Blooming Grove Township
Neutral Data Center Policies
Blooming Grove Township allows data centers in designated districts through a special permit or conditional-use review, providing a path to approval but adding time and uncertainty.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Blooming Grove TownshipThe current rules are in Ordinance No. 79, which the Board of Supervisors enacted on July 13, 2026.Blooming Grove Township, Pike County — data-center ordinance (No. 79)
What this means
The measure provides a route for data centers through a special permit or conditional-use review in designated districts. That offers legal certainty, but the extra approval step can add time and uncertainty.
Restrictions & requirementsHide restrictions & requirements29
Sec. 2: conditional use before the Board of Supervisors; no 1-year expiration of approval
Section 4.B sets a 35 ft maximum for data centers and accessory uses inclusive of rooftop equipment, but the ordinance as read does not include the district height limits for other principal buildings in the C and MU districts.
Sec. 4(K)(3) and (K)(4)(g): environmental impact study and assessment required; no riparian buffer
Section 4.P requires a new conditional use approval for any expansion, intensification, change in operational capacity or cooling technology, increase in water or energy demand, or added accessory infrastructure, but it contains no exemption for like-for-like replacement.
Sec. 4(D)(1): 60 dBA day and 55 dBA night at the property line; 45 dBA night at Sensitive Receptor lines
Sec. 4(D)(1): only requires latest technology to limit low-frequency noise; no dBC limit or study
Section 4.D(1) and (2) require preliminary, interim, and as-built sound studies using ANSI S1.4 sound level meters, with the as-built study six months after the certificate of occupancy, but the as-built study is not required to be taken at full operating load.
Sec. 4(D)(3): generator testing as required by industry standards permitted; no hours limits
Sec. 4(E)(3): vibration study showing none perceptible beyond the property line.
Sec. 4(J)(2): water feasibility study for nonpublic sources; no bar on wells for cooling or required pump tests
Sec. 4(J)(5): closed-loop cooling only to the extent feasible; evaporative cooling not restricted
Sec. 4(J)(1) and (J)(2)(a): projected water needs disclosed; no cap, reporting, or drought plan
Section 4.J(6) requires the applicant to demonstrate that adequate means of disposal for domestic wastewater and cooling or industrial wastewater discharge have been provided and approved by the Sewage Enforcement Officer, Municipal Authority, DRBC, or DEP.
Sec. 4(A)(2)(e) and (K)(4)(g)(iii): stormwater management plan required; no added standards
Sec. 4(H)(5): Tier 4 or greater generators; no annual emissions testing or reports
Sec. 4(R)(6)-(7): decommissioning plan covers e-waste, batteries, and refrigerants disposal; no recycling requirement
Sec. 4(H)(3): utility certification of capacity in application; Sec. 4(H)(4): third-party electrical inspection before occupancy
Sec. 4(L): vegetative buffer around entire perimeter; no minimum width
Sec. 4(L)(1): facility screened from view; Sec. 4(M): fences 8 ft maximum; no equipment screening height or acoustic screening
Sec. 4(A)(2)(a): siting to minimize visual impact; no visual study, renderings, or elevations required
Sec. 4(K)(4)(a): types and storage duration of materials disclosed; no storage setbacks or containment
Sec. 4(H)(4): third-party electrical inspection before occupancy; no annual fire inspections
Section 4.K(1) requires a traffic impact study by a professional traffic engineer in every case, covering construction and operation, but the study area is limited to roadways, intersections, and interchanges within one-half mile of the site rather than reaching the nearest arterial or interchange the trucks will use.
Sec. 4(K)(1)(c): construction traffic analyzed only; no work hours, haul routes, or road bond
Section 4.R(2) to (5) require notice on cessation, removal of the data center and accessory equipment within 6 months of abandonment, and security of 110 percent of decommissioning cost posted before SALDO approval, but the plan is not a recorded agreement.
Sec. 4(R)(5): estimate after first year and every fifth year; security updated every 5 years
Section 1 defines Data Center to include cryptocurrency mining, blockchain processing, and artificial intelligence, and excludes only equipment secondary and incidental to another permitted use, with no stated size or power threshold.
Sec. 4(D)(2)(c): one as-built sound study six months after occupancy, more only if the Board requires
Sections 4.H(3), 4.I(3) to (4), and 4.J(5) allow approvals or zoning permits to be revoked or rescinded for service, radiation, or water impacts, but no notice and hearing precede revocation and Sections 616.1 and 617.2 of the Municipalities Planning Code are not cited.
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the Commercial and Mixed Use (MU) districts
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data