City of Lancaster
Mixed Data Center Policies
Ohio offers qualifying data centers significant sales-tax exemptions on equipment, subject to investment, payroll, reporting, and other conditions, while fees apply to participants. New exemption requests are paused, which may raise costs for new projects; data centers are not banned.
Rating and summary from Ohio statewide as there are no scored current or future laws outside temporary restrictions for City of Lancaster.
pending · City of LancasterWould allow data centers only in Lancaster’s Advanced Manufacturing district with special approval, while requiring 1,000-foot setbacks from residential districts, a 60-foot height limit, screening, and noise, lighting, and traffic controls.Lancaster Ohio Data Center Zoning Code (2026)
What this means
The proposal would allow data centers only in the Advanced Manufacturing district and only with Board of Zoning Appeals approval, while requiring 1,000-foot setbacks from residential districts and extensive buffering where those standards apply (AM district and special-exception limits; setbacks and buffer requirements). Lighting, noise, and traffic studies and controls add further costs and review, creating significant barriers even though development is not banned (operational standards).
People behind it
- Mayor
Listed as the official who offered the ordinance.
- Code Enforcement & Zoning Committee
Identified as having requested the ordinance.
- City of Lancaster
Petitioner for approval of the proposed data center regulations.
Show 1 more peopleShow fewer people
- Lancaster City Planning Commission
Reviewed the proposed amendments and recommended them to City Council.
Restrictions & requirementsHide restrictions & requirements9
Data processing centers are limited to Advanced Manufacturing districts and require a Special Exception approval from the Board of Zoning Appeals. Special Exception in AM Districts only
Where a center is adjacent to a residential district, principal structures and energy-generation-related accessory structures must be at least 1,000 feet away and no more than 60 feet high. Other accessory structures follow AM District standards. 1,000-foot minimum setbacks and 60-foot height limits
Within the required setback, a 50-foot buffer yard must include, for each 50 feet of frontage, at least 50 shrubs, 15 small trees, and 7 large trees, using species on the Lancaster Tree Commission’s approved list. It must also include a 12-foot berm with a 3:1 slope; if a berm is infeasible, the Board of Zoning Appeals may determine that an acoustic barrier of sufficient height and aesthetic design may be used. Buffer and screening requirements
Buildings must meet AM District architectural requirements and may not have blank, uninterrupted industrial walls facing public rights of way; visible walls must have murals, public art, or architectural treatments. Restrictions on blank industrial walls
Applicants must submit a photometric lighting plan with the Zoning Clearance Permit application, comply with the code’s lighting standards, and prevent light from spilling onto adjacent properties. Lighting plan and no-spillover requirement
Industrial noise, including industrial hum, may not exceed the average noise intensity of the busiest roadway within 0.25 miles of the site, as determined by a sound study from a qualified acoustical consultant; the study must accompany the Zoning Clearance Permit application. Noise limit and required sound study
Before construction starts, planned construction-traffic routes must be submitted to the City Engineer and City Planner for approval. Construction traffic routing approval
Centers must be designed, built, operated, and maintained in compliance with applicable federal, state, and local environmental laws, permits, approvals, and orders. Environmental compliance requirement
The standards apply to centers approved on or after the ordinance’s effective revision date, which remains a placeholder in the text. After that date, modifications, expansions, or increases in the intensity of an existing center’s operations must also comply. Applicability to new and changed centers
Benefits & exceptionsHide benefits & exceptions2
Creates a permitting path for data processing centers in the Advanced Manufacturing District through special-exception approval by the Board of Zoning Appeals; it does not make them permitted as of right. “may be permitted as a Special Exception”
The new standards apply to centers approved on or after the revision date. Existing centers can continue operating without complying with these standards unless they are modified, expanded, or increase their operating intensity; the draft leaves the revision date as a placeholder. “any modification, expansion, or an increase in the intensity”