City of New Albany

Slightly Pro-Data Center Policies

New Albany exempts data centers in certain districts from ordinary design guidelines, but projects still face permits and other requirements, including conditional-use approval in limited industrial districts.

current law · City of New Albany
Exempts data centers in New Albany’s Limited Industrial and General Employment districts from the city’s Design Guidelines and Requirements.New Albany Ohio Codified Ordinances Chapter 1153 — Limited Industrial and General Employment Districts

What this means

The measure modestly eases development by exempting data centers in LI and GE districts from the city’s Design Guidelines and Requirements (the guidelines do not apply to data centers). But other zoning and building rules remain, and data centers still require conditional-use approval in LI districts, so the practical benefit is limited.

People behind it

  • Requested the ordinance amending Chapters 1105, 1153, and 1157.

Restrictions & requirementsHide restrictions & requirements5
  • In the LI District, general office activities and data centers require conditional-use approval; they are permitted in the GE District. Data centers are conditional in LI and permitted in GE.

  • In both LI and GE districts, structures and service areas must be at least 25 feet from interior lot lines; lot coverage is capped at 75%; and structures, service areas, and parking areas must be at least 50 feet from districts where residences are permitted. Lot and yard requirements.

  • LI and GE data-center buildings remain subject to Chapter 1153’s architecture requirements, including screening roof-mounted equipment on all four sides and prohibiting reflective or mirrored glass. The New Albany Design Guidelines and Requirements do not apply to data centers in either district. Architecture requirements and the data-center exemption.

  • In the GE District, exterior storage is not allowed unless the Planning Commission approves an acceptable screening plan. Exterior storage in GE.

  • Operations in LI and GE must avoid dangerous or objectionable impacts on land in other zoning districts; the code sets limits on noise, perceptible vibration, nuisance odors, airborne pollutants, and lighting glare. Off-site impact requirements.

Benefits & exceptionsHide benefits & exceptions1
  • The New Albany Design Guidelines and Requirements do not apply to data centers in the LI Limited Industrial or GE General Employment districts. This exemption is limited to those districts and does not remove other applicable requirements of the zoning code. The DGRs shall not apply to ... data centers.

Sources

current law · City of New Albany
Creates a special zoning district for large technology projects, including data centers, and sets rules for where and how facilities can be built, including setbacks, landscaping, screening, and design review.New Albany Ohio Codified Ordinances Chapter 1154 — Technology Manufacturing District

What this means

The measure is generally favorable: it aims to streamline review procedures and says buildings for data centers are not subject to the City’s ordinary design guidelines (data centers). However, projects still face permit reviews and requirements such as setbacks and landscaping, making the benefit meaningful but conditional.

People behind it

  • Identified in the ordinance title as the party that requested enactment of Chapter 1154.

Restrictions & requirementsHide restrictions & requirements17
  • TMD zoning eligibility requires an application covering at least 500 contiguous acres, unless the proposed acreage plus contiguous property already zoned TMD reaches 500 acres. The 500-acre eligibility threshold could limit where a data center can use this district’s rules.

  • Minimum parcel area is 15 acres for a Flagship Project and 5 acres for a Primary Project. The minimum parcel sizes apply to TMD development.

  • A Planning and Design Permit is required for covered construction or structural alterations and for a change in building use. Applicants must submit separate Planning and Design, engineering, and commercial building permit applications; the review may require a traffic-analysis memorandum, site and landscaping plans, architectural renderings, and other listed materials. The permit and submittal requirements add review steps for covered projects.

  • Principal arterial setbacks generally require buildings to be at least 500 feet from the right-of-way, with alternatives of 400 feet or 300 feet if taller specified mounds are installed; pavement setbacks also apply. Other public streets generally require 50-foot building and 25-foot pavement setbacks. The roadway setbacks and mound alternatives constrain site layout.

  • Where residential uses are permitted, a 100-foot building and pavement setback applies; for Flagship Projects, a building over 65 feet high can trigger a 300-foot building setback. The rule has exceptions for common ownership and a filed waiver affidavit. The residential setback rule may reduce usable development area.

  • Impervious parcel coverage is capped at 85% for Flagship Projects and 75% for Primary Projects. The coverage limits restrict how much of a parcel can be covered by impervious surfaces.

  • Streams with drainage areas greater than 50 acres and their riparian corridors must be preserved; the corridor must be at least 100 feet wide, with at least 25 feet on each side of the stream centerline. Pavement and structures are generally barred there, subject to listed exceptions. The stream-corridor protections limit development in those areas.

  • Required mounding and landscaping must be installed along public-street frontages and residential property lines as development proceeds; phased installation is allowed under specified conditions, including when improvements will be within 800 feet of a perimeter boundary. Residential buffering can require a 10-foot mound and landscaping designed to reach 75% opacity at five years. The landscaping and buffering obligations can add site work and constrain project phasing.

  • For Primary Projects, architecture rules require screening of service and loading areas, consistent design and materials, and prohibit reflective or mirrored glass, prefabricated metal buildings, untreated masonry-block structures, and poured-concrete exterior walls, subject to stated exceptions. The chapter expressly identifies data-center buildings as non-office buildings subject to additional design standards. Flagship Projects are exempt from this section’s architecture requirements if they meet the district standards plan. The Primary Project design rules and Flagship exception may limit design and construction choices.

  • Outdoor storage must be fully screened to 8 feet if visible from a public street or from ground level within 200 feet of a parcel boundary not under common ownership; screened and unscreened storage must still meet pavement setbacks. The outdoor-storage screening rule applies to materials, equipment, and supplies.

  • If hazardous-material or hazardous-waste storage or processing is proposed, the applicant must describe it and its safety measures in the permit application, obtain necessary state and federal permits before undertaking it, keep it at least the greater of 200 feet from certain parcel boundaries or the applicable building setback, and provide a 10-foot masonry wall around visible outdoor activity areas. The hazardous-material requirements are conditional on proposing that storage or processing.

  • Parking-lot and private-drive lights must be cutoff and downcast, light poles generally cannot exceed 30 feet (or 18 feet within 300 feet of properties where residences exist or are permitted), and light may not spill onto adjacent TMD-zoned property. Permanent colored or neon exterior lights are prohibited. The lighting limits impose design and operating constraints.

  • Flagship Projects have no minimum or maximum parking or loading-space count, but their drive aisles and spaces must meet the district standards plan; Primary Projects must comply with Chapter 1167 parking and loading standards. The parking and loading rules apply according to project category.

  • Developers must dedicate rights-of-way for public streets—generally 100 feet for principal arterials and major collectors, or 60 feet for other street types—and grant adjacent easements as needed for streetscape improvements or utilities. Major-collector dedication may be reduced to 80 feet with City Engineer approval. The dedication and easement requirements impose land and infrastructure obligations.

  • Leisure trails must be provided as required by the district standards plan. The trail requirement is an additional site-development obligation.

  • Signage must comply with Chapter 1169 unless the district standards plan provides otherwise. The signage rule applies to signs in the district.

  • Advanced Fabric Structures are permitted only in a Primary Project on a single parcel or contiguous parcels totaling at least 100 acres; they must be climate-controlled, no higher than 65 feet, and meet specified fabric durability and wind-resistance standards and setbacks. The structure-specific limits apply if this building type is proposed.

Benefits & exceptionsHide benefits & exceptions15
  • For land zoned TMD, Chapter 1154 and its incorporated standards plan take precedence over conflicting ordinance rules. The chapter takes precedence over conflicting regulations.

  • TMD projects may use uses permitted or conditionally permitted in the Limited Industrial District as permitted uses, except personal services and retail sales, which are limited to accessory uses. LI permitted or conditional uses are permitted.

  • Flagship Projects are exempt from the City’s Design Guidelines and Requirements if they meet the TMD Landscape and Architecture Standards Plan. For Primary Projects, the code specifically says buildings for data centers are not governed by those design guidelines, while setting alternative design expectations for non-office buildings. Data centers are among the examples.

  • Zoning permits otherwise required under the cited zoning-permit sections are not required in the TMD. Zoning Permits shall not be required.

  • TMD property is exempt from the City’s Architectural Review District requirements. shall be exempt from all requirements contained in that Chapter.

  • Applicants may file planning-and-design, engineering, and building permits as full or phased submittals, and construction may be divided into phases. the option of filing the Planning and Design, engineering, and building permits as full or phased submittals.

  • Flagship Projects have no required minimum or maximum number of vehicle parking or loading spaces; their layouts and dimensions must follow the TMD standards plan. no requirement to provide a minimum or maximum amount.

  • The TMD lists essential services, electric switch yards, and bulk gas yards among its permitted uses. Electric Switch Yards.

  • Private or public water and wastewater treatment facilities are permitted when they serve a Flagship Project and are intended and projected to also serve one or more Primary Projects; they must use processes and infrastructure providing environmental benefits. projected capacity also to serve one or more Primary Projects.

  • Concrete batch plants are permitted within Flagship Projects. In Primary Projects they require Planning Commission conditional-use approval, a finding that they will not materially harm existing Flagship Project operations, safety, or viability, written notice to Flagship Project owners for hearings within 1,500 feet of its boundary, and renewal every four years. effective through the fourth anniversary.

  • Outdoor storage of materials, equipment, and supplies is allowed. Screening is not required when the storage is not visible from a public street or from ground level 200 feet from a parcel boundary not under common ownership; otherwise it must be screened to eight feet, and pavement setbacks still apply. Outdoor storage of materials, equipment, and supplies shall be permitted.

  • The code anticipates hazardous-waste and materials storage and processing in the TMD. Applicants must describe the activity and safety measures in a Planning and Design Permit application, comply with state and federal requirements and obtain necessary permits, observe the specified 200-foot or applicable building setback, and provide a ten-foot masonry wall for visible outdoor operations. hazardous waste and materials storage and processing is anticipated.

  • Solar energy systems are excluded from specified Primary Project screening requirements to the extent those requirements prevent or limit functionality, accessibility, or access to direct sunlight. Solar energy systems shall be excluded.

  • The TMD standards plan says the general buffering and screening requirements in Sections 1171.05 and 1171.06 are not required, and Chapter 1175 does not apply to the TMD. shall not be required.

  • The Community Development Director or designee may approve deviations or waivers from the TMD standards plan during Planning and Design Permit review if the proposal achieves an equal-or-better result and does not cause unmitigated adverse impacts. shall decide requests for waivers or deviations.