Brady Township

Anti-Data Center Policies

Brady Township limits data-center sites through setbacks, minimum size, and cooling and water rules, while a protected period may delay challenges but does not prohibit all projects.

Incentives

Financial Incentive
2

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Brady Township
The township secretary reported that the Supervisors adopted both ordinances on October 12, 2026, but the copies provided are unsigned and unnumbered, so the final text and ordinance numbers are not confirmed.Brady Township, Lycoming County — data-center ordinance (Number Not Provided)

What this means

The measure imposes setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements29
  • Water feasibility study maps surface waters, habitats, and Sink impacts; no riparian buffer, § 430.C.4 to C.5

  • Limits vary by receiving district; least protective is 65 dB day and 55 dB night at industrial properties, § 430.B.13(o)

  • Unweighted peak and pure tone limits; no dBC limit, § 430.B.13(q) to (r)

  • Sound modeling with the application and as-built study six months after occupancy; no building permit stage study, § 430.B.16

  • Backup generator testing limited to 9:00 a.m. to 5:00 p.m. Monday through Friday and 100 hours per year, Electricity Generation Facility ordinance § 429.E

  • ISO 2631-2 residential criteria of 200 µm/s with a vibration study; not a no-perceptible standard, § 430.B.15 to B.16.

  • Hydrogeologic report with aquifer test for groundwater use of 50,000 gpd or more; wells not barred where public water exists, § 430.C.3 to C.5

  • Section 430.B (Water Supply, Closed Loop Cooling System) requires all interior spaces and equipment to be cooled by a closed loop system that reuses water or other coolant, but evaporative systems are not barred or limited to a stated water-use rate and shown to meet the noise limits.

  • Quarterly reports of daily groundwater withdrawals; no drought response plan, § 430.C.13

  • Water study describes discharges and their temperature; no approved cooling discharge plan, § 430.C.4(d)

  • DEP air approvals required for combustion generation serving a data center, Electricity Generation Facility draft § 429.C.1

  • Decommissioning plan covers disposal or recycling of equipment and batteries, § 430.E

  • Provider documentation of available capacity; no third-party electrical inspection, § 430.C.21.

  • Energy Sufficiency Plan required only for on-site generation, Electricity Generation Facility draft § 429.F

  • Section 430.C.22 treats any generation system supplying the data center during normal operations as a separate use approved under the regulations for that use, but the Section 429 Electricity Generation Facilities standards are not in the text read, so equal noise and emission standards cannot be confirmed.

  • Rate and capacity impacts must be noted, § 430.C.21

  • 100-ft landscape buffer next to residential districts and Sensitive Receptors, § 430.B.1.

  • Equipment within 300 ft enclosed or screened; no height or acoustic standard, § 430.B.11

  • Emergency Response Plan reviewed by the fire department with annual inspections; no annual updates or radio coverage, § 430.C.23

  • Applicant must provide specialized firefighting equipment that local departments lack, § 430.C.25.

  • Fuel and hazardous materials addressed in the decommissioning plan, § 430.E

  • Annual fire safety inspections, § 430.C.23(e)

  • Construction noise limited to daytime hours; no haul routes or road bond, § 430.B.14(f)

  • Security equal to 100 percent of cost, removal within 18 months after a one-year start, § 430.E

  • Estimate may be revised at request no more often than every 5 years; no required update, § 430.E

  • Quarterly reports on daily water withdrawals and well levels, § 430.C.13

  • Security drawdown and equity action for water impacts; as-built noise violation is an ordinance violation, §§ 430.B.16(b) and C.17 to C.18

  • Section 5 of the amending ordinance makes the applicant pay all recoverable review costs, including professional consultant fees, through an application deposit, but the deposit covers review and adjudication of the conditional use application rather than land development review.

  • Data Center Operator defined but not required to be named

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the I-1 Industrial District

Sources

current law · Brady Township
The supervisors adopted Resolution 2026-03 to proceed with a curative amendment of the zoning ordinance to regulate data centers.Brady Township, Lycoming County — data-center resolution 2026-03

What this means

The measure starts a protected period for local officials to fix gaps in their zoning rules. This can delay developers who need to challenge the old rules, but it does not by itself prohibit every data-center project.

Sources

Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data