City of Elyria
Pro-Data Center Policies
Elyria’s status listing says the measure is enacted, though its description calls it a draft; it would allow data centers in Commercial Districts through administrative review, while ordinary permits still apply.
current law · City of Elyria, within the TPD Technology Park DistrictAllows enclosed computer operations and data-processing facilities in Elyria’s Technology Park District, subject to district requirements; the separate draft that explicitly names data server centers is not adopted.Elyria Ohio data-center-specific laws and bans
What this means
If enacted, the draft would modestly ease data-center development by expressly including data server centers as low-intensity industrial uses and allowing that use through administrative review in the Commercial District (data server centers). That offers a route beyond the existing Technology Park District, which has a 50-acre minimum (minimum planned district area), though ordinary zoning and permit requirements would still apply.
People behind it
- Zoning Administrator
One of the officials responsible for implementing and administering the Code; specifically tasked with administering it. administer the Zoning Code
- Planning Commission
Named as responsible for implementing and administering the Code, and may initiate amendments to it. responsibility for implementing and administering this Code
- Board of Zoning Appeals
Named as responsible for implementing and administering the Code. responsibility for implementing and administering this Code
Show 2 more peopleShow fewer people
- Council
Named as responsible for implementing and administering the Code, and may initiate amendments to it. responsibility for implementing and administering this Code
- Private land owners
May initiate amendments to the Zoning Code or Official Zoning Map. may be initiated by
Restrictions & requirementsHide restrictions & requirements11
The not-adopted draft classifies “data server centers” as low-intensity industrial uses. It lists low-intensity industrial uses for administrative review in the Commercial and Industrial 1 districts; unlisted uses are generally prohibited in other districts unless deemed similar to an allowed use or approved by use variance. Data server centers unlisted uses are prohibited Commercial and Industrial 1 use tables
Under the not-adopted draft, a data center would face zoning approvals before construction or expansion: a zoning certificate is required before City permits, a zoning permit is required for new construction and for expansion or structural alteration, and zoning and design review applies to new nonresidential buildings, additions, and alterations. Certificate required before permits zoning permit triggers design review requirement
In the existing Technology Park District (TPD), listed computer operations and data processing uses are allowed only if conducted within an enclosed building. Permitted uses must be enclosed computer operations and data processing
TPD development has a substantial site-size threshold: the planned district must be at least 50 acres, have at least 300 feet of frontage, and a rezoning request may be made by owners of a tract of 50 acres or more. Minimum district size and frontage rezoning tract threshold
TPD imposes dimensional limits: structures may not exceed 40 feet; buildings and structures may cover no more than 20% of the district, excluding parking lots; and a 60-foot perimeter transitional yard is required. If lots are used, each must be at least 3 acres, with specified setbacks of 60 feet or 100 feet next to residential property and a 30% maximum lot coverage. Height limit district coverage and perimeter yard lot standards
TPD buildings must meet minimum separation and court-size rules: facing walls with windows must be separated by at least 40 feet and by at least the average height of those walls; other facing-wall cases require 30 or 20 feet, and inner and outer courts generally must be at least 40 feet wide. Building separation standards court dimensions
TPD development requires landscape buffering at least 20 feet wide along boundaries adjoining more restrictive zoning districts, with screening consisting of plant material. Buffer width and location screening consists of plant material
In TPD, Planning Commission approval of site-development plans is required before a building permit; proposed building additions and changes in use or occupancy also require Commission approval before a building permit or certificate of occupancy, respectively. Submissions can require plans or reports addressing traffic, noise, glare, air pollution, hazardous materials, sewage and industrial waste, and fuel and smoke controls. Approval before building permits required plans and reports
TPD uses must comply with ongoing operating standards. These include limits on noise, odors, glare and heat, vibration, smoke, dust, and gases; for example, illumination at or beyond a residential-district boundary may not exceed 0.1 footcandle, and vibration may not be perceptible beyond the property line for three minutes or more in an hour. Performance standards apply to uses 0.1-footcandle and vibration limits
TPD requires underground installation of electric and telephone utilities, including transformers; water and sewer facilities must be available or provided, and on-site stormwater management requires Planning Commission approval. Underground utilities and water and sewer stormwater approval
TPD outdoor storage is allowed only in conjunction with pilot plants or production facilities, not within required building setbacks or front yards, and must be screened; all outdoor-storage proposals require Planning Commission approval. Storage-use limitation and approval location and screening limits
Benefits & exceptionsHide benefits & exceptions5
The draft expressly includes data server centers in the low-intensity industrial use category. That category is allowed through administrative review in the Commercial and Industrial 1 districts, rather than conditional-use review, subject to the district rules and the requirement that the use not create specified hazards or adverse effects for adjacent lots. Data server centers
In the Technology Park District (TPD), computer operations and data processing are principally permitted if conducted inside enclosed buildings. The TPD has significant eligibility and site limits, including a minimum planned district area of 50 acres. Computer operations and data processing and minimum planned TPD area
The TPD requires underground installation of electric and telephone utilities and requires public or private water and sewer facilities to be available or provided as part of development. On-site stormwater management, including retention ponds and swales, is allowed with Planning Commission approval. Utilities and storm water management
For a qualifying complete permit application, the draft says the City reviews it under the code in effect when the application was received. This can preserve the applicable rules for a data-center project already in the application process. Applications with all required materials
A lawfully established use that later becomes nonconforming may continue without a new zoning permit. Expansion is generally restricted, but the draft allows use of portions of a lot or structure that were manifestly arranged for that use when it was lawful, with proportional expansion in intensity. A nonconforming use may be continued