Town of Bloomsburg
Anti-Data Center Policies
Pennsylvania requires data centers over 25 megawatts to obtain local approvals and meet power, grid-cost, environmental, and community commitments; covered facilities also face annual energy and water reporting. These rules make large projects harder, not impossible, while eligible centers may receive equipment tax breaks.
Rating and summary from Pennsylvania statewide as there are no scored current or future laws outside temporary restrictions for Town of Bloomsburg.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
pending · Bloomsburg TownTown Council posted the draft on October 12, 2026 and held a workshop on it on October 13, 2026, no hearing date has been announced, and the current zoning, Ordinance No. 1055 of June 3, 2024, does not address data centers.Bloomsburg Town, Columbia County — proposed data-center ordinance (None Adopted)
What this means
The proposal would impose setbacks from homes or other protected places, limited eligible locations and cooling and water-use rules. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements33
Draft creates a Data Center Overlay District, but the parcel list is left blank, so the district limit is not yet set, Section 3
300 ft front, side, and rear yard setbacks; no setback specific to homes, Section 5 (§27-402), Dimensional Standards
Environmental Impact Statement required, Section 5 (§27-402), Environmental Impact Statement
Section 5 (Section 27-402) of the draft requires a phasing plan, bars any campus phase from proceeding until prior phases comply, and requires the Energy Demand Analysis to state projected electrical demand for each phase and cumulative load at full build-out, but no new approval is required for added capacity.
Noise study must include octave-band and low-frequency noise analysis; no dBC limit, Section 5 (§27-402), Noise Study
Preliminary noise study with application and as-built study six months after occupancy; no building permit study, Section 5 (§27-402), Noise Study
Generator testing allowed under manufacturer and industry standards; no hours or time limits, Section 5 (§27-402), Noise Study
Section 5 (Section 27-402), Vibration Impact Analysis, caps vibration at 0.1 in/sec PPV at the property line during operations with a required vibration study, but it names only PPV or the then current industry standard rather than a stated measurement method.
Groundwater and surface water barred for cooling and water from a PUC-regulated supplier or SRBC approval; no hydrogeologic study or pump test, Section 5 (§27-402), Utilities and Groundwater Protection
Only air-cooled or sealed non-evaporative closed-loop cooling; evaporative cooling prohibited, Section 5 (§27-402), Cooling System Requirements
Utility Infrastructure Plan covers wastewater, and cooling systems that generate wastewater or discharge are prohibited, Section 5 (§27-402), Utility Infrastructure Plan and Prohibited Cooling Systems
SALDO and Stormwater Management Plan stated as applying; no added standards, Section 5 (§27-402), Compliance Required and Environmental Impact Analysis
Backup power must meet DEP and EPA air-quality standards; Tier IV generators may be required but are not mandated, Section 5 (§27-402), Energy Demand Analysis and Energy Infrastructure
Heat Plume Mitigation Plan with dispersion modeling; no waste heat reuse review, Section 5 (§27-402), Heat Plume Mitigation Plan
Decommissioning Plan covers removal of hazardous materials, batteries, and transformers and BESS recycling; servers and refrigerants not named, Section 5 (§27-402), Decommissioning Plan and BESS Analysis
Utility capacity letter with the application and will-serve letter at preliminary land development; no electrical inspection, Section 5 (§27-402), Utility Capacity Letter and Utilities.
Energy Demand Analysis and minimum on-site renewable generation of 30% of monthly consumption, Section 5 (§27-402), Energy Demand Analysis and Renewable Energy Requirement.
On-site generation systems must be described and nuclear systems are prohibited; no separate use approval, Section 5 (§27-402), Energy Demand Analysis and Prohibition on Nuclear Energy Systems
Substations are accessory uses and screening must minimize their visibility; no placement or burial rule, Section 4 and Section 5 (§27-402), Landscaping and Buffering Plan
BESS must meet NFPA 855; fire suppression is described but not specifically required, Section 5 (§27-402), BESS Analysis
Utility documentation must show required upgrades and responsibility for them; cost not assigned to the applicant, Section 5 (§27-402), Energy Demand Analysis
Landscaping and screening plan required; no buffer width, Section 5 (§27-402), Landscaping and Buffering Plan
Full cut-off fixtures for horizontal surfaces and shielding to avoid neighboring windows; no zero light trespass rule, Section 5 (§27-402), Lighting Plan
Screening must minimize visibility of mechanical equipment and substations; no height or acoustic standard, Section 5 (§27-402), Landscaping and Buffering Plan
Glare visual impact plan only when requested; no renderings or elevations required, Section 5 (§27-402), Lighting Plan
Emergency Response Plan coordinated with Town emergency service providers; no annual updates, radio coverage, or posted contacts, Section 5 (§27-402), Emergency Access Plan
Hazardous materials management in the ERP and BESS spill containment; no storage setbacks, Section 5 (§27-402), Emergency Access Plan and BESS Analysis
Construction hours and designated truck routes set; no road damage bond, Section 5 (§27-402), Construction-Phase Requirements
Decommissioning Plan with financial security of unstated amount; no closure notice or removal deadline, Section 5 (§27-402), Decommissioning Plan
Security adjusted every three years; no update after the first year, Section 5 (§27-402), Decommissioning Plan
Annual reporting on the 30% renewable energy requirement, Section 5 (§27-402), Renewable Energy Requirement
Noise violation found in the as-built study is a violation of the ordinance requiring corrective action, Section 5 (§27-402), Noise Study
Section 5 (Section 27-402) requires the applicant to reimburse the Town for its selected professional's review of decommissioning cost updates and for an independent vibration evaluation that confirms a violation, but it does not assign the cost of consultant review of the applicant's studies in land development review.
Benefits & exceptionsHide benefits & exceptions1
Proposed approval pathway: Proposed: conditional use in a Data Center Overlay District