Loading map…

Borough of California

Anti-Data Center Policies

California borough’s enacted ordinance requires data centers to keep away from homes and other protected places. Approval remains possible, but siting and operating limits narrow where projects can proceed.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · California Borough
The rules are in Ordinance No. 594, which amends Zoning Ordinance 562 and which Borough Council adopted on July 9, 2026, according to the signed copy posted on the borough website.California Borough, Washington County — data-center ordinance (No. 594)

What this means

The measure imposes setbacks from homes or other protected places. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements21
  • Conditional use in the MU, M1, I, I2, I3, and I4 districts only, and not permitted in any residential, agricultural, or commercial district, Ord. No. 594, Art. I Sections 2 and 3.A

  • Conditional use heard and decided by Borough Council; approval expires if a zoning permit is not obtained within 12 months or construction is not completed within 18 months, Ord. No. 562 Sections 715.3 and 715.8

  • 60 ft including roof-mounted equipment, above the 30 to 50 ft limits for other principal buildings in the allowed districts, Ord. No. 594, Art. I Section 3.C(1)

  • 60 dBA weekday daytime and 57 dBA nights and weekends at the property line, by ANSI S1.4 meters; daytime limit above 50 dBA, Ord. No. 594, Art. I Section 3.F(1)

  • Preliminary study in the conditional use or land development process, interim study at building permit, and as-built study six months after the certificate of occupancy, using ANSI S1.4 meters, Ord. No. 594, Art. I Section 3.F(1)(a) to (c)

  • Limits do not apply during power outages; no testing hours or cap, Ord. No. 594, Art. I Section 3.F(2)

  • Public water certification or, for nonpublic sources, a water feasibility study with safe yield; no pump test requirement, Ord. No. 594, Art. I Section 3.G(1) to (3)

  • Water feasibility study must describe water used for cooling, only for nonpublic sources; no cooling method rule, Ord. No. 594, Art. I Section 3.G(3)(c)

  • Projected water demand disclosed for nonpublic sources; no metering, reporting, or drought plan, Ord. No. 594, Art. I Section 3.G(3)(a)

  • Applicant must show disposal of domestic, cooling, and industrial wastewater has been provided for and approved by the Sewage Enforcement Officer or DEP, Ord. No. 594, Art. I Section 3.G(4)

  • Data centers must own and use a private self-supply power system; no utility capacity documentation, Ord. No. 594, Art. I Section 3.H(1)

  • Battery storage must meet NFPA 855 with battery-specific fire suppression, Ord. No. 594, Art. I Section 3.I(2)

  • 25-ft landscape buffer with evergreen trees next to A1, R1, R2, R3, C1, and C2 districts and sensitive receptors; below 100 ft, Ord. No. 594, Art. I Section 3.D

  • Facades facing roads, listed districts, or homes need two of three design elements every 150 horizontal feet, Ord. No. 594, Art. I Section 3.J

  • Equipment within 600 ft of roads, listed districts, or sensitive receptors fully enclosed or fully screened; no height or acoustic standard, Ord. No. 594, Art. I Section 3.E(1)

  • Conditional use application must show elevations of proposed structures; no visual impact study, Ord. No. 562 Section 715.2

  • Emergency Response Plan reviewed and accepted by the fire department and emergency management services; no annual update or walk-through, Ord. No. 594, Art. I Section 3.I(1)

  • First responders must receive system-specific training, and the owner must supply equipment and annual training only if the fire department lacks the ability to suppress battery fires, Ord. No. 594, Art. I Section 3.I(1)(d) and (4)

  • ERP provides for annual fire safety inspections by a qualified professional; no report to a municipal official, Ord. No. 594, Art. I Section 3.I(1)(e)

  • One as-built sound study, with later studies at the borough option, Ord. No. 594, Art. I Section 3.F(1)(c)

  • As-built noise violation is a violation of the ordinance; general enforcement only, Ord. No. 594, Art. I Section 3.F(1)(c)

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the MU, M1, I, I2, I3, and I4 districts

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data