Borough of Archbald
Anti-Data Center Policies
Archbald’s enacted ordinance restricts data centers to limited locations, with minimum site sizes and setbacks from homes and other protected places, narrowing feasible projects while retaining an approval route.
Incentives
Financial Incentive
Financial incentives not assessed from full ordinance text in this tracker import; an empty list is not a confirmed finding that no incentive exists.
current law · Archbald BoroughThe current rules are in Ordinance 04-2025, which Borough Council adopted by a 4 to 2 vote with one abstention on November 24, 2025, and a rough draft amendment the borough posted on September 15, 2026 would limit data centers to the I-2 Industrial District.Archbald Borough, Lackawanna County — data-center ordinance (No. 04-2025)
What this means
The measure imposes setbacks from homes or other protected places, minimum site-size requirements and limited eligible locations. Data centers still have an approval route, but the siting or operating limits significantly narrow feasible projects.
Restrictions & requirementsHide restrictions & requirements17
Conditional use before Council, approvals lapse after 18 months, Section 550-1417.
The note cites Section 550-1417B of the base zoning ordinance for expansion beyond the approval, but that section is not in the amending ordinance text that was read, and the amendment itself lists no expansion triggers or like-for-like exemption.
55 dBA day, 45 dBA night at residential lot line, Sections 1005 and 602.A(62)2
Section 602.A(62)2.c and d cap project sound at 5 dBA above the pre-construction ambient level from a long-term survey under ANSI S12.9-1992 Part 2, but the ambient is not defined as L90 and no floor is stated below which the cap does not apply.
Study with zoning permit application and as-built study, Section 602.A(62)1
Generator testing only 7 a.m. to 8 p.m., no hours cap, Section 602.A(62)2.b
Water feasibility study if non-public water, Section 602.A(62)4
Projected water needs disclosed if non-public water, Section 602.A(62)4
Water recycling and release plans, public sewer required, Section 602.A(62)4
Generators must meet state and federal rules, Section 303.5
Full-time generators a conditional use with fuel limits, Section 303.5
50 ft buffer at all property lines, Section 507.8
Rooftop equipment screened, berms where equipment visible, Sections 507.7 and 507.9
Emergency management plan for tall buildings, security plan, Sections 502.D and 602.A(62)7
One as-built sound study after opening, Section 602.A(62)1.b
Section 602.A(62)1.d allows permit revocation for failure to remediate noise violations in addition to other zoning remedies, but states no notice or hearing before revocation.
Borough acoustical expert approves studies, review cost not clearly assigned, Section 602.A(62)1
Benefits & exceptionsHide benefits & exceptions1
Approval pathway: Conditional use in the Data Center Overlay (DC) District
Sources
Thank you to the Pennsylvania Data Center Ordinance Tracker for providing proposed local ordinance data for PA. Citation: padatacenterordinances.org, accessed November 3, 2026.Cookie preferences · Report missing data