City of Rocky River
Anti-Data Center Policies
Rocky River does not specifically allow data centers in this district, so they need approval as a similar use or a code change. Projects also require development-plan approval and must meet lot-size and building-coverage limits.
current law · City of Rocky RiverProhibits data centers in the service manufacturing district unless the city approves them as substantially similar to a listed use or amends the zoning code.Rocky River Ohio Codified Ordinances, Chapter 1171, Service Manufacturing District Regulations
What this means
Data centers are not expressly listed as permitted uses in this district, and an unlisted use is prohibited unless approved as substantially similar or the code is amended (unlisted uses). All projects also require development-plan approval and must meet limits such as a one-acre minimum lot and 35% maximum building coverage (lot requirements). These create meaningful approval and site-planning hurdles, but the possibility of approval as a similar use keeps this from being a ban.
People behind it
- Planning Commission
Determines whether conditional-use requirements are met for conditional uses in the Service Manufacturing District.
Restrictions & requirementsHide restrictions & requirements9
A data center is not expressly listed among the Service Manufacturing District’s permitted or conditional uses. An unlisted use is prohibited unless the code or zoning map is amended, or the use is found substantially similar to a listed use. Unlisted uses are prohibited.
All uses in the Service Manufacturing District require development-plan review and approval before they may proceed. Plans must be reviewed and approved.
In the Service Manufacturing District, lots must be at least one acre, and buildings may cover no more than 35% of the lot. Minimum lot area and maximum coverage.
Building setbacks in the Service Manufacturing District are generally 75 feet from a street right-of-way, 15 feet from side or rear lot lines adjoining nonresidential districts, and 35 feet from side or rear lot lines adjoining residential districts. The street setback is 35 feet for a street serving a particular development rather than through traffic, unless the setback map provides otherwise. Setback requirements and exception.
Principal buildings and structures in the Service Manufacturing District may not exceed 35 feet in height; accessory buildings and structures may not exceed 15 feet. Maximum height limits.
Parking in the Service Manufacturing District must be set back at least 10 feet from the street right-of-way and adjoining nonresidential lot lines, and 15 feet from adjoining residential lot lines; setback areas must be landscaped. Parking setbacks and landscaping.
Loading and service areas must generally be in the rear yard. The Planning Commission may allow a side-yard location if it finds that this would lessen the impact on adjacent uses; the areas must also meet parking setbacks and screening requirements. Loading-area location rule.
Except for off-street parking and loading, activities associated with a permitted use must occur entirely inside enclosed buildings, and noise, smoke, glare, vibration, or odor may not be detected outside those buildings. Enclosure and external-effects requirement.
Solid waste must be disposed of, stored in a building, or completely enclosed in containers. Buildings, containers, or dumpsters must be in a side or rear yard, meet parking setbacks, and be screened. Waste storage and screening rules.