0.5 footcandle limit at the property line, Section 1508.A.42.C

  • Fence materials only; no equipment screening, Section 1508.A.42.B

  • Emergency Response Plan accepted by the fire department and resubmitted every 3 years; no radio coverage or contact signs, Section 1508.A.42.F and H

  • Annual fire safety inspections, Section 1508.A.42.F.1.e

  • Section 1508.A.42.M of the draft requires a traffic impact study for every application addressing daily operational traffic and emergency access, but does not cover construction traffic or set a study area reaching the nearest arterial or interchange.

  • Construction noise limited to weekday and Saturday morning hours; no haul routes or bond, Section 1508.A.42.I.3.f

  • 110% security and removal within 12 months; no notice of closure, Section 1508.A.42.N.1 and N.3

  • Plan and cost estimate updated every 5 years; no first-year update, Section 1508.A.42.N.2

  • One as-built sound study after occupancy, Section 1508.A.42.I.2.b

  • As-built noise violation treated as a violation of the ordinance, Section 1508.A.42.I.2.b

  • Applicant-funded escrow pays Township staff and consultants to review the emergency and decommissioning plans only; studies such as the sound and traffic studies not covered, Sections 1508.A.42.H.4 and N.4

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: conditional use (districts not stated in the draft)