Loading map…

Buffalo Township

Neutral Data Center Policies

Buffalo Township allows data centers by right in designated districts, but they must meet noise limits and sound-testing requirements, along with other site and operating conditions.

Incentives

Financial Incentive

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Buffalo Township
The rules are in Section 627 of the zoning chapter, added by Ordinance 25-02, which the zoning chapter lists as adopted on December 1, 2025.Buffalo Township, Union County — data-center ordinance (No. 25-02)

What this means

The measure allows data centers by right in designated districts, subject to noise limits and sound testing. The clearer approval route offers a modest benefit, but it does not remove the remaining site and operating conditions.

Restrictions & requirementsHide restrictions & requirements13
  • Permitted by right with site plan review, § 407(1)(jj) and § 627(3)

  • Stacked shipping container housings limited to 9 ft, § 627(2)(k)

  • Existing operations covered only on expansion; no new approval for added capacity, § 627(1)(b)

  • Section 627(2)(c) bars a daytime continuous sound level above 50 dBA or a nighttime level above 45 dBA at an occupied residential building or sensitive receiver over any 15-minute interval, and Section 627(2)(d) and (g) require a calibrated Type I meter, A-weighted Leq with slow time weighting over 15 minutes, and ANSI S12.9 terminology.

  • One-third octave flat-weighted measurements required; no dBC limit, § 627(2)(d)

  • Only a noise test report before occupancy; no study before construction, § 627(2)(e). Version 2.0 gives 1 point to studies with no stated method, so the noise test report before occupancy earns 1 point.

  • Water provider capacity verification before occupancy, § 627(2)(o)

  • Water use not disclosed

  • Utility capacity letter and third-party electrical inspection before occupancy; no confirmation before approval, § 627(2)(n)

  • 20-ft landscaped screen next to residential uses, § 407 area standards (h)

  • Third-party electrical inspection before occupancy, § 627(2)(n)(4)

  • Removal within 3 months of notice after 12 months of abandonment; no financial security, § 627(2)(p)

  • One noise test report before occupancy, § 627(2)(e)

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Permitted use in the Commercial and Manufacturing District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data