Carroll Township
Anti-Data Center Policies
Carroll Township’s enacted rules set setbacks from homes and other protected places while retaining an approval route, but available information is insufficient to determine their overall impact.
Incentives
Financial Incentive2
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Carroll TownshipThe rules are in Ordinance No. 2026-1, which the Board of Supervisors adopted on May 5, 2026.Carroll Township, Washington County — data-center ordinance (No. 2026-1)
What this means
The measure imposes setbacks from homes or other protected places. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements19
60 dBA weekday day and 57 dBA night and weekend at the property line, Ord. 2026-1
Must show dBC and octave bands kept at acceptable levels; no numeric dBC limit, Ord. 2026-1
Ordinance 2026-1, Section 3F.1, requires preliminary, interim, and as-built sound studies using ANSI S1.4 sound level meters, with the as-built study six months after the certificate of occupancy, but does not require any study at full operating load.
Vibration study showing none perceptible past the property line, Ord. 2026-1.
Water feasibility study including wells within 1,000 ft; no pump test or cooling-well bar, Ord. 2026-1
Projected water demand disclosed in the feasibility study, Ord. 2026-1
Ordinance 2026-1, Section 3H.3, requires the applicant to demonstrate that disposal of domestic, cooling, and industrial wastewater is provided and approved by the Sewage Enforcement Officer or DEP, but does not state that the approval must be in hand before the zoning permit.
Heat must not be perceptible past the property line; no heat disclosure or reuse plan
Electric provider must certify capacity; no electrical inspection, Ord. 2026-1 § I.1.
Generation for normal operations is a separate use with its own approval, Ord. 2026-1 § I.2.
Substations screened and at side or rear; on-site lines of 343 kV and below buried, Ord. 2026-1 § I.3 to I.5
NFPA 855; fire department battery-fire capability review, no required suppression system, Ord. 2026-1 § J
25-ft landscape buffer, Ord. 2026-1 § D
Two design elements every 150 horizontal feet, Ord. 2026-1 § K.
Equipment within 600 ft of roads or residential land fully enclosed or screened, Ord. 2026-1 § E
Plan accepted by the fire department and 24-hour contact signs; no annual update or radio coverage, Ord. 2026-1 § J
Owner must upgrade fire department equipment and training only if it lacks capability, Ord. 2026-1 § J.4
Township may inspect; no annual or opening inspection, Ord. 2026-1 § M
One as-built sound study six months after occupancy, Ord. 2026-1
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the A-1, M-1, and M-2 districts
Sources
current law · Carroll TownshipThe Board of Supervisors adopted Ordinance No. 2026-3, which added data center definitions and use chart amendments.Carroll Township, Washington County — data-center ordinance / amendment 2026-3 (2026-06-02)
What this means
A score of -3 is assigned as the requested fallback because the available sources do not provide enough detail to assess the impact. It should not be read as a source-confirmed finding of significant barriers.
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data