Buffalo Township

Anti-Data Center Policies

Buffalo Township has enacted a data-center measure requiring setbacks from homes and other protected places, narrowing where projects can locate while retaining an approval route. The effects of another enacted measure are unclear.

Incentives

Financial Incentive
2

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Buffalo Township
The rules are in Section 265-58.4 of the zoning code, added by Ordinance No. 115-2025 on December 17, 2025, and amended by Ordinance No. 118-2025 on March 4, 2026.Buffalo Township, Washington County — data-center ordinance / amendment 118-2025

What this means

The measure imposes setbacks from homes or other protected places. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements21
  • Section 265-58.4.A(2) bars data center uses within 1,000 feet of any residential use, measured radially from the data center building and any exterior equipment to the residential property.

  • Environmental impact assessment and baseline air and water testing, § 265-58.4.A(23)

  • Single CNEL limits of 60, 65, and 75 dBA by zone, § 265-58.4.A(16)

  • Pre-construction study with the proposal and post-construction study before occupancy; none at building permit, § 265-58.4.A(15)

  • Maintenance 7 a.m. to 6 p.m. with a 120-hour annual generator cap; not limited to weekdays, § 265-58.4.A(25)

  • Water needs analysis and provider capacity letter, § 265-58.4.A(4)

  • Closed-loop systems required; evaporative cooling not restricted, § 265-58.4.A(21)

  • Anticipated raw water needs disclosed, § 265-58.4.A(4)

  • Drainage facility inspections every three years; no added stormwater design standards, § 265-58.4.A(19)

  • Baseline air testing only; no generator emission standard

  • Utility capacity letter and executed agreement; no third-party electrical inspection, § 265-58.4.A(3).

  • On-site generation must be housed in a building with fire suppression; not a separate use, § 265-58.4.A(3)(a)

  • Lines buried; substations not screened or placed, § 265-58.4.A(18)

  • Rooftop and ground equipment fully screened and shielded for sound; no 12-ft standard, § 265-58.4.A(15).

  • Annual review of the emergency response plan, annual drill, and updated contacts; no fire company plan review or radio coverage, § 265-58.4.A(28) and (29)

  • Section 265-58.4.A(6) requires the developer or operator to provide annual firefighting training and to supply any special equipment to the fire companies at its expense, but training before occupancy is not required and the equipment is given to the fire companies rather than kept on site.

  • Township inspections on notice only

  • Road identification, road maintenance agreement, and road bond; no work hours, § 265-58.4.A(12) to (14)

  • 150% security, but no closure notice or removal deadline, § 265-58.4.A(31)

  • Security amount reviewed annually, § 265-58.4.A(31)

  • One post-construction sound study before occupancy; annual reports omit noise, water, and power, § 265-58.4.A(15) and (29)

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the Rural Agricultural, Highway Commercial, and Light Industrial districts

Sources

current law · Buffalo Township
The hearing was continued to this date, and the Supervisors adopted Ordinance No. 115-2025, which added the data center regulations to the zoning code.Buffalo Township, Washington County — data-center ordinance / amendment 115-2025 (2025-12-17)

What this means

A score of -3 is assigned as the requested fallback because the available sources do not provide enough detail to assess the impact. It should not be read as a source-confirmed finding of significant barriers.

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data