City of Garfield Heights
Mixed Data Center Policies
Garfield Heights allows data centers in Commercial and Special Use districts, but setback and stormwater requirements may add costs or delays to construction and expansion.
Rating from Ohio statewide as there are no scored current or future laws outside temporary restrictions for City of Garfield Heights.
current law · City of Garfield HeightsClassifies data centers as light-industrial uses allowed in Commercial and Special Use districts, but treats those with an electricity-generation plant as heavy industrial.Garfield Heights Code Chapter 1154 (2026)
What this means
The measure would allow data centers in Commercial and Special Use districts, so it would not ban them. But setback and stormwater requirements could add meaningful costs or delays to building and expanding them.
Timing
- Ends
- six months from the effective date
The ordinance states no extension condition. The adopted code source indicates there is no moratorium, so the sources conflict.
People behind it
- City Council
Adopted the Planning and Zoning Code.
- Building Commissioner
May initiate proposed text amendments and administers zoning permit review.
- Planning Commission
Reviews site plans and recommends proposed text amendments to City Council.
Show 5 more peopleShow fewer people
- Law Department
Receives proposed text amendments and transmits them to the Planning Commission.
- City of Garfield Heights
Administers and enforces provisions of the Code, including stormwater and illicit-discharge regulations.
- Board of Zoning Appeals
Decides conditional-use and variance applications under the Code.
- City Engineer
Reviews stormwater plans and oversees specified stormwater compliance and inspections.
- Economic Development Director
Shares responsibility with the Building Commissioner for interpreting and classifying proposed land uses.
Restrictions & requirementsHide restrictions & requirements13
Data server centers are classified as Light Industrial uses and are allowed only in the Commercial and Special Use districts, subject to Administrative Review. These districts require at least 20,000 square feet of lot area, 100-foot lot width and depth, 35-foot setbacks, and limit building height to 80 feet; within 40 horizontal feet of residential or Neighborhood Mixed-Use property, the height limit is 40 feet.
A zoning permit is required before constructing or modifying a structure or starting or changing a land use. Applications require a fee, and a permit expires if the approved development or use is not initiated within two years.
Commercial and Special Use zoning-permit applications require site-plan materials that include detailed utility, fire-protection, and landscape plans, along with a construction schedule and other information.
Commercial or industrial site development disturbing more than 0.2 acre requires an approved Comprehensive Stormwater Management Plan before a zoning permit can issue. Where a plan is required, soil-disturbing work cannot begin until a cash bond equal to 10% of total project cost is posted.
Construction disturbing one acre or more requires an Ohio EPA NPDES construction permit where applicable, and the City requires confirmation of that permit before issuing a zoning permit. Regulated projects also require approved stormwater pollution prevention plans.
New parking lots, parking lots over 3,000 square feet, certain parking-lot expansions, and new construction exceeding 3,000 square feet trigger landscaping requirements, including landscape islands and perimeter planting. Parking and loading areas must have a City Engineer-approved hard, dustless surface, and parking-area stormwater must drain to on-site detention basins, rain gardens, or dry wells.
Commercial or Special Use lots abutting a Residential District must provide a landscaped buffer at least 10 feet deep along the shared boundary, including a solid brick wall of the specified height.
Light Industrial operations may not emit fumes, odors, vibrations, dust, or other effects that threaten the safety or health of users on adjacent lots or damage adjacent structures.
Outdoor lighting must be constant, shielded, and directed to avoid glare and light trespass. Light poles may not exceed 20 feet unless a variance is granted.
In the Environmentally Sensitive Overlay, buildings, structures, and impervious surfaces are generally prohibited; limited exceptions require written Planning Commission permission. The overlay applies within 50 feet of wetlands, in floodplains, and on slopes of 15% or greater.
Riparian setbacks apply along designated watercourses and are generally 25, 75, or 120 feet on each side, depending on drainage area. Construction, parking, and other activities not specifically allowed by the Code are prohibited within the setback.
On hillside areas with an average slope of at least 12%, a hillside protection permit and grading, hydrological, and landscaping plans may be required before building or subdivision permits issue. The required undisturbed share of a parcel ranges from 65% for slopes of 12–18% to 97% for slopes of 36–100%.
Development in a special flood hazard area requires a floodplain development permit before construction or other development begins. New or substantially improved structures must meet applicable elevation or floodproofing requirements, and floodway development generally may not increase base-flood levels.
Benefits & exceptionsHide benefits & exceptions6
Data server centers are classified as Light Industrial uses, which are allowed through Administrative Review in the Commercial and Special Use districts, subject to other applicable code and permitting requirements. Data server centers and Light Industrial uses
The code does not require a minimum number of parking spaces for lots or uses, including data centers; other parking standards still apply. does not mandate a minimum number of parking spaces
A lawfully established data-center use that later becomes nonconforming may continue without a new zoning permit, and its nonconforming status runs with the land when ownership changes. A nonconforming use may be continued and shall run with the land
A nonconforming use may expand into part of a lot or structure that was manifestly arranged for that use while it was lawful. Any increase in operating intensity must be proportionate to the area expansion; other expansion is restricted. manifestly arranged for such use
A lawfully built nonconforming structure may be maintained or repaired, or replaced, reconstructed, or expanded, provided the work does not increase its nonconforming dimensions or create additional nonconformities. A nonconforming structure may be maintained and repaired and may be expanded or reduced
If a data-center use or structure complied with applicable use or design standards when established or built, those earlier standards continue to govern that subject despite later code changes. This does not apply to a new use or newly built structure. earlier-enacted standards shall control