City of Sidney
Neutral Data Center Policies
Sidney permits data centers in the IIM zone without conditional-use approval, but projects must meet general rules, including a one-acre minimum lot and site-plan review for new construction.
current law · City of SidneyAllows data centers over 50,000 square feet as a warehouse use in the Industry/Innovation/Manufacturing zone, subject to the city’s zoning and site-plan requirements.Sidney Zoning Ordinance
What this means
Data centers are listed as a permitted use in the IIM zone, so the code does not ban them or require conditional-use approval for data centers. But projects must meet general requirements, including a one-acre minimum lot size and site-plan review for new construction in the IIM zone, creating some added cost and work.
People behind it
- City Council
Adopts the Zoning Code and zoning amendments.
- Administrator
Chief administrator of the Zoning Code, responsible for its interpretations and decisions, and for enforcement.
- City Planner
Reviews and approves site plans, signs, fences, and Use Compliance Certificates, and participates in Zoning Code enforcement.
Show 1 more peopleShow fewer people
- Planning & Zoning Department
Administers and enforces the Zoning Code and conducts land-use and zoning plan reviews.
Restrictions & requirementsHide restrictions & requirements8
Data centers are listed as a permitted use in the IIM zone; the use table treats blank cells as prohibited, so the use is not allowed in other zones. The code defines a data-center warehouse as a facility over 50,000 square feet. Warehouse – Data Center and blank cells represent prohibited uses
In the IIM zone, the lot must be at least one acre. Minimum setbacks are 20 feet in front, 20 feet on each side (40 feet aggregate), and 40 feet in the rear; the maximum building height is based on distance from the centerline of the adjacent street. IIM development standards
Site plan approval is required for new construction or additions of permitted or conditional uses, except single- and two-family dwellings; work may not start and permits may not be issued before approval. The plan must include applicable information such as utilities, grading and drainage, landscaping, lighting, and vehicle circulation. Construction must start within six months and be completed within two years of approval, or the review becomes invalid. site plan approval requirement and site plan time limit
Zoning compliance is required before a building is occupied or used, or construction or other listed work begins. The Administrator reviews the application and issues a zoning certificate if the proposal complies. zoning compliance is required
For new construction, landscaping rules require front-yard trees at a rate of at least one per 40 feet of frontage, and buffers are determined by the adjacent zone or district. For IIM sites, the buffer table calls for a large buffer beside residential zones or TND and a medium buffer beside HC, CC, or NC. Parking areas in IIM also require landscaped islands and perimeter landscaping. front-yard tree requirement and buffer table
IIM development site plans must include a photometric plan. Lighting is limited at property lines to 0.5 foot-candles beside residential districts and 2.0 foot-candles beside non-residential districts; fixtures in parking and vehicular areas must be full cutoff. photometric plan requirement and property-line light limits
Unless an exception applies, industrial, manufacturing, and warehouse uses must provide one off-street parking space per 2,500 square feet of gross floor area. No specific parking count is required for property with adjacent on-street parking or within 1,000 feet of a public parking facility. warehouse parking ratio and parking exception
If a facility includes outdoor storage, it must be in the rear yard, at least 10 feet from the primary building’s rear wall and five feet from each lot line, paved with concrete or asphalt, and screened from adjacent uses by four-foot shrubs or a six-foot privacy fence. outdoor storage standards
Benefits & exceptionsHide benefits & exceptions4
The use table lists Warehouse–Data Center as a permitted principal use in the IIM zone; the glossary defines this use as a data facility larger than 50,000 square feet (“Warehouse – Data Center”).
Buildings in the IIM zone are exempt from the code’s building design standards, reducing design requirements for data center buildings located there (“not subject to the building design standards”).
For projects requiring site plan review, the Administrator must conduct the review within 10 working days and provide comments or conditions within five working days after review. This sets a review timetable but does not guarantee approval (“within ten working days”).
A lawful existing nonconforming data center use may continue despite later zoning changes. Expansion is limited: the Administrator may approve an extension of up to 20% of the building’s gross floor area, and the Board may consider a qualifying extension if the Administrator does not approve it (“may be continued”).