City of Piqua
Pro-Data Center Policies
Piqua provides substantial tax incentives, water and sewer service, and protections from later city rule changes, while requiring the developer to cover infrastructure costs and offering construction power only.
current law · City of PiquaLocks in Piqua’s existing zoning and development rules for the project and sets city commitments for approvals, infrastructure, utility services, and tax incentives for the planned data center.Piqua Development Agreement with J5, LLC (2026)
What this means
The measure offers major incentives, including a 100%, 15-year tax exemption and reserved water and wastewater capacity for the project. It also limits future city rule changes affecting the project, while requiring the company to fund specified infrastructure costs; overall, the incentives and protections strongly favor building and operating data centers.
People behind it
- J5 LLC (d/b/a Shaytura LLC)
Project proponent: the company secured an interest in the site and began planning the data center. “commenced with plans to develop”
- City of Piqua
Municipal party to the project agreements and responsible for the related TIF infrastructure fund and annual reporting. “establishes a municipal public improvement tax increment equivalent fund”
- Chris Schmiesing
Economic Development Director who submitted Ordinance O-18-25 and Resolution R-114-25, the data-center project legislation and agreements authorization. “SUBMITTED BY Chris Schmiesing”
Show 2 more peopleShow fewer people
- Bricker Graydon LLP
The City’s legal counsel, which assisted with negotiating and drafting the project’s Water and Wastewater, Development, and TIF agreements. “drafting and negotiating”
- L. Paul Oberdorfer
Named as the City Manager and the City’s signatory to the Development Agreement; the resolution authorized the City Manager to execute the project agreements. “L. Paul Oberdorfer, City Manager”
Restrictions & requirementsHide restrictions & requirements9
For applicable changes of use, building modifications, or new site construction, the Development Director may require a Transportation Management Plan. Parking must cover 100% of estimated typical-day demand, subject to the code’s rules on on-site parking, oversizing, and accessible spaces. 100% of the estimated parking demand
Text or zoning-map amendments require a City Commission public hearing after Planning Commission review and recommendation; the Commission must consider that recommendation before acting. will conduct a public hearing
Wastewater discharges must comply with the agreement’s effluent-quality limits and the City Code’s discharge prohibitions, and must be measured by customer-installed, maintained meters. Pretreatment may become necessary if operations or applicable laws change. separate totalizing meter
The City reserves water and wastewater capacity by project tier, and additional tiers require notice and may require further system improvements. During shortages, essential public-health and safety uses take priority; industrial water conservation may be required, up to the percentage reduction imposed on indoor residential use. in cases of water shortages
The company must fund water and wastewater infrastructure through escrow, including a $6,871,496 deposit for soft costs and deposits tied to construction bids before the City awards work. deposit $6,871,496.00
The company must fund road reconstruction improvements through escrow, starting with a $675,728 design-cost deposit and later deposits for bid-award amounts, subject to the agreement’s cost limits and change-order rules. Initial Deposit
A PILOT is due for each qualifying data-center building: generally $735,000 per building annually, with a $1,470,000 minimum in years 6–20, annual CPI adjustments capped at 3%, and an additional $1.80 per square foot above 350,000 square feet. seven hundred and thirty-five thousand dollars
The agreement requires a one-time $200,000 payment to the City. single, one-time fee
The project must pay applicable water and wastewater rates for water actually used and wastewater actually discharged; rates may be adjusted by the City Commission after a public hearing. Rates are subject to periodic adjustment
Benefits & exceptionsHide benefits & exceptions13
The project may receive a 100% real-property-tax exemption for up to 15 years on qualifying new buildings, subject to the agreement’s PILOT payments and other conditions. 100%, 15-year tax abatement
The TIF exempts 100% of the post-ordinance increase in assessed value for up to 30 years per parcel. The TIF is subordinate to qualifying CRA exemptions, and owners must make service payments in lieu of taxes. one hundred percent (100%) of the increase
The TIF agreement allows up to 50% of service payments to reimburse the company for eligible public-infrastructure costs; reimbursement requires cost documentation and is subject to the agreement’s limits and procedures. up to fifty percent (50%) to reimburse the Company
The City is to arrange construction of specified water, wastewater, and roadway improvements. The company funds these improvements through escrow and is responsible for eligible costs, subject to the agreements’ cost limits and approval procedures. deposit funds into the Escrow Account
The water and wastewater agreement reserves capacity for the project’s specified tiers and commits the City to making service available during construction and operation. Capacity and service are subject to the agreement’s terms, including protections for public health and safety during shortages. reserve and hold for the Customer
Water and wastewater charges are limited to the lowest applicable City rates and measured usage or discharge; the agreement also bars project-specific charges and fees beyond those disclosed in its fee exhibit, subject to that exhibit and the agreement’s terms. no higher than the lowest applicable
The City agrees to expedite project approvals and identifies the listed approvals as the City approvals required to commence and complete development. It also agrees to assist with approvals from other agencies; completion of water, wastewater, or road improvements is not a condition for building permits or certificates of occupancy. expedite processing of all Project Approvals
The agreement generally prevents later City rules from applying to the project or property unless the company elects to accept them; state or federal legal requirements and specified public-health-and-safety measures are exceptions. shall be applied to the Project or the Property
City staff agree not to recommend or support new taxes applicable solely to the project or property without the company’s written consent. without the written consent of the Company
The development agreement provides for the company to receive operational electric service directly through AES and for the City to work with the company on temporary construction power from Piqua Power System. directly through AES
The company may develop the project in phases and decides whether and when to proceed with later phases; later phases require the notices specified in the agreements. within the sole and absolute discretion of the Company
The water agreement permits the company to establish backup water sources, including wells or rainwater collection, subject to applicable laws. drilling wells on the Property
The development agreement provides for IH Heavy Industrial zoning, which it states permits data-center operations, and protects the project from certain residential rezoning on adjoining property unless a 100-foot setback is included. IH Heavy Industrial zoning designation
Sources
current law · City of PiquaAuthorizes Piqua to provide up to 10 megawatts of construction power and build related infrastructure for a planned data center, with the company covering the costs.Piqua Resolution R-80-26 (2026) — J5 construction-power agreement
What this means
The agreement supports development by providing electricity to the site, including up to 10 MW for construction. The company must pay for the power and related infrastructure, and the construction supply does not guarantee long-term operating power, so the benefit is modest.
People behind it
- Rick Byron
Interim City Manager authorized to execute the Electric Services Agreement on the City's behalf.
- Commissioner DeBrosse
Offered the motion to adopt Resolution R-80-26.
- Commissioner Walker
Seconded the motion to adopt Resolution R-80-26.
Restrictions & requirementsHide restrictions & requirements10
Construction power is capped at 10,000 kW (10 MW). Any increase requires an advance written request and City approval, which may be denied; if approved, the customer pays the additional costs. The 10,000 kW limit
The customer must fund the City’s construction work through escrow. Exhibit B estimates total costs at $5,132,888; the stated amount is due within 30 days after the account is established, and the customer must pay documented costs above the estimate. Estimated total costs
The customer must pay applicable tariffs and monthly charges, including real-time hourly locational marginal energy pricing, ancillary charges, costs and fees incurred to serve its load, and a minimum monthly billing demand. Bills are due within 10 days. Costs passed through to the customer
At least 90 days before power delivery, the customer must provide a deposit estimated at three months of electric bills. The City may require replenishment, due within 30 days of its request. Three-month deposit
The customer must provide security for estimated post-term generation-capacity and transmission-capacity charges, generally through an acceptable standby letter of credit. The City may consider a parental guaranty, and the customer may use cash for some or all of the requirement. Post-term collateral requirement
The customer must pay for a transformer capable of receiving service at 69 kV and install, own, and maintain facilities on its side of the interconnection. When construction power ends, it must transfer the transformer to the City for $1; if the transformer is moved, the customer pays disconnection and decommissioning costs. Transformer responsibilities
Electrical operation must meet power-factor and power-quality requirements, including IEEE 519 harmonic limits, and avoid harmful voltage fluctuations and disturbances. If the City requires corrective measures, the customer must install them at its own expense. Power-quality requirements
Onsite generation electrically connected to the City’s system requires the City’s written consent and an interconnection agreement. Before operating any onsite generation, including backup generation, the customer must comply with applicable City zoning rules, including rules on noise, appearance, and emissions. Onsite generation requirements
The customer may not resell or redistribute electricity. Third parties may use construction power to build the customer’s facilities, but the customer remains liable for their use. Prohibition on resale
If the customer terminates the agreement, it remains responsible for power purchases made at its written request and for post-termination capacity and transmission costs tied to its load; costs already incurred for the City’s work are not refundable. Post-termination costs
Benefits & exceptionsHide benefits & exceptions4
The City agrees to provide up to 10 MW of construction and commissioning power. The service term may last up to 10 years from when the Customer begins taking power, subject to the Agreement’s termination terms.
The Customer may request power above 10 MW for expansion. The City may approve or deny the request, and the Customer is responsible for added costs if the increase is approved.
The City agrees to perform electric-system upgrades for construction service, including transmission, breaker, relay, and fiber work. The listed costs total $5,132,888, but the Customer must fund the escrow account, pay approved disbursements, and cover documented cost overruns.
The Customer may assign the Agreement to an affiliate without the City’s prior consent, provided the affiliate supplies any required security and agrees in writing to assume the obligations.
Sources
current law · City of Piqua, specifically the designated data-center project areaAuthorizes a 30-year property-tax exemption for new value created by the planned data center project, with payments in lieu of taxes funding public infrastructure that serves the site.Piqua Ordinance O-18-25 (2025)
What this means
The adopted ordinance offers a 30-year exemption on increases in property value and can use TIF payments to reimburse the developer for infrastructure costs (“one hundred percent (100%)” exemption). Related agreements also promise water and sewer service and limit the project’s exposure to later local rule changes (“no addition to, or modification of”). The developer must pay infrastructure costs and annual payments in lieu of taxes, but the incentives and protections are substantial overall.
People behind it
- Chris Schmiesing
The ordinance report lists him as its submitter; he is identified as Director of Economic Development. Submitted by
- J5, LLC
Identified as the developer pursuing the project and a party to the TIF Agreement; the ordinance establishes the TIF exemption and infrastructure-funding mechanism for the project. pursuing the development
- City of Piqua
The ordinance establishes a City-held TIF fund and authorizes the City to use its service-payment proceeds for specified purposes. establishes a municipal public improvement tax increment equivalent fund
Show 1 more peopleShow fewer people
- City Manager
Authorized by the ordinance to execute the TIF Agreement and school compensation agreement and take related implementation actions. authorized and directed
Restrictions & requirementsHide restrictions & requirements11
For each qualifying data-center building of at least 100,000 square feet, the company must pay an annual PILOT: $735,000 per building in years 1–5; in years 6–20, the greater of $735,000 per qualifying building or $1.47 million; and $735,000 per qualifying building from year 21 onward. Amounts may increase annually by CPI, capped at 3%, and buildings over 350,000 square feet incur an additional $1.80 per excess square foot. PILOT amounts and adjustments
The company must pay a one-time $200,000 fee to the City within 60 days after the Development Agreement’s effective date. one-time fee
Owners must make TIF service payments on exempted improvements in the amount of the property taxes that otherwise would have been due, generally for up to 30 years per parcel. The TIF exemption is subordinate to applicable CRA tax exemptions, and no TIF service payments are due on improvements while they are covered by specified tax exemptions. annual service payments in lieu of taxes
The company must fund the water and wastewater infrastructure work through escrow: the agreement requires an initial $6,871,496 for soft costs and deposits for each scope based on the actual bid award. The listed estimate is $44,499,953 in construction costs plus $6,871,496 in soft costs; final actual costs may require an additional payment. deposit $6,871,496
For road reconstruction, the company must deposit $675,728 for estimated design costs and, before the City awards construction contracts, deposit the applicable contract price for the work. It is also responsible for eligible costs within the agreement’s cost limits, subject to stated exclusions and any road-grant funds. Initial Deposit
For project phases after Tier I, the company must give written notice to proceed; the water and wastewater agreement calls for 210 days’ advance notice for a tier, although failure to give that notice does not itself bar use of the tier. Additional tiers require at least 180 days’ notice, and the company may have to pay for system improvements needed to serve them. 210 days’ advance written notice
Water and wastewater service is subject to the agreement’s capacity allocations and quality requirements. During a declared shortage, the City may prioritize public health and safety and specified facilities; the agreement also permits reductions in the project’s water use under the stated shortage conditions. water shortage
Wastewater discharges must comply with the City’s discharge prohibitions and the agreement’s effluent limits. The company must install and maintain a City-approved discharge meter, and may not discharge wastewater until the meter is installed and operating within manufacturer specifications. No wastewater discharge shall be allowed
Where prevailing-wage rules apply to publicly owned infrastructure work, the City and company must comply with Ohio’s prevailing-wage requirements, including applicable wage determinations and contractor and subcontractor compliance. prevailing wage requirements
The company must pay real-property taxes not exempted by the project incentives and file required tax reports and returns. If it does not cure a failure within 90 days after written notice, the project incentives are rescinded beginning with the affected year and thereafter. within ninety (90) days
The company and successive owners must comply with the City’s nondiscriminatory-hiring policy and may not deny employment solely on the listed protected grounds. will not deny any individual employment
Benefits & exceptionsHide benefits & exceptions12
The TIF exempts 100% of the increase in assessed value on covered parcels from real-property taxation for up to 30 years per parcel, ending earlier if service payments can no longer be required. Owners must still make service payments generally equal to the taxes that would otherwise be due, and the TIF is subordinate to applicable CRA abatements. 100% of the increase in assessed value
Qualifying data-center buildings may receive a 100% real-property tax abatement for 15 years under the CRA. In return, the company owes annual PILOTs only for buildings that meet the agreement’s trigger: generally, data-center buildings of at least 100,000 square feet while subject to the CRA exemption. PILOT amounts vary by year and building size, and are subject to an annual CPI adjustment capped at 3%. 100%, 15-year real property tax exemption
TIF service payments are deposited in a separate fund and may pay or reimburse eligible public-infrastructure costs and related financing costs. Under the TIF agreement, up to 50% may reimburse the company for eligible infrastructure costs; up to 50%, or the remaining balance if company reimbursements are lower, may fund eligible city uses. Company reimbursement claims must be submitted by December 31, 2040, and city payments are limited to money in the TIF fund. up to fifty percent (50%) to reimburse the Company
The TIF covers listed parcels across the TIF Site; owners may also seek TIF exemptions for additional parcels within the site outside the defined Project Area. Such additional exemptions require separate, negotiated school-compensation agreements. Additional Properties
The city is to construct specified road, water, and wastewater improvements supporting the project. The company funds the water and wastewater work through an escrow account and reimburses eligible road-improvement costs under the development agreement; the agreements include schedules, cost limits, and change-order approval procedures. design and construct the Water and Wastewater Improvements
The water and wastewater agreement reserves tiered capacity for the project and requires service to meet stated quality standards. During shortages, public health and safety needs take priority; the project’s water-use priority is otherwise protected at no lower than indoor residential use, subject to the agreement’s stated exceptions. reserve and hold for the Customer continuous use
The city must maintain the systems serving the project and promptly pursue repairs and restoration after service interruptions. It may reduce or discontinue service below the agreed allocations only when necessary for the imminent protection of citizens’ health and safety, with reasonable notice. keep and maintain the portions of the Systems
Water and wastewater rates for the project may be no higher than the lowest applicable rates charged by the city. The agreement limits charges to actual water use and measured wastewater discharge, bars undisclosed project-specific fees, and makes rates subject to applicable law and city approval procedures. no higher than the lowest applicable Water Rate
The development agreement says later city rules generally will not apply to the project or property unless the company elects to have them apply. This protection does not override applicable state or federal law, and certain public-health-and-safety measures may still apply. No addition to, or modification of, the Applicable Rules
City staff agree not to recommend or support new taxes, assessments, charges, or fees applicable solely to the project or property without the company’s written consent. without the written consent of the Company
The city represents that the listed city approvals are the only city permits and approvals required to commence and complete the project, agrees to process them on stated timeframes, and will expedite city review and assist with other governmental approvals. These commitments are subject to the agreement’s terms and applicable rules. only permits, approvals, reviews and actions that are required by the City
The development agreement allows the company to receive project electricity through AES as its sole electric distribution utility provider, requires city cooperation with that arrangement, and provides for work on temporary construction power from the city utility. It also states that roof solar is a permitted use, though the company is not required to pursue it. receive electric power for the operation of the Project through AES
Sources
unknown · City of PiquaAllows data centers in light and heavy industrial districts, with screening required for outdoor tractor-trailer areas.Piqua Development Code amendment, Ordinance O-5-24
What this means
The measure would allow data centers in heavy-impact industrial districts and let them seek special-use approval in light-industrial districts, making development easier in some areas (district rules). Screening for certain outdoor truck areas and the need for special-use approval in light-industrial districts limit the benefit, but the overall effect is a meaningful boost.
Timing
- Ends
- 180 days after the ordinance's effective date
The City Commission may extend the moratorium by further action. Another source indicates there is no moratorium, so the sources conflict.
People behind it
- Kyle Hinkelman
Submitted the staff report for Ordinance O-5-24.
Restrictions & requirementsHide restrictions & requirements4
Data centers require special-use approval in industrial-light (IL) districts; they are permitted uses in industrial-heavy (IH) districts.
Outdoor areas used to load, park, or store tractor-trailers must have moderate-impact screening along common lot lines, except those adjoining warehouse, distribution, or industrial uses, and high-impact screening along lot lines adjoining public rights-of-way.
For administrative adjustments, a numerical standard generally cannot change by more than 15% unless another standard on the same site is improved by an equal or greater amount. Beyond that limit, the Development Director may require additional landscape screening or an equivalent replacement standard, or require a variance.
A zoning verification letter costs $30 per parcel.
Benefits & exceptionsHide benefits & exceptions2
Allows data centers as a permitted use in the IH (Heavy Industrial) district and by special use permit in the IL (Light Industrial) district. The measure also defines data centers and sets screening requirements for outdoor tractor-trailer areas. Data Center to Industrial uses
Allows administrative adjustments of more than 15% to a numeric development standard when another standard on the same site is improved by an equal or greater amount. This general development-code provision is not specific to data centers. Adjustment provision
Sources
pending · City of PiquaProhibits building data centers in Piqua if their monthly demand or peak load exceeds 25 megawatts.Piqua Prohibit Data Center Construction Initiative (November 2026)
What this means
The measure would block large data centers above 25 megawatts; reporting also says it would prohibit using or expanding data centers. The sources differ on whether smaller centers or existing operations are covered, but the ban on large projects is substantial.
People behind it
- Save Piqua
Proposed and submitted the charter-amendment petition to prohibit data centers and cryptocurrency-mining operations in Piqua.
- City of Piqua
Responsible for its portion of the petition-review process before referral to the county elections board.
- Miami County Board of Elections
Expected to review the petitions for signature validity.
Restrictions & requirementsHide restrictions & requirements1
The amendment is described as prohibiting construction, use, or expansion of data centers and cryptocurrency-mining operations in Piqua. Its specific construction provision applies to data centers whose aggregate monthly demand or peak load exceeds 25 megawatts, including related buildings, infrastructure, facilities, and preparatory or modification activities undertaken for a common purpose; the sources differ on whether the prohibition extends beyond that threshold.
Sources
pending · City of PiquaSubmits to voters a proposed charter amendment that would prohibit data center construction in Piqua.Piqua Ordinance O-11-26 (2026) — proposed Charter Section 138
What this means
The proposal is expressly described as a prohibition on constructing a data center, which would block new data center development within its scope. The source does not say whether existing centers could continue operating: “Prohibition of Construction of a Data Center”.
Restrictions & requirementsHide restrictions & requirements1
The proposed Charter Section 138 amendment would prohibit construction of a data center. The agenda identifies this as a proposed amendment, not an already enacted ban. Prohibition of Construction of a Data Center