City of Trenton
Pro-Data Center Policies
Trenton allows data centers in its I-G district and multiple principal buildings on one lot, easing development and expansion. Projects must still meet existing industrial requirements, including lot size, setbacks, and noise limits.
current law · City of TrentonAllows data centers in Trenton’s general industrial district and permits multiple main buildings on a single data-center lot.Trenton Zoning Code amendments allowing data centers (2025)
What this means
The proposal would make data centers a permitted use in the I-G district and allow multiple principal buildings on one lot, making development and expansion easier (data centers; multiple principal buildings). Projects would still have to meet existing industrial rules, including lot-size, setback, noise, and other requirements, so the measure is a substantial but not unrestricted benefit.
People behind it
- Matthew Garver
Applicant who submitted the data-center zoning text amendment request on behalf of Prologis (applicant and request).
- Prologis
Identified as the applicant organization for the proposed zoning amendments (applicant and request).
- Andrew J. Schweier
Planning and Zoning Administrator who prepared and presented the staff report on the proposed amendments (report author).
Show 1 more peopleShow fewer people
- City Administration
The draft ordinances state that City Administration sought to amend the zoning code (desire of City Administration).
Restrictions & requirementsHide restrictions & requirements10
The measure expressly adds data centers as a permitted use in the I-G General Industrial District, so the measure’s authorization is tied to that district and its requirements: “Data centers”.
I-G buildings are limited to 65 feet; buildings over 65 feet and no higher than 85 feet require a conditional use permit from the Planning Commission: “exceed 65 feet in height, but not more than 85 feet”.
For that conditional use permit, applicants must provide a location map, civil site plan, landscaping plan, lighting plan, and building elevations, and demonstrate no significant negative impact on the vicinity or nearby property values; the Commission may require an independent noise study: “an independent noise study may be required”.
I-G sites must meet minimum dimensional requirements: 5 acres, 100 feet of frontage, a 100-foot front yard, 25-foot side and rear yards, and 50 feet in combined side yards. The marked side and rear setbacks increase to 100 feet where the site abuts residential zoning: “5 acres”.
Buildings in I-G may cover no more than 60% of the lot: “60% of lot area”.
Where an I-G property line abuts a residential district, an approved visual barrier at least 8 feet high is required: “a minimum of eight feet in height”.
Operations must comply with the city’s noise rules; may not emit prohibited toxic or noxious matter; must meet county air-pollution and odor standards; may not create detectable vibrations at or beyond lot lines; and must enclose intense glare or heat and screen exposed light. Exterior lighting must also be shaded to avoid direct light on residential property or public streets: “No noise from any operation”.
Flammable or explosive materials must have appropriate safety and fire-suppression measures and comply with applicable Ohio Fire Marshal rules; radioactive-material handling, discharges, and waste disposal must comply with applicable federal and state regulations: “adequate safety and protective devices”.
Outdoor storage piles or bins may not exceed 20 feet high and must be at least 200 feet from property zoned residential: “not located closer than 200 feet”.
I-G buildings and structures may not be used for residential purposes, except that a watchman or custodian may reside on site: “a watchman or custodian may reside”.
Benefits & exceptionsHide benefits & exceptions4
The zoning code defines “data center” to cover facilities serving other companies as well as a single user and its authorized affiliates and partners, helping establish which facilities qualify under the zoning rules. The definition covers both service providers and single users
Data centers are listed as a principal permitted use in the I-G General Industrial District, subject to that district’s requirements. Data centers are a principal permitted use
The usual one-principal-building-per-lot rule does not apply to an I-G lot whose principal use is a data center, allowing multiple principal buildings on that lot without the planned-development approval otherwise required. The exception applies to I-G data center lots
I-G buildings containing principal permitted uses, including data centers, may seek conditional-use approval for heights over 65 feet and up to 85 feet. Approval requires Planning Commission findings and specified application materials, including site, landscaping, lighting, and elevation plans; the Commission may require an independent noise study. Conditional approval is available for buildings up to 85 feet
Sources
pending · City of TrentonWould prohibit construction in Trenton of data centers with an aggregate monthly demand or peak load above 25 megawatts; the proposal must still go to a special election.Trenton Proposed Charter Amendment Article IX, Section 9.06 (Issue 17) (2026)
What this means
If enacted, the measure would prohibit construction of data centers meeting its definition, including facilities with demand above 25 megawatts, making new builds and likely related expansions impossible (“construction of a data center is hereby prohibited”). It does not expressly ban operating existing centers, but the construction ban is an outright bar on creating covered centers.
People behind it
- Barry Blankenship
Named proponent who filed the petition proposing the charter amendment.
- Lorie Blankenship
Named proponent who filed the petition proposing the charter amendment.
- Steven Wallace
Named proponent who filed the petition proposing the charter amendment.
Show 7 more peopleShow fewer people
- Lesa DeRosier
Named proponent who filed the petition proposing the charter amendment.
- Amy Humbert
Named proponent who filed the petition proposing the charter amendment.
- Trenton City Council
Passed ordinances concerning the petition and submission of the proposed amendment to voters.
- Stanislav Beresford
Clerk of Council; received the petition and was directed to certify materials and preserve the petition.
- Butler County Board of Elections
Examined the petition signatures and was to receive the certified amendment for election submission.
- Frank Cloud
Board of Elections chair named on the election notice issued by order of the Board.
- Nicole Unzicker
Board of Elections director named on the election notice issued by order of the Board.
Restrictions & requirementsHide restrictions & requirements1
The proposed charter amendment would prohibit construction of a data center in Trenton. “Construction” includes erecting buildings, infrastructure, or facilities, as well as related preparations and modifications for a common purpose. The ban applies to facilities on one parcel or on contiguous, adjacent, or otherwise aggregated parcels that are used primarily or exclusively for digital information services and have aggregate monthly demand or peak load greater than 25 megawatts, regardless of energy source.