Bedminster Township

Anti-Data Center Policies

Bedminster Township has enacted rules that can delay zoning challenges and limit data-center locations and operations, but do not prohibit all projects.

Incentives

Financial Incentive
2

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.

current law · Bedminster Township
The current rules are in Ordinance No. 268, which the Board of Supervisors adopted on September 9, 2026 and which took effect on enactment.Bedminster Township, Bucks County — data-center ordinance (No. 268)

What this means

The measure imposes setbacks from homes or other protected places, minimum site-size requirements and cooling and water-use rules. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.

Restrictions & requirementsHide restrictions & requirements38
  • Principal data centers only permitted by conditional use in the I Industrial District, not along Deep Run Road, Use I20.A.a and Art. XI; the use table marks them N in the AP, R-3, C-1, C-2, VR-1 and VR-2 districts, Art. IV

  • Conditional use before the Board, Use I20.A.a and A.j; no lapse of approval stated

  • 40 ft maximum height, Use I20.A.b; exterior mechanical equipment to be on the ground where feasible, Sec. 404-A(5)e(iii), but rooftop equipment is not counted in height or capped

  • Environmental impact statement required, Use I20.A.j.3(i), and base performance standards of Sec. 153-404 and 153-604 to 153-613 stated as applying, Sec. 404-A(5)f; no riparian buffer width stated

  • Master plan covers all lots of the site as one data center, Use I20.A.j.2; no separation between campuses

  • Lots added to or removed from the master plan only with Township approval, Use I20.A.j.2; no capacity triggers stated

  • Must meet the noise limits of Chapter 153 and the Township Code, measured per ANSI S1.13-2020 at property lines, Use I20.A.g.1 and g.2; no numeric day and night limits stated in the ordinance

  • Full spectrum modeling and octave band analysis required, Use I20.A.g.1 and g.2; no dBC or octave-band limits

  • Preliminary study with the conditional use application and as-built study 6 months after full operation by a Township-selected engineer, per ANSI S1.13-2020, Use I20.A.g.1, g.2 and g.4; testing at full operating load not stated

  • Generator testing limited to weekdays 8:00 a.m. to 6:00 p.m. and one hour per week per unit, Sec. 404-A(5)g(v)[4], applied to data centers as industrial uses (Sec. 404-A(5), Use I20 in Sec. 405.I)

  • Industrial uses must minimize vibration, Sec. 404-A(5)b; no numeric limit or study

  • Water cooling systems must be closed-loop or water-efficient, Sec. 404-A(5)g(iii)[6], and the thermal plan states air or water dissipation, Use I20.A.h.1; no water-use rate for evaporative systems

  • Drought response plan tied to state, water supplier, and local drought declarations in the water feasibility study, Sec. 404-A(5)g(iii)[4], and DRBC approval for withdrawals of 10,000 gpd or more, g(iii)[5]; no metered use reporting

  • Disposal of domestic and cooling wastewater must be shown provided and approved by the Sewage Enforcement Officer or DEP, with public authority capacity documentation or a wastewater feasibility study, Sec. 404-A(5)g(iv)[1], [3] and [4]

  • Untreated wastewater barred from stormwater systems, Sec. 404-A(5)g(iv)[2], and master plan shows stormwater facilities, Use I20.A.j.3(a); no fuel or transformer area containment or stated base stormwater standard

  • Diesel generators must meet EPA Tier 4 emission standards and backup systems must meet state and federal rules, Sec. 404-A(5)g(v)[4]; Tier 4 Final and annual emissions testing or reports not required

  • Thermal impact plan evaluating off-site thermal impacts under seasonal conditions and waste heat reuse, Use I20.A.h.2 and h.3; modeled property line temperature effects not stated

  • Decommissioning removes and disposes of batteries, fuel, and refrigerants per state and federal law, Sec. 404-A(6)a(ii) and e, for uses of 100,000 sq ft or more; no operating storage plan or disposal contract

  • EUP must document the utility application filed with fee paid, a signed transmission security agreement, and the energization date, Use I20.A.i.2(f), and the provider must certify that capacity is available and it will serve the use, Sec. 404-A(5)g(v)[2]

  • Energy Usage Plan with annual demand, LEED BD+C design, and solar on 100% of available unshaded roof area, Use I20.A.i.1, i.2 and i.5(a); peak demand by phase not required

  • Generation supplying the grid is a separate principal use, but behind-the-meter generation is an accessory use, Sec. 404-A(5)g(v)[5] and [6]; no separate approval or standards for on-site generation for normal operation

  • Substations are accessory uses that must be placed so a principal building screens them from residential districts and uses and screened from public view, Sec. 404-A(5)a(iv), c(ii) and c(iii), and on-site lines of 34.5 kV and below must be buried, g(ii)[3]

  • Battery storage must comply with NFPA 855, have a storage-specific safety plan in the ERP, and specific fire suppression, Sec. 404-A(5)h(iv); no setbacks, large-scale fire test data, or hazard mitigation analysis for data center batteries

  • Utility assessment must identify capacity shortfalls, applicant pays for needed improvements, and known rate impacts must be noted, Sec. 404-A(5)g(ii)[1] and [2] and g(v)[2]; no cost estimate, tariff terms, or executed service agreement

  • Buffer yard per Sec. 153-603 plus 8 ft berm next to residential districts or uses, Use I20.A.f.1 and f.2; 100 ft width not stated

  • Sec. 613 applies to industrial uses through Sec. 404-A(5)f: wall lighting fully shielded and parking lighting full cutoff as needed, with spill limited to 0.1 footcandle at residential property lines, Sec. 613(5)d, e and h; light crossing the property line is not barred

  • Facades facing roads or homes must use masonry, precast concrete, or metal panels and two design elements every 150 horizontal feet, including changes in material, color, height, or recesses of 5 ft, Sec. 404-A(5)c(i), plus office appearance, Use I20.A.c

  • Outdoor accessory equipment screened by the principal building from residential areas and from public view by walls, fencing, or evergreens, Sec. 404-A(5)c(ii) and c(iii), and e(iii); no height or sound wall standard

  • Elevations and renderings of visible facades required, Use I20.A.c; no visual impact study

  • Emergency Response Plan approved by the fire department and the Township Emergency Management Coordinator, recertified annually with an annual site inspection by Township and fire officials, and 24-hour contact signage at each access point, Sec. 404-A(5)h(ii), (iii), (v) and (vii)

  • ERP must include procedures and schedules for drills and for training local first responders, Sec. 404-A(5)h(ii)[11]; annual applicant-delivered training and specialized equipment at no cost not required for data centers

  • ERP covers hazardous material incidents and accessible safety data sheets, with hazardous materials signage, Sec. 404-A(5)h(i)[8] and h(ii)[8]; no storage setbacks or containment standard

  • ERP provides for annual fire safety inspections by a qualified professional, Sec. 404-A(5)h(ii)[12], and an annual Township and fire official site inspection, h(v); no report to the fire official or correction deadline

  • Trip generation estimate only, Use I20.A.j.3(g); no traffic study

  • Decommissioning plan with 110% financial security for uses of 100,000 sq ft or more, removal of all buildings and equipment beginning within 12 months after 12 months of nonoperation and finishing within 18 months, Sec. 404-A(6)a, b, d and e; no recorded agreement and removal timelines exceed 6 months and 2 years

  • Cost re-estimated by an independent engineer every 10 years with security adjusted within 90 days, Sec. 404-A(6)c

  • Permits and certificates suspended if the sound security is not maintained, and shutdown of the noncompliant portion after written notice and a 30-day cure period, Use I20.A.g.3 and g.6; no hearing and no citation of MPC Sections 616.1 and 617.2

  • As-built sound assessment by a Township-selected acoustic engineer at the applicant's expense, Use I20.A.g.4; consultant review of studies in land development review not assigned

Benefits & exceptionsHide benefits & exceptions1
  • Approval pathway: Conditional use in the I Industrial District

Sources

current law · Bedminster Township
The Board of Supervisors adopted Resolution Nos. 2026-09 and 2026-10, invoking the municipal curative amendment process for data centers and battery storage systems.Bedminster Township, Bucks County — data-center resolution unnumbered resolution 2026-04-08

What this means

The measure starts a protected period for local officials to fix gaps in their zoning rules. This can delay developers who need to challenge the old rules, but it does not by itself prohibit every data-center project.

Sources