Flathead County
For Flathead County, see Montana’s statewide laws and regulations below. No additional county-specific measures are listed in our research.
Pro-Data Center Policies
Montana limits government restrictions on lawful computing unless narrowly justified, while allowing action against nuisances and requiring risk plans for certain AI-controlled critical infrastructure. Qualifying large data centers receive favorable property-tax treatment, with some limits on power sales and infrastructure tax benefits.
Incentives
Tax benefits4
Establishes preferential class-seventeen taxation for qualified data center property at 0.9% of its market value.
Qualified data center property receives a preferential class-seventeen taxable percentage: 0.9% of its market value.
Expands eligibility for the 0.9% class-seventeen taxable percentage to qualifying facilities with 25,000 square feet of new or expanded area.
Expands preferential class-seventeen treatment to qualifying onsite electrical generation and storage systems; adds a subsequent class-thirteen rate at half the rate.
current law · StatewideLimits government restrictions on data center computing to those narrowly necessary for compelling reasons, while allowing action against nuisances caused by physical data center infrastructure.Montana Code Annotated Title 2, Chapter 10 — Right to Compute Act
What this means
The measure would make it harder for state and local governments to restrict lawful use of computing resources, including at data centers, unless the limits are narrowly tailored to a strong public-health or safety need (limits on government restrictions). It still allows action against data-center nuisances and requires certain AI-controlled critical infrastructure to have shutdown and risk-management plans, so the benefit is meaningful but not unlimited.
People behind it
- Daniel Zolnikov
RepublicanPrimary sponsor, requester, and legislator who introduced the measure
- Casey Pallister
Drafter of the measure
- Curtis Schomer
Carrier of the measure
Restrictions & requirementsHide restrictions & requirements1
A data center that qualifies as a critical infrastructure facility and is controlled in whole or in part by a critical artificial intelligence system must maintain the capability to disable the system and return control to humans within a reasonable time. The deployer must consider infrastructure disruptions before a full shutdown and implement, annually review, and test a risk-management policy with fallback, redundancy, and mitigation measures to maintain operations without the AI system. Federal compliance satisfies this requirement.
Benefits & exceptionsHide benefits & exceptions1
Limits state and local government actions that restrict the lawful private ownership or use of computational resources. This protection covers laws, ordinances, regulations, rules, policies, fees, conditions, tests, permits, and administrative practices, and requires restrictions that infringe property or free-expression rights to be demonstrably necessary and narrowly tailored to serve a compelling public-health or safety interest. The protection is limited by federal law and by recognized interests such as preventing physical data-center nuisances. Government actions that restrict the ability to privately own or make use of computational resources
Sources
current law · StatewideSets a special 0.9% property-tax rate for qualifying data centers and certain power and communications equipment.Montana SB 359 (2017)
What this means
Qualifying data centers would get a low property-tax rate of 0.9% of market value, which can make building or expanding them less costly. The benefit is limited to large projects meeting size and investment thresholds, but it does not add meaningful operating restrictions.
People behind it
- Sen. Mark Blasdel
RepublicanIdentified as the sponsor of SB 359.
- Montana Department of Revenue
Provides the application for seeking Class 17 status and receives and reviews qualified data center classification applications.
Restrictions & requirementsHide restrictions & requirements6
Class 17 eligibility is limited to qualifying facilities on contiguous parcels under single ownership. The sources describe a 300,000-square-foot and $150 million cost test, and a separate test requiring at least 25,000 square feet of new or expanded area and $50 million invested over 48 months. The construction-start dates differ by test: the sources specify after June 30, 2017, for the former and after January 1, 2019, for the latter.
To receive Class 17 treatment during construction before the facility meets the requirements, the taxpayer must certify to the department before March 1 of the first tax year that the facility will qualify within two years.
Applicants seeking classification for the current tax year must submit a completed application and all required supporting documents by March 1.
Onsite electrical generation and storage systems generally must supply at least 80% of their electricity for onsite consumption annually, with annual certification and utility-grade metering at the generation point. The 80% requirement is waived during a governor-declared electrical-generation emergency for qualifying backup systems supplying the utility.
The Class 17 tax treatment for qualifying communications infrastructure and certain onsite generation systems is time-limited; after the term, the property is taxed as Class 13. The sources differ on the term, giving 10 years in one version and 15 years in another.
Class 17 property is taxed at 0.9% of market value; property in an urban renewal area or targeted economic development district is also subject to specified school and state equalization mills.
Benefits & exceptionsHide benefits & exceptions4
Qualifying data-center property is classified as Class 17 and taxed at 0.9% of market value. A facility may qualify with at least 300,000 square feet and $150 million in costs, with construction starting after June 30, 2017, or with at least 25,000 square feet of new or expanded area and $50 million invested within 48 months, with construction starting after January 1, 2019. Covered property includes land, improvements, equipment, and certain supplies and infrastructure, subject to exclusions.
Property at a data center under construction may receive Class 17 treatment before the facility qualifies if, before March 1 of the first tax year seeking the classification, the taxpayer certifies that the facility will meet the requirements within two years.
Qualifying dedicated interstate or intrastate communications infrastructure owned or leased by a data-center owner receives the Class 17 tax rate for a limited period, then is taxed as Class 13. The current codification specifies 10 years, with construction starting after June 30, 2017, and before July 1, 2037; an earlier version specifies 15 years and a July 1, 2027 cutoff.
Certain electrical generation and storage systems on the facility side of the utility meter receive the Class 17 tax rate for 10 years from the start of construction, then are taxed as Class 13. They must primarily serve the data center; ordinarily, at least 80% of annual electricity output must be consumed onsite, with utility-grade metering and annual certification. The 80% requirement does not apply during a declared electrical-generation emergency when qualifying backup generation is made available to the utility.
Sources
current law · StatewideExpands data centers’ eligibility for Montana’s reduced property-tax rate to cover onsite power systems, extends the deadline for qualifying communications infrastructure to 2037, and sets rules for selling data-center-generated power to utilities and cooperatives.Montana Code Annotated § 15-6-162
What this means
The measure makes data center development more attractive by including onsite power and storage systems in the tax-favored property class and extending the deadline for qualifying communications infrastructure. But it also shortens that infrastructure’s favorable tax period from 15 years to 10 and adds conditions on power sales, so the overall benefit is meaningful but limited.
People behind it
- Katie Zolnikov
RepublicanIdentified as the bill sponsor and listed as an introducer of HB 424.
- M. Bertoglio
Listed as an introducer of HB 424.
- D. Fern
Listed as an introducer of HB 424.
Show 6 more peopleShow fewer people
- D. Harvey
Listed as an introducer of HB 424.
- M. Regier
Listed as an introducer of HB 424.
- S. Fitzpatrick
Listed as an introducer of HB 424.
- B. Ler
Listed as an introducer of HB 424.
- G. Hertz
Listed as an introducer of HB 424.
- K. Bogner
Listed as an introducer of HB 424.
Restrictions & requirementsHide restrictions & requirements9
To qualify as a class seventeen data center, a facility must be on contiguous land under single ownership, including only a wholly owned subsidiary or a parent company with 100% ownership, and must meet either a 300,000-square-foot and $150 million investment threshold or a 25,000-square-foot new or expanded area and $50 million investment threshold within 48 months. The applicable construction start dates are after June 30, 2017, or after January 1, 2019, respectively. (qualified data center)
During construction, property that does not yet meet the qualification requirements may receive class seventeen treatment only if the taxpayer certifies to the Department of Revenue before March 1 of the first applicable tax year that the facility will satisfy those requirements within two years after certification. (within 2 years)
Dedicated interstate or intrastate communications infrastructure owned or leased by a qualified data center must begin construction after June 30, 2017, and before July 1, 2037, and must satisfy the data-center qualification criteria to receive class seventeen treatment. (before July 1, 2037)
Electrical generation and storage systems qualify for class seventeen treatment only if they are located on the facility side of the utility meter, are primarily used for onsite power, and commence operation after May 13, 2025. (primarily used by a qualified data center for onsite power)
Electrical generation and storage systems are considered primarily used onsite only when at least 80% of their annualized kilowatt-hour output is consumed onsite. The data center must certify this annually to the Department of Revenue and install utility-grade metering at the generation point. The 80% requirement is waived during a governor-declared electrical generation emergency when qualifying backup generation is made available to the utility to serve customers. (at least 80% for onsite consumption)
The special class seventeen tax treatment for dedicated communications infrastructure and qualifying electrical generation systems lasts only 10 years from the start of construction. Afterward, the property is taxed as class thirteen property. (taxed at the rate provided for in subsection (8) for a period of 10 years)
If a qualified data center sells electricity produced by an owned generator to a public utility or electric cooperative, the sale price may not exceed the generator's cost of production. The utility or cooperative may annually audit the generator's operating costs at its own expense. (the price may not exceed the cost of production)
For electricity sold under the act, allowable production costs exclude corporate administration, travel, and corporate legal services, which limits the costs that may be recovered through the sale price. (does not include)
Class seventeen property located in an urban renewal area or targeted economic development district remains subject to the elementary, high school, and state equalization mills, creating a tax cost even when the property receives the class seventeen rate. (is subject to the elementary, high school, and state equalization mills)
Benefits & exceptionsHide benefits & exceptions8
Qualified data centers receive Class 17 property-tax treatment: qualifying land, improvements, furniture, fixtures, equipment, tools, and supplies are taxed at 0.9% of market value. Eligibility generally requires either a 300,000-square-foot facility costing at least $150 million or a 25,000-square-foot new or expanded area involving at least $50 million invested over 48 months. (https://mca.legmt.gov/bills/MCA/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html#:~:text=Property%20identified%20as%20class%20seventeen%20property)
The ownership requirement is broadened so that a single ownership entity may include a wholly owned subsidiary or a parent company with a 100% ownership interest, making it easier to structure qualifying projects. (https://mca.legmt.gov/bills/MCA/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html#:~:text=provided%20that%20a%20single%20ownership%20entity%20includes)
Property at a data center under construction may receive Class 17 treatment before it meets the qualification thresholds if, before March 1 of the first applicable tax year, the taxpayer certifies that the facility will meet those requirements within two years. (https://mca.legmt.gov/bills/MCA/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html#:~:text=During%20construction%2C%20property%20not%20meeting%20the%20requirements)
Class 17 treatment includes onsite electrical generation and storage systems that begin operating after May 13, 2025, are on the facility side of the utility meter, and are primarily used by the data center for onsite power. Those systems receive the 0.9% rate for 10 years from the start of construction, then are taxed as Class 13 property. (https://mca.legmt.gov/bills/MCA/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html#:~:text=electrical%20generation%20and%20storage%20systems%20that%20commence%20operation)
A data center's dedicated interstate or intrastate communications infrastructure, including qualifying telecommunications or data lines and related equipment, may receive Class 17 treatment if construction begins after June 30, 2017, and before July 1, 2037. It receives the 0.9% rate for 10 years from construction commencement before shifting to Class 13 taxation. (https://mca.legmt.gov/bills/MCA/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html#:~:text=construction%20of%20the%20owned%20or%20leased%20interstate%20or%20intrastate%20communications%20infrastructure)
After the 10-year Class 17 period, qualifying dedicated communications infrastructure and onsite electrical generation systems receive half of the normal Class 13 taxable rate for an additional 10 years. (https://archive.legmt.gov/content/Sessions/69th/Contractor_index/CH0678.pdf#:~:text=Property%20described%20in%20subsection%20(1)(e)%20is%20taxed%20at%20half%20the%20rate)
A qualified data center may sell electricity generated by its own generator to a public utility or electric cooperative at a price no higher than the generator's cost of production. Eligible costs include construction capital, depreciation, operating personnel, fuel, supplies, utilities, and necessary contracted services; the buyer may audit operating costs annually at its own expense. (https://archive.legmt.gov/content/Sessions/69th/Contractor_index/CH0678.pdf#:~:text=If%20electrical%20power%20produced%20by%20a%20generator%20owned%20by%20a%20qualified%20data%20center%20is%20sold)
The 80% onsite-consumption requirement for Class 17 electrical generation and storage systems does not apply during a governor-declared electrical generation emergency when the data center makes facility-side electricity available to the utility to help serve residential and business customers. (https://mca.legmt.gov/bills/MCA/title_0150/chapter_0060/part_0010/section_0620/0150-0060-0010-0620.html#:~:text=If%20the%20governor%20declares%20an%20electrical%20generation%20emergency)
Sources
current law · StatewideSets a special property-tax rule for qualifying data centers, applying a 0.9% rate to their property.Montana H507 (2019)
What this means
Qualifying data centers get a substantial property-tax benefit: their taxable value is set at 0.9% of market value. The benefit can encourage large projects, but size and investment requirements mean it does not apply to every data center.
People behind it
- Edward Buttrey
RepublicanSponsor of HB 507.
- Montana Department of Revenue
Provides the application process for seeking Class 17 status for a qualified data center.
Restrictions & requirementsHide restrictions & requirements5
Class 17 tax status is limited to facilities under single ownership on contiguous parcels that meet one of two size-and-investment tests: at least 300,000 square feet and $150 million in total costs, with construction starting after June 30, 2017; or at least 25,000 square feet of new or expanded area and $50 million invested within 48 months, with construction starting after January 1, 2019.
A facility seeking Class 17 status must submit a Qualified Data Center Application.
A facility still under construction that has not yet met the qualification requirements receives Class 17 treatment only if the taxpayer certifies to the department before March 1 of the first tax year the classification applies that the facility will qualify within two years of certification.
Electrical generation and storage systems seeking Class 17 treatment generally must have at least 80% of annual output consumed onsite, with annual taxpayer certification and utility-grade metering at the generation point. The 80% requirement does not apply during a governor-declared electrical generation emergency when qualifying backup systems supply electricity to the utility for residential and business customers.
Class 17 property in an urban renewal area or targeted economic development district is subject to specified elementary, high school, and state equalization mills.
Benefits & exceptionsHide benefits & exceptions3
Qualified data-center land, improvements, furniture, fixtures, equipment, tools, and supplies not otherwise in Class 5 receive Class 17 tax treatment at 0.9% of market value. A facility must meet one of the specified size, investment, and construction-date tests: at least 300,000 square feet and $150 million in cost, or at least 25,000 square feet of new or expanded area and $50 million invested over 48 months.
Property at a data center under construction may receive Class 17 treatment before the facility meets the qualification requirements if the taxpayer certifies before March 1 of the first tax year that the facility will meet them within two years.
Qualifying dedicated communications infrastructure owned or leased by a qualified data center receives Class 17 treatment for 15 years from the start of construction, subject to the section’s criteria and construction-date limits; afterward it is taxed as Class 13 property. Another supplied version states a 10-year term and different construction-date limits.
Sources
current law · StatewideProhibits cities and counties from imposing requirements on digital-asset mining businesses unless they also apply to data centers in the same area.Mont. Code Ann. § 76-2-1003 — Right to mine digital assets
What this means
The measure would require local rules for digital-asset mining businesses to apply to data centers too, which could add some requirements for data centers where those rules are adopted (rules must also apply to data centers). It does not directly ban or promote data-center construction, so the likely effect is limited.
People behind it
- Senator Daniel Zolnikov
RepublicanPrimary sponsor of SB 178, which enacted the measure.
Sources
current law · StatewideRevises data-center tax rules to include qualifying on-site power systems, extend infrastructure eligibility through 2037 but limit its preferential tax rate to 10 years, require certain power sales to utilities to cover no more than production costs, and apply school taxes to data centers in designated redevelopment districts.Montana HB 424 (2025) Chapter 678
What this means
The measure modestly favors development: qualifying data centers keep the 0.9% property-tax rate, and certain onsite power systems can qualify for that treatment (0.9% of its market value). But it also limits the price data centers can charge when selling power and shortens the special tax period for communications infrastructure, so the overall benefit is limited.
People behind it
- Katie Zolnikov
RepublicanPrimary sponsor of HB 424.
- Marta Bertoglio
RepublicanCo-sponsor and bill requester.
- Dave Fern
Democratic
Co-sponsor and bill carrier.
Show 7 more peopleShow fewer people
- Derek Harvey
Democratic
Co-sponsor of HB 424.
- Matt Regier
RepublicanCo-sponsor of HB 424.
- Steve Fitzpatrick
RepublicanCo-sponsor of HB 424.
- Brandon Ler
RepublicanCo-sponsor of HB 424.
- Greg Hertz
RepublicanCo-sponsor of HB 424.
- Kenneth Bogner
RepublicanCo-sponsor of HB 424.
- Megan Moore
Drafter of HB 424.
Restrictions & requirementsHide restrictions & requirements7
Class 17 tax classification is limited by ownership, site, size, and investment conditions: buildings must be under a single ownership entity (with only specified wholly owned subsidiary or 100%-owned parent arrangements), on contiguous parcels, and meet either the 300,000-square-foot/$150 million threshold or the 25,000-square-foot expansion/$50 million investment threshold. The qualification criteria
For class 17 treatment during construction, the taxpayer must certify before March 1 of the first tax year that the facility will meet the qualification requirements within two years. Certification during construction
Certain data-center generation and storage systems qualify as class 17 property only if they begin operating after May 13, 2025, are on the facility side of the utility meter, and are primarily used for onsite power. Requirements for generation and storage systems
Covered generation and storage systems must be used at least 80% for onsite consumption, measured annually and certified to the department; utility-grade metering must be installed at the point of generation. The 80% requirement is waived during a declared electrical-generation emergency if the data center makes its behind-the-meter electricity available to the utility to serve customers. Onsite-use and metering requirements
If a data center sells power produced by its generator to a public utility or electric cooperative, the sale price may not exceed production cost; the utility or cooperative may annually audit the generator’s operating costs at its own expense. Power-sale price and audit provisions
Class 17 property located in an urban renewal area or targeted economic development district is subject to elementary, high-school, and state equalization mills. School equalization mills
Eligible dedicated communications infrastructure and qualifying electrical-generation systems receive the class 17 taxable percentage for ten years; afterward they are taxed as class 13 property, at half the class 13 rate for the following ten years. Ten-year classification period
Benefits & exceptionsHide benefits & exceptions6
Qualified data-center property is taxed at 0.9% of market value. Eligibility requires a qualifying facility to meet one of the specified size and investment tests; property may be locally or centrally assessed. Class seventeen property is taxed at 0.9%.
A data center may meet the single-ownership requirement through a wholly owned subsidiary or a parent company with a 100% ownership interest. A single ownership entity includes a wholly owned subsidiary.
Certain onsite electrical generation and storage systems are included as class seventeen property and receive the 0.9% tax treatment for 10 years from construction, after which they are taxed as class thirteen property. The systems must commence operation after May 13, 2025, be on the facility side of the utility meter, and be primarily used onsite. Electrical generation systems are taxed at the class seventeen rate for 10 years.
Dedicated communications infrastructure owned or leased by a qualified data center can receive class seventeen tax treatment for 10 years from construction, then moves to class thirteen treatment. Construction must commence after June 30, 2017, and before July 1, 2037, extending the eligibility deadline beyond 2027. Construction must commence before July 1, 2037.
During construction, property can receive class seventeen classification if, before March 1 of the first tax year at issue, the taxpayer certifies that the facility will meet the qualification requirements within two years. The taxpayer certifies that the facility under construction will meet the requirements.
The usual 80% onsite-consumption test for generation and storage systems does not apply during a governor-declared electrical-generation emergency if the data center relies on backup generation and makes the electricity available to the utility to help serve customers. The 80% requirement does not apply.
Sources
current law · StatewideLimits government restrictions on lawful computing, but requires risk-management policies for critical-infrastructure facilities controlled by critical AI and preserves authority to address nuisances caused by physical data-center infrastructure.Montana SB 212 (2025)
What this means
The measure would make it harder for state and local governments to restrict lawful use of computing resources, which could benefit data center development and operations (restrictions must be narrowly tailored). It still allows action to address data center nuisances and requires a risk policy for certain critical infrastructure controlled by critical AI, so the benefits are meaningful but not unlimited (risk management policy requirement).
People behind it
- Daniel Zolnikov
RepublicanSponsor and requester; introduced SB 212. (Sponsor: Daniel Zolnikov)
Restrictions & requirementsHide restrictions & requirements1
Government may restrict computational-resource use to prevent or abate common-law nuisances caused by physical data-center infrastructure, provided the restriction is demonstrably necessary and narrowly tailored to that compelling interest (“prevent or abate common law nuisances”).
Benefits & exceptionsHide benefits & exceptions2
The Right to Compute Act limits government actions that restrict private ownership or lawful use of computational resources when those actions infringe property or free-expression rights: restrictions must be demonstrably necessary and narrowly tailored to serve a compelling government interest. This protection is not absolute and does not bar restrictions meeting that standard. “must be limited to those demonstrably necessary”
If a critical infrastructure facility is controlled in whole or in part by a critical AI system, its deployer must develop a reasonable risk-management policy after deployment. A plan prepared under federal requirements counts as compliance with this state requirement, avoiding a separate state plan when that condition is met. “A plan prepared under federal requirements constitutes compliance”
Sources
failed · StatewideProposed a statewide framework for data-center development in Montana, but died before becoming law.Montana HB 877 (2025)
People behind it
- John Fitzpatrick
RepublicanBill sponsor and requester
- Burns, Griffin
Identified as the bill drafter
Sources
failed · StatewideProposed a study of data centers’ energy and utility impacts, but died in committee and did not become law.Montana HJ 46 (2025)
What this means
The measure would study data centers, rather than create rules or incentives for building, expanding, or operating them (“Study resolution on data centers”). The study could inform future policy, but by itself it would have no meaningful practical effect on data center projects.
People behind it
- Tom Millett
RepublicanPrimary sponsor of HJ 46.
- Greg Kmetz
RepublicanCo-sponsor of HJ 46.
- Janet Ellis
Requester of the measure.
Show 1 more peopleShow fewer people
- Griffin Burns
Drafter of the measure.
Sources
failed · StatewideWould have revised how electricity rates are set for data centers, but the bill was tabled and did not become law.Montana HB 263 (2025)
People behind it
- Katie Sullivan
Democratic
Sponsor of House Bill 263.
- Janet Ellis
Identified as the bill’s requester.
Restrictions & requirementsHide restrictions & requirements1
Requires a separate utility rate schedule for data centers and digital-asset mining operations, with rates designed to make those customers bear the costs of serving them rather than shifting those costs to other ratepayers.