Caernarvon Township

Anti-Data Center Policies

Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.

Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Caernarvon Township.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

pending · Caernarvon Township
Draft version 6 was sent to the Berks County Planning Commission for review on September 30, 2026, and the township administrator said on October 19, 2026 that a special Planning Commission meeting will be held on November 2, 2026 to finalize the draft before it goes to the Board of Supervisors.Caernarvon Township, Berks County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. The limits sharply reduce usable sites or workable project designs, making development substantially harder despite an available approval route.

Restrictions & requirementsHide restrictions & requirements35
  • Conditional use in the I-1 Limited Industrial District only and prohibited elsewhere, Section 3.A-B.

  • Conditional use hearing before the Supervisors; approval expires if no land development application within 6 months, not tied to construction within 1 year, Section 3.C and 3.H.

  • Section 4.B sets an all-inclusive 40 ft limit with rooftop mechanical equipment recessed 5 ft below the roofline, but the I-1 district height limit for other principal buildings is not in the ordinance text read (draft v.6).

  • Riparian buffers of 100 to 200 ft on each side, with a 200-ft minimum for data centers at any stream, wetland or water body, Section 5.E and 9.B

  • Increases in noise, power over 10%, water use, equipment or footprint require an amended conditional use with a new hearing, Section 3.E.

  • 55 dBA day and 52 dBA night at sensitive receptors and 57 dBA at other lot lines, above the 50 and 45 dBA standard, Section 7.B(4)

  • Section 7.B(1) bars any increase over the pre-construction ambient level measured by a 30-day baseline study with stated instrumentation and methodology (Section 7.A(1)), but the baseline is not an L90 and no floor is set below which the cap does not apply.

  • 65 dBC at lot lines with homes; no separate day and night dBC limits, Section 7.D

  • Baseline study with the application and as-built audits at 180 and 365 days; no study at building permit, Section 7.A(1)-(2)

  • Section 7.B(5) and Section 8.C(5) and (7) limit routine generator testing to 10:00 a.m. to 4:00 p.m., Monday through Friday, at no more than 1 hour per generator per month, while allowing operation as otherwise required by law.

  • Public water required and private high-yield wells barred for cooling, with a hydrological impact analysis, Section 8.A(2) and 8.B(1)-(2)

  • Closed-loop air-cooled chillers or dry cooling required, with evaporative, open-loop and once-through cooling prohibited, Section 8.A

  • Cap of 1,500 gpd per MW for non-cooling uses, real-time water monitoring, and a drought stress test and reduction plan, Section 3.I(4), 8.B(1) and 8.B(7).

  • Wastewater characterization study and pre-treatment permit required before any discharge, with blowdown barred from storm sewers and waters, Section 7.H(6) and 8.B(4).

  • The Stormwater Hotspots provision of Section 8 (draft v.6) designates the site a Stormwater Hotspot with structural BMPs treating 100 percent of runoff for hydrocarbons and heavy metals, but no spill containment is required for fuel, generator, and transformer areas (the Section 11 secondary containment addresses fire suppression water only).

  • EPA Tier 4 Final generators with SCR and DPF, annual generator reports and boundary air monitors, Section 7.H(3)(b) and 8.C(6),(12)

  • Heat island limit of 2 degrees F at the lot line verified by CFD modeling; no waste heat reuse review, Section 7.H(2)(c)

  • Section 14.B(3)(b) requires evidence of a binding contract for disposal or recycling of servers and hazardous components, and Section 17.A(1) covers batteries and refrigerants in decommissioning, but no on-site storage rules or duty to keep the contract in effect are stated.

  • Utility certification and interconnection agreement before approval; no third-party electrical inspection before occupancy, Section 8.C(1) and 15.A(3).

  • Grid impact study of peak load required; no energy usage plan or on-site renewable requirement, Section 8.C(2)

  • On-site generation for normal operations treated as a separate use meeting its own zoning requirements, Section 8.C(4).

  • Substations screened by an opaque buffer and 8-ft masonry wall and shielded by the principal building, with on-site lines buried, Section 5.G-H and 18.F

  • Section 8.C(2) requires a Grid Impact Study identifying required transmission upgrades and off-site improvements, and Sections 8.C(1) and 18.C require an Interconnection Agreement and an executed curtailment agreement, but no estimated upgrade cost or tariff terms are required.

  • 8-ft planted berm along lines facing homes and roads; no buffer width stated, Section 6.A-B

  • ERP approved by the Fire Marshal and fire chief, with annual system testing and 24-hour contact signage; no in-building radio coverage or annual plan updates, Section 11 and 13

  • Hazardous materials barred from riparian buffers, inventory disclosed, and secondary containment of fire water runoff, Section 9.E(6), 11.G(3) and 14.B(3)(a).

  • Annual Fire Marshal safety inspections; no third-party electrical inspection before occupancy, Section 20.B(3)

  • Section 14.B(1)(c) requires a traffic study in every ECIA covering trip frequencies and types, heavy equipment delivery during construction, and fuel deliveries, but the study area is not required to reach the nearest arterial or interchange.

  • Access roads sized for fire apparatus only; no road class or secondary access requirement, Section 11.E(3)

  • 150% security and removal within 12 months of discontinuance; no notice of closure or 6-month removal, Section 17

  • Cost estimate updated annually and security reviewed every 5 years, Section 17.A(1)(c) and 17.B

  • Annual third-party compliance certification and real-time noise, water and power monitoring, Section 3.I(4)-(5) and 7.A(3)

  • Section 19.C requires written notice of violation and an opportunity to cure before cease and desist orders, Section 21.D allows the Board of Supervisors to revoke or suspend the conditional use after a public hearing for habitual non-compliance, and Section 21.B enforces penalties under MPC Section 617.2.

  • Section 20.A requires an administrative escrow at the time of the conditional use application to pay the Township's consultants to review the application and studies and testify at hearings, which is review at the zoning stage rather than in land development review.

  • Applicant must disclose the ultimate parent entity of the operator; no developer or end user disclosure, Section 16.A

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: conditional use in the I-1 Limited Industrial District