Borough of Blakely
Anti-Data Center Policies
Blakely borough’s enacted rules require setbacks from homes and other protected places, limit backup generators or on-site power, and restrict building height, increasing costs while still allowing data centers.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Blakely BoroughThe current text is the borough zoning ordinance with amendments that Borough Council adopted on September 21, 2026, following an earlier amendment adopted on November 17, 2025, according to county records.Blakely Borough, Lackawanna County — data-center ordinance (Zoning Ordinance As Amended September 21, 2026)
What this means
The measure imposes setbacks from homes or other protected places, limits on backup generators or on-site power and building-height limits. Data centers can still be approved, but these obligations meaningfully increase construction, compliance or review costs.
Restrictions & requirementsHide restrictions & requirements25
Conditional use, § 775; no approval expiration found
50% lot coverage in the DT overlay and accessory uses limited to 35% of the tract; no footprint or megawatt cap, Schedule II and § 775.S
200 ft from water bodies, watercourses, and wetlands, with environmental impact studies; no added width on steep slopes, § 775.A and X
Section 809 limits of 60 dBA day and 50 dBA night at residential property, applied by § 775.U
70 dBC day and 65 dBC night at residential property and sound studies with dBC data, § 809 and § 775.U
Sound studies before approval; no later study, § 775.X
Letters from water providers certifying capacity; no well study, § 775.J
Applicant must document water conservation and strive to use closed-loop systems; not required, § 775.M
Letter from the sewer provider certifying capacity; no cooling discharge plan, § 775.J
Generators must have at least a Tier 4 designation; no emissions testing, § 775.G
RTO certification of available power and utility capacity letters; no electrical inspection, § 775.G and J.
Section 775.H names Blakely Borough Electric Light Company as the provider and requires the data center to reimburse the Borough for all expenses of the service, including engineering, site work, and rate calculations, but the applicant is not required to disclose the needed grid upgrades or their cost or to file an executed service agreement before a zoning permit.
Lighting plan following Dark Sky International principles, § 775.O
Building colors must blend with the surrounding area, § 775.W
6 to 12 ft perimeter fence on a berm and walls with plantings around generator groups; no acoustic screening of all equipment, § 775.G and T
Knox box, fire department access, and annual emergency training with the fire company; no written plan, § 775.I
Owner provides the fire department with required firefighting equipment at its own expense, § 775.I(d).
Number of generators and gallons of fuel on site must be shown on plans, § 775.G
Borough inspections at least four times per year, § 775.I
Traffic impact study before and after construction unless Council exempts the applicant, § 775.P
Secondary emergency access required; no road classification rule, § 775.S
Haul road map, road condition evaluation, and road bonding; no work hours, § 775.C
Post-construction traffic study and copies of DEP operating reports, § 775.D and P
Section 775.X requires environmental, health, and sound studies before any Planning Commission or Borough Council approval, prepared by a qualified professional chosen by the Borough and paid for by the developer or operator.
Pre-application meeting with the Planning Commission only; no community meeting or website, § 775.E
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the DT Data and Technology Overlay