City of Wooster

Neutral Data Center Policies

Wooster allows data centers in I-1 and I-2 industrial districts, but they must undergo plan review and meet general standards.

current law · City of Wooster
Restricts data centers to I-1 and I-2 industrial districts, where they need zoning approval, and prohibits them elsewhere.City of Wooster Planning and Zoning Code, Chapter 1109 (Permitted Principal Uses)

What this means

The measure allows data centers in the I-1 and I-2 industrial districts, giving them a path to be built. They still need plan review and must meet general standards, so the benefit is modest.

People behind it

  • Maintains and enforces the City’s Planning and Zoning Code.

  • May initiate code text and zoning map amendments and adopt or amend the code.

  • May initiate code text and zoning map amendments and makes recommendations on proposed amendments.

Show 2 more peopleShow fewer people
  • Administers and enforces the code, including reviewing applications, making administrative decisions, and issuing notices of violation.

  • Aids in administering and enforcing the code and reviews engineering plans and public improvements.

Restrictions & requirementsHide restrictions & requirements13
  • Data centers are permitted in I-1 and I-2 districts but prohibited in the other listed districts; a project outside I-1 or I-2 cannot proceed as proposed without a zoning change. Data Center

  • New construction, structural alterations, and site improvements in I-1 and I-2 require Planning Commission review of preliminary and final development plans, unless the Zoning Administrator determines that only a final plan is warranted. A zoning certificate is required before development or use, and a certificate of zoning compliance is required before occupancy. Development plan review

  • Development-review applications require fees set by City Council and generally are not processed or considered complete until the fee is paid. Fees are nonrefundable except for specified overpayments or applications accepted in error. Application fees

  • Industrial-district site standards require minimum lot areas of 1 acre in I-1 and 2 acres in I-2, and minimum lot widths of 125 feet in I-1 and 200 feet in I-2. Building coverage is limited to 40% in I-1 and 50% in I-2; maximum building heights are 45 feet and 60 feet, respectively. Industrial zoning standards

  • Industrial buildings must meet district setbacks, including a 40-foot front setback. Where an industrial site adjoins a residential district, minimum side and rear building setbacks are 50 feet in I-1 and 75 feet in I-2; parking areas must also meet setbacks, including a 50-foot setback next to residential districts in both zones. Required setbacks

  • A traffic impact study is required for a development-plan or major-subdivision application if the project generates or could generate at least 100 vehicle trip ends during the highest peak hour, or has access at a location identified as a safety or accident problem. Mitigation recommendations must be incorporated when deemed necessary by the Planning Commission or City Engineer. Traffic impact study threshold

  • Industrial uses must provide off-street parking based on their functions; for example, office or administrative space requires one space per 300 square feet, and warehousing requires one space per employee on the largest shift. Industrial parking requirements

  • All uses must meet performance standards covering noise, heat, vibration, odors, fumes, dust, and waste. Noise received at residential or institutional uses is limited to 60 dBA by day and 50 dBA at night. Noise limits

  • Utility lines generally must be placed underground, except high-voltage power lines that cannot feasibly be placed underground. Underground utility lines

  • Developments required to file a development plan must include a lighting plan. Lighting must avoid shining onto adjacent residential property or causing street glare; at the lot line, illumination is limited to 0.5 footcandles where a nonresidential use abuts a residential district or existing residential use. Exterior lighting standards

  • Landscaping and screening requirements may apply to parking areas and sites next to residential districts. Industrial uses adjoining residential districts must provide a buffer whose width is based on the applicable parking setback or 10 feet, whichever is greater. Required buffers

  • If required public improvements are unfinished before development-plan approval or final-plat certification, the developer must provide a financial guarantee based on their estimated total cost. A separate guarantee equal to 50% is required for the two-year maintenance period after streets, utilities, and public improvements are accepted. Financial guarantees

  • After development-plan approval, the applicant generally must obtain a zoning certificate within one year. Work authorized by the certificate must be completed and a certificate of zoning compliance issued within two years; extensions are limited and require approval. Development approval time limits

Benefits & exceptionsHide benefits & exceptions1
  • Data centers are permitted uses in the I-1 Office/Limited Industrial and I-2 General Industrial districts, rather than conditional uses. They remain subject to applicable code standards and development-plan review; the I-3 district does not list data centers as permitted.