Buffalo Township

Anti-Data Center Policies

Buffalo Township’s enacted measure gives local officials time to address zoning gaps, which may delay developers challenging existing rules but does not ban all data-center projects.

Incentives

Financial Incentive
2

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Buffalo Township
The supervisors adopted Resolution 2026-8, declaring the zoning ordinance partially invalid for not providing for data centers and starting a 180-day municipal curative amendment.Buffalo Township, Butler County — data-center resolution 2026-8

What this means

The measure starts a protected period for local officials to fix gaps in their zoning rules. This can delay developers who need to challenge the old rules, but it does not by itself prohibit every data-center project.

Sources

pending · Buffalo Township
The draft, dated October 19, 2026 and not yet finalized, follows Resolution 2026-8 of August 12, 2026, and on October 14, 2026 the supervisors voted to send it to the Butler County Planning Commission for review, with adoption expected in December 2026.Buffalo Township, Butler County — proposed data-center ordinance (None Adopted)

What this means

The proposal would impose noise limits and sound testing, setbacks from homes or other protected places and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.

Restrictions & requirementsHide restrictions & requirements34
  • 250 ft from every exterior Site boundary for buildings and 300 ft for Power Equipment and cooling equipment, § 337.3.2

  • Additional 300-ft truck setback from schools, day care centers, hospitals, and care homes; parks not protected, § 337.3.2

  • Data Center Site of contiguous lots regulated as one unified plan; no separation distance, Section 1 definition

  • Section 337.12.1 requires a new or amended conditional use before adding land, increasing a building envelope or an approved demand maximum, adding Power Equipment or outdoor cooling units, or increasing simultaneous generator operation, and Section 337.12.2 lets the Zoning Officer approve replacement equipment of unchanged size, capacity, and sound power without a new hearing.

  • 55 dBA day and 45 dBA night LAeq at the Site boundary; daytime limit above 50 dBA, § 337.7.1

  • 70 dBC day and 60 dBC night LCeq, above the 60 and 55 dBC standard, § 337.7.1

  • Sound report with application and field verification before the zoning certificate and within 90 days of operation; no building permit stage study, §§ 337.7.5 and 337.11

  • Testing Monday to Friday, 8:00 a.m. to 5:00 p.m., capped at 50 hours per generator per year, § 337.5.2

  • Numeric limit of 0.10 in/s at the Site boundary with a predicted vibration report; not a no-perceptible standard, § 337.7.7

  • Domestic and cooling water only from a public water system or trucked water, so wells are not allowed, § 337.4.3

  • Once-through cooling barred and cooling system described; recirculating evaporative cooling allowed, §§ 337.2.6 and 337.4.3

  • Approved maximum daily and annual water use with daily metering records; no drought response plan, §§ 337.1 and 337.4.6

  • Cooling blowdown documented with sewer-provider acceptance and discharge permits before discharge, § 337.4.5.

  • Required stormwater approvals still apply and basins kept outside the buffer, §§ 337.1 and 337.3.3

  • Air-emission inventory and conformity with DEP and federal authorizations; no Tier 4 requirement, §§ 337.2.7 and 337.10.4

  • Report on planned efficiency and waste-heat-recovery measures; no thermal impact plan, § 337.11.3

  • Waste plan covering electronic equipment and spent batteries; refrigerants not addressed, § 337.10.3

  • Will-serve letter before the hearing record closes and provider confirmation before operation; no third-party electrical inspection, §§ 337.4.1 to 337.4.2.

  • Utility plan with peak megawatts and annual megawatt-hours; no on-site renewable requirement, § 337.2.3

  • Principal generating facility is a separate use requiring its own authorization; no separate setbacks, Section 1 definition and § 337.5.5

  • Substations treated as Power Equipment with 300-ft setback and opaque screening; no placement or burial rule, §§ 337.3.2 and 337.6.3

  • Energy storage must meet the Uniform Construction Code and fire codes; NFPA 855 not named, § 337.10.2

  • Utility plan identifies required system extensions and the party responsible; no cost assignment, § 337.2.3

  • Sections 337.6.1 and 337.6.2 require a 100-ft buffer inside every exterior Site boundary with two staggered rows of evergreens next to residential uses, and require dead or missing trees to be replaced within 90 days.

  • Architectural taste excluded as an approval criterion; no design standards, § 337.1

  • Ground Power Equipment and cooling equipment walled on all sides to at least 12 ft with acoustic louvers, § 337.6.3.

  • Plan submitted to the fire department, updated annually, with 24-hour contacts; no in-building radio coverage, § 337.10.1

  • Annual on-site familiarization session offered; payments to emergency services expressly not required, §§ 337.10.1 to 337.10.2

  • Section 337.3.2 sets fuel tanks 300 ft from every exterior Site boundary, Section 337.3.5 keeps them out of flood areas, wetlands, and a 50-ft stream strip, and Section 337.10.3 applies state and federal containment and requires any legally required spill plan, but no setback from wells is stated.

  • Field verification before the zoning certificate for each phase; no annual fire inspection, § 337.11.1

  • Section 337.9.3 requires a traffic study with every application covering peak-hour counts, trips by phase, and construction truck trips and routes, but the analysis is limited to the driveway and road-owner permit criteria and does not extend to the nearest arterial or interchange.

  • Construction hours Monday to Saturday, 7:00 a.m. to 7:00 p.m., and permit delivery routes; no road damage bond, § 337.9.4

  • Security of 110 percent and closure notice trigger, but removal within 12 months, §§ 337.13.1 to 337.13.3

  • Township Engineer reviews the decommissioning estimate; review costs limited to the fee schedule, §§ 337.13.3 and 337.14.2

Benefits & exceptionsHide benefits & exceptions1
  • Proposed approval pathway: Proposed: conditional use in the M-2 Manufacturing District

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data