Westerville may sell data-center space and services, negotiating prices within 5% of published rates. The ordinance mainly governs the city’s own data center, requiring written contracts and allowing possible fees; it does not provide building incentives.
current law · City of WestervilleSets rules for Westerville’s city-owned data center, including customer rates, electricity surcharges, connection fees, contracts, and billing.Westerville Codified Ordinances § 947.05, The Data Center Division
What this means
It would let the city sell data-center space and services and negotiate rates within 5% of its published rates (sell products and services, not vary by more than 5%). But it mainly sets rules for the city’s data center, including written contracts and possible fees, rather than offering incentives or making it easier to build new centers (written contract).
People behind it
- Director
Authorized to administer the Data Center Division, including negotiating rates and managing service contracts, surcharges, and customer service.
- Director of Finance
Responsible for invoicing and collecting Data Center customer payments, and may impose or waive late fees and interest.
- Council
Determines the Data Center Division’s rates.
Restrictions & requirementsHide restrictions & requirements10
Council sets Data Center rates. The Director may negotiate different rates, but each negotiated product or service rate may vary by no more than 5% from the published schedule. Negotiated rates are limited to 5%.
Data Center customers may be charged an electric-usage surcharge based on consumption; service may be refused, discontinued, or terminated if an invoiced surcharge is not paid. Electric usage surcharges.
A customer may be charged the City’s cost, if any, to make or provide its physical connection to the Fiber Network, although the Director may waive the fee. Physical Connection Fee.
Applicable federal, state, and local taxes or fees must be charged and collected for products and services provided to Data Center customers. Applicable taxes or fees.
The Director may require deposits for installation or use of WeConnect equipment. Deposits are returned at contract termination only if the returned equipment is in good, operable condition, subject to normal wear and tear, or if the applicable contract term has been completed. Deposits.
Data Center sales, leases, licenses, and other transactions must be covered by a written contract; service may be refused, discontinued, or terminated if the customer does not sign a contract or written renewal. Written Contracts.
A Data Center contract must last at least one month and no more than 20 years, unless Council specifically authorizes a longer term. Minimum and maximum term.
Renewals are subject to the rates and charges in effect at renewal, unless the existing contract or the chapter provides otherwise. Rates and charges in effect at renewal.
The Director of Finance may impose a late fee of up to 10% of the invoiced amount, plus 1.5% monthly interest on an unpaid balance; either charge may be waived. Late fee and interest.
WeConnect-provided equipment remains City property and must be returned when service ends or when requested. The Director may seek replacement-value restitution for damaged equipment and terminate related services; customers may not repair the equipment without the Director’s prior written consent. Equipment ownership and damage.
Benefits & exceptionsHide benefits & exceptions6
The Director may negotiate Data Center rates based on factors such as contract size, City costs, and competitive pricing, but each negotiated rate must remain within 5% of the Council-approved rate schedule (“shall not vary by more than 5%”).
The Director may waive an electric-usage surcharge, based on factors including contract size, City costs, and competitive pricing, but may later reinstate it (“may waive, or after having waived may reimpose”).
The Director may waive the fee for WeConnect to provide the physical connection between a customer and the Fiber Network; otherwise, the fee is for the City’s cost, if any (“may waive the Physical Connection Fee”).
The Director and Finance Director may adjust or credit a customer’s invoice or account when warranted by outages, equipment problems, or related system failures (“adjust or credit any Data Center customer’s invoice”).
Data Center contracts may run from one month to twenty years; Council may specifically authorize a longer maximum term, and the Director sets each contract’s term within the applicable limits (“maximum term … shall be twenty years”).
The Director may establish Data Center contract terms and conditions, so long as they do not conflict with the chapter; these may cover matters such as service connections, billing, and disconnection or resumption of service (“authorized to promulgate contract terms and conditions”).