City of Mason

Anti-Data Center Policies

Mason city’s enacted ordinance does not ban data centers, but new or expanded facilities face strict noise and vibration limits, studies, and possible monitoring; lawfully operating equipment is exempt unless altered to increase noise.

current law · City of Mason
Limits data centers’ continuous equipment noise and vibration at property boundaries, requires pre-construction sound studies, and restricts routine generator testing.City of Mason Ordinance No. 272 (2026)

What this means

The measure does not ban data centers, and it exempts equipment already operating unless it is changed in a way that increases noise. But new or expanded facilities would face strict noise and vibration limits, applicant-funded baseline studies, and possible ongoing monitoring, creating significant costs and making compliance harder. The ordinance sets city-wide noise and vibration standards.

People behind it

  • Submitted the citizen-initiated petition proposing the noise ordinance, as reported in the petition initiative.

  • Reviewed and certified petition signatures and formally presented the petition to City Council, as stated in the Clerk’s certification letter.

  • Voted unanimously to adopt the citizen-initiated ordinance, according to the report that Council members voted unanimously.

Restrictions & requirementsHide restrictions & requirements28
  • A moratorium on approving data centers as a land use is listed for Ordinance 267. The source does not state its duration or exceptions. moratorium on the approval of data centers

  • Under the proposed M-3 zoning rules, technology and data-center uses would require a special use permit; uses permitted by right would be limited to agriculture. Rezoning to M-3 would require an application covering at least 50 contiguous acres. minimum of fifty (50) contiguous acres

  • M-3 special use applications would have to document expected water and electricity use, identify wastewater contents that could affect treatment, provide an environmental impact statement and proposed mitigation, map construction and maintenance routes, and include decommissioning and emergency-response plans. Include expected water use amount

  • No M-3 special use permit or development or utility agreement could be approved until the City determines that utility capacity is sufficient under conservative, long-term operating assumptions, which may include full build-out and peak demand. sufficient city utility capacity exists

  • The proposed M-3 district would cap structure coverage at 60% and building height at 45 feet. Height increases would require an additional 150 feet of setback for each five-foot increase; there would be no exception for structural appurtenances. maximum building height shall be forty-five

  • The proposed M-3 rules would require buildings and structures to be set back at least 300 feet, and parking areas at least 100 feet, from specified streets and residential or agricultural uses or districts. A 10-to-12-foot berm and landscaping screen would generally be required there. Other district boundaries would have a 50-foot minimum setback and planting-screen requirements. minimum setback for buildings and structures

  • The proposed M-3 rules would require public leisure trails at least eight feet wide along the district perimeter on public streets, with installation and ongoing maintenance paid by the property owner and a public-use easement granted to the City. minimum width of eight (8) feet

  • For proposed M-3 facilities, new on-site electric utilities rated below 69 kV would have to be underground, except electric utilities directly related to substation infrastructure. rated below sixty nine (69) kV

  • The proposed M-3 rules would restrict standby generators to periodic testing and exercising or emergency operation dispatched by the regional transmission operator; they could not supply ongoing operations, including through demand response or peak shaving. Diesel units would need Tier 4 Final or stricter certification, be enclosed in a masonry or concrete building, and be set back 1,000 feet from property lines, with a 500-foot minimum allowed only if greater setbacks are geographically impossible and enhanced engineering is used. Under no circumstances shall any generator

  • Generator testing at proposed M-3 facilities would generally be limited to Monday through Friday, 10 a.m. to 4 p.m., and six aggregate hours per calendar month per facility, subject to applicable state or federal environmental or safety requirements. shall not exceed a total of six (6) hours

  • Proposed M-3 uses would have to connect human-occupancy structures to City water and connect structures generating sanitary sewage to City sewer, and each utility user would need a utility-use agreement. The agreement would address maximum water use and minimum payments, among other terms; charges could not be below residential-user charges, and the property owner would bear the cost of necessary system improvements to the extent allowed by law. maximum allowable water usage

  • The proposed M-3 rules would require hazardous-material storage or processing to be described in a detailed written statement with safety protocols and required permits. Such activity could not occur within 200 feet of a parcel boundary not under common ownership; some outdoor activity would also require a 10-foot masonry wall and secured gates if visible from specified streets or properties. No such storage and/or processing shall occur

  • The proposed M-3 rules would require a recorded development agreement binding future owners, operators, and tenants before a building permit. A facility inactive for more than 15 consecutive months would have to be decommissioned unless the Planning Commission approved otherwise after a public hearing; restoration or repurposing would then be required. inactive for more than 15 consecutive months

  • Before ground disturbance for a proposed M-3 project, an emergency-response plan would have to be provided and coordinated with local first responders and specified county agencies. prior to any ground disturbance

  • The proposed M-3 noise rules would require a neutral, city-selected consultant to establish a seven-day pre-development baseline, funded through an applicant-paid escrow. Before permits, the applicant would also submit a full-build-out noise model and sound-contour maps extending 2,000 feet beyond property lines, and post-construction compliance would be checked within 90 days of routine operations. monitor seven (7) consecutive days

  • The proposed M-3 noise limits would restrict facility sound at adjacent property lines relative to the historic background baseline and to absolute daytime ceilings of 50 dBA/60 dBC and nighttime ceilings of 40 dBA/50 dBC. Prominent audible tones would incur a five-decibel penalty; separate infrasound limits would also apply. Absolute nighttime ceiling

  • The proposed M-3 noise rules would require a performance bond equal to 110% of the estimated cost of identified noise-mitigation measures; it could not be released until the City certified compliance with noise and vibration standards. equal to 110% of the total estimated cost

  • The proposed M-3 vibration rules would require pre- and post-development studies funded by the applicant and performed by a neutral consultant selected by the City. Post-development vibration could not exceed the baseline and, in any case, could not exceed 0.005 inches per second peak particle velocity at a property line or adjacent street right-of-way. 0.005 inches/second PPV

  • The proposed M-3 lighting rules would cap fixture height at 24 feet, limit lighting to no more than 25% above the applicable ANSI/IES recommendation, require shielding for luminaires over 1,000 lumens, and cap color temperature at 3,000 K, subject to a legal-compliance waiver. No lighting fixture shall be placed more than twenty-four

  • The proposed citywide noise ordinance would limit sound at the source property's boundary or road right-of-way using existing noise limits and historic baseline comparisons: for continuous sources, A-weighted L90 could not exceed the baseline by more than 4 dB, C-weighted L90 by more than 10 dB, and 10-minute LAeq/LCeq by more than 6/10 dB. shall not exceed the applicable daytime or nighttime

  • The proposed citywide noise ordinance would cap ground-borne vibration at a perception threshold of 0.01 inches per second at or beyond the source property's boundary. motion velocity of 0.01 inches per second

  • The proposed citywide noise ordinance would apply a five-decibel penalty to sound containing a tonal component, identified through one-third-octave-band analysis. subject to a five (5) dB penalty

  • For facilities proposing continuous mechanical cooling or backup-generator arrays, the proposed citywide ordinance would require a historic baseline acoustic study as a condition of building-permit approval; the City could also require continuous 24/7 monitoring at property lines and annual compliance reports. as a condition of building permit approval

  • The proposed citywide noise ordinance would require a baseline study of at least 72 hours, with separate daytime and nighttime values, qualified acoustical professionals selected randomly from a City-approved list, applicant-paid costs, and City pre-approval and public review of data and methods. at least seventy-two (72) hours

  • Under the proposed citywide noise ordinance, routine generator maintenance or testing would generally be limited to Monday through Friday, 10 a.m. to 4 p.m., and six aggregate hours per facility per calendar month. Noise limits would be waived for genuine, unpredictable, temporary emergency power outages needed to preserve life or critical infrastructure. six (6) hours in aggregate within any calendar month

  • The proposed citywide noise ordinance would make the more stringent applicable noise or vibration standard control when City code provisions conflict. the more stringent standard

  • Equipment lawfully installed and operating before the proposed citywide ordinance took effect would be exempt from its maximum continuous-sound limits only if it was not later upgraded, expanded, or altered in a way that increased acoustic output. not subsequently upgraded, expanded, or altered

  • The proposed citywide noise ordinance would make violations civil infractions and treat each continuing day as a separate offense; it also provides for injunctions and allows enforcement costs, including measurement-equipment rental or expert testimony, to be assessed as court costs. each day that a violation continues

Benefits & exceptionsHide benefits & exceptions3
  • Mechanical or electrical equipment lawfully installed and operating before the ordinance takes effect is exempt from its continuous-noise limits, unless later upgraded, expanded, or altered in a way that increases its acoustic output.

  • Noise limits are waived for backup generators during genuine, unpredictable, temporary power outages when they are needed to preserve life or critical infrastructure.

  • Routine generator maintenance and testing is allowed Monday through Friday, 10 a.m. to 4 p.m., for up to six aggregate hours per facility each calendar month, subject to applicable noise limits.

Sources

current law · City of Mason
Requires facilities such as data centers with continuous cooling systems or backup generators to meet noise and vibration limits, document predevelopment sound levels, and restrict routine generator testing.Ordinance 272 – noise and vibration limits

What this means

The proposal creates a route for data centers through special permits, but requires at least 50 contiguous acres and imposes demanding noise, vibration, utility-capacity, and environmental conditions. Those requirements could make new construction and expansion significantly harder, though the noise proposal exempts equipment already operating lawfully.

People behind it

  • Submitted the citizen-initiated noise ordinance petition. Petition submitted by the committee.

  • Identified with Councilmember Husby on the agenda item introducing proposed Ordinance 272, which would create the M-3 zoning district. Introduction and first reading.

  • Identified with Councilmember Schaffer on the agenda item introducing proposed Ordinance 272, which would create the M-3 zoning district. Introduction and first reading.

Restrictions & requirementsHide restrictions & requirements24
  • The adopted noise ordinance sets citywide limits for mechanical and electrical equipment. For continuous sources, background L90 levels generally may not rise more than 4 dB on the A-weighted scale or 10 dB on the C-weighted scale; 10-minute averages may not exceed the baseline by more than 6 dB and 10 dB, respectively. The ordinance applies the most restrictive limit. Continuous sound limits

  • Continuous cooling systems and backup-generator arrays require an applicant-funded predevelopment acoustic study: measurements must cover at least 72 hours and representative daytime, nighttime, weekday, and weekend conditions, and be completed by a qualified professional selected randomly from a city-approved list. Data and methods are subject to public review and city preapproval. Historic Pre-Development Baseline

  • The city may require facilities to install, maintain, and operate continuous 24/7 noise and vibration monitoring at property lines and provide annual compliance reports. 24/7 monitoring system

  • Groundborne vibration from mechanical or electrical equipment may not exceed 0.01 inches per second at or beyond the source property boundary. Vibration threshold

  • Sound with a tonal component is subject to a 5 dB penalty, determined through one-third-octave-band analysis. Tonal component penalty

  • Routine generator maintenance and testing is limited to Monday through Friday, 10 a.m. to 4 p.m., and no more than six aggregate hours per facility in a calendar month. Testing must meet the noise limits; genuine, unpredictable temporary outages requiring backup power are exempt from those limits. Generator testing hours

  • Equipment lawfully installed and operating before the noise ordinance takes effect is exempt from its continuous-sound limits only if it is not later upgraded, expanded, or altered in a way that increases its acoustic output. Pre-existing equipment exemption

  • Noise violations may be treated as a public nuisance subject to an injunction and as a civil infraction; each day a violation continues is a separate offense. Enforcement costs, including equipment rental or expert testimony, may be assessed as court costs. Enforcement and costs

  • Under proposed Ordinance 272, a property could be rezoned M-3 only through an application covering at least 50 contiguous acres. Agricultural uses would be permitted by right; data centers would require a special use permit. M-3 eligibility and uses

  • The proposed M-3 special-use application would need to describe expected water use and wastewater contents, electricity demand and provider-confirmed supply, environmental impacts and mitigation, construction and maintenance routes, and decommissioning and emergency-response plans. The city would have to determine that utility capacity is sufficient under conservative long-term assumptions before approving a special use permit or executing development or utility agreements. Application and capacity requirements

  • The proposed M-3 standards limit building coverage to 60%. Buildings may be no taller than 45 feet unless setbacks adjoining residential or agricultural uses or districts increase by 150 feet for each additional 5 feet of height. Coverage and height limits

  • Under the proposed M-3 standards, buildings and structures generally must be set back at least 300 feet from a public street or neighboring residential or agricultural use or district, and parking areas at least 100 feet; the required setback includes a 10-to-12-foot berm. Other district boundaries generally require a 50-foot setback. Setback and berm standards

  • The proposed ordinance requires public leisure trails along the district’s public-street perimeter, funded and maintained by the property owner, and a four-rail perimeter fence along street frontage. Trail and fence requirements

  • The proposed M-3 standards require disclosures and safety protocols for hazardous-material storage or processing, compliance with applicable permits, and a 200-foot separation from parcel boundaries not under common ownership. Outdoor hazardous-material activities visible from specified neighboring areas would also require a masonry wall at least 10 feet tall. Hazardous-material rules

  • The proposed M-3 ordinance requires new on-site electric utilities rated below 69 kV to be underground; electric utilities directly related to substation infrastructure are excepted. Underground utility requirement

  • Under the proposed M-3 standards, standby generators could be used only for periodic testing or emergency operation dispatched by the regional transmission operator—not for ongoing operations, demand response, load shedding, or peak shaving. Diesel units must meet at least EPA Tier 4 Final emissions standards, or stricter commercially available standards, and fuel must meet applicable sulfur rules. Generator operating and emissions limits

  • The proposed M-3 standards require generators to be enclosed in a masonry or concrete building rated at least STC 50 and set back 1,000 feet from property lines. If that distance is geographically impossible, a 500-foot minimum is allowed only with enhanced acoustic engineering; super-critical reactive silencers and 95% isolation mounts are mandatory. Generator construction and setback standards

  • The proposed M-3 noise standards would require a seven-day predevelopment baseline study by a neutral third-party consultant selected by the city engineer and funded through an applicant-paid escrow account. The applicant would also submit full-campus, full-capacity predictive noise modeling and contour maps extending 2,000 feet beyond property lines, and provide a performance bond equal to 110% of the estimated noise-mitigation costs. Baseline, modeling, and bond requirements

  • The proposed M-3 noise rules cap facility noise at adjacent property lines at the stricter of the baseline-plus limits (3 dB for LAeq and 5 dB for LCeq) or absolute ceilings of 50 dBA/60 dBC during the day and 40 dBA/50 dBC at night. They also impose a 5 dB penalty for a prominent audible tone and set limits on infrasound, including no increase over the historic baseline in each specified one-third-octave band from 6.3 to 31.5 Hz, subject to listed absolute ceilings. Noise and infrasound limits

  • The proposed M-3 ordinance would require a post-construction noise study within 90 days after routine operations begin, performed under maximum load; the performance bond could not be released until the city certifies compliance. External loudspeakers would be prohibited. Post-construction verification

  • The proposed M-3 ordinance requires ground-mounted mechanical equipment to use vibration isolation and sets a vibration ceiling of 0.005 inches per second PPV at property lines or adjacent street rights-of-way, while also prohibiting postdevelopment vibration above the predevelopment baseline. Applicant-funded third-party studies would establish and verify compliance. Vibration standards and studies

  • The proposed M-3 ordinance requires a recorded development agreement before a building permit, binding future owners, operators, and tenants. It also requires an emergency-response plan before ground disturbance, developed with local first responders and county agencies. Development agreement and emergency plan

  • The proposed M-3 ordinance requires water and sewer users to sign a city agreement addressing, among other things, maximum water use, minimum monthly payments, penalties, minimum service-purchase terms, and responsibility for necessary system improvements. Rates must follow a city-approved rate study and be no lower than residential-user charges. Utility agreement requirements

  • Under the proposed M-3 ordinance, a facility inactive for more than 15 consecutive months must be decommissioned unless the planning commission approves otherwise at a public hearing; decommissioned sites must be restored to predevelopment conditions or repurposed for permitted uses. Decommissioning threshold

Benefits & exceptionsHide benefits & exceptions1
  • The noise ordinance allows routine generator maintenance and testing Monday through Friday from 10 a.m. to 4 p.m., capped at six hours per facility per calendar month; testing must still comply with the applicable sound limits. Generator testing allowance

Sources

repealed · City of Mason
Regulated where data centers could be built in Mason and what approvals and safeguards they needed; the city repealed the ordinance on March 16, 2026.City of Mason Ordinance No. 266 (2026)

What this means

The proposal would allow data centers, but limits them to sites of at least 50 contiguous acres and requires studies, utility-capacity proof, public review, and agreements with the City. Those steps, along with strict setback and noise rules, could make projects harder and more costly to build and operate.

Timing

Ends
2026-03-15, or on the date Ordinance 266 is adopted

The city webpage gives this expiration condition. The meeting minutes confirm adoption of a moratorium under Ordinance 267 but do not state an expiration; they also note that a proposed 180-day term failed. The sources differ on the ordinance number.

People behind it

  • Mayor and one of two officials who proposed amendments to Ordinance 266.

  • Councilmember and one of two officials who proposed amendments to Ordinance 266.

  • Approved the ordinance’s introduction and first reading and considered later readings and adoption.

Show 2 more peopleShow fewer people
  • Participated in developing the ordinance, reviewed public comments and proposed amendments, and provided staff recommendations.

  • Held a public hearing and provided the Council with a report recommending changes to the ordinance.

Restrictions & requirementsHide restrictions & requirements21
  • A 90-day moratorium bars approval of data centers as a land use; it was set to end March 15, 2026, or when Ordinance 266 was adopted.

  • M-3 zoning requires a rezoning application covering at least 50 contiguous acres. Rezoning involves City Council readings and a Planning Commission public hearing.

  • Only agriculture and specified technology-focused uses are permitted by right in M-3; other M-1 or M-2 uses require a special use permit.

  • A proposal requires City Council-approved utility and development agreements and preliminary and final Planning Commission site plan review. Before preliminary site plan approval, the Commission must hold a public hearing, with notice published and mailed to abutters within 300 feet at least 15 days beforehand.

  • Site plan materials must document expected water use, wastewater contents, electricity use and provider-confirmed supply, and environmental impacts and mitigation. The City cannot approve a site plan or execute development or utility agreements without finding sufficient utility capacity under conservative, long-term assumptions, including full build-out and peak demand.

  • For property outside City limits, development review requires either a Public Act 425 agreement with the township and City or annexation through a property-owner petition to the State Boundary Commission, which holds a public hearing.

  • Buildings are limited to 70 feet in height, with no exception for structural appurtenances, and structures may cover no more than 60% of a parcel.

  • Buildings and structures must generally be set back 150 feet from public streets, 200 feet from residentially used or zoned property, and 50 feet from other non-street boundaries. Parking generally requires a 100-foot setback, except where the 50-foot standard applies.

  • The district requires berms, planted screening, and a four-rail fence along street frontage. The stated berm height differs between the materials: 8–10 feet in the council packet and 10–12 feet in the City summary.

  • During construction, parking, material laydown, and storage tanks must be at least 50 feet back; trailers, structures, buildings, and related construction items must be at least 100 feet back. Construction setup must also be screened from streets and residential properties.

  • New on-site electrical utilities rated below 69 kV must be underground; utilities directly related to substation infrastructure are exempt.

  • Data center water must come through the City’s municipal system; direct groundwater withdrawals are not permitted. Structures used or designed for human occupancy must connect to City water, and structures generating sanitary sewage must connect to City sewer.

  • Utility agreements must address enforceable use limits and monitoring, minimum payments and service terms, capacity protections, and compliance penalties; persistent violations may lead to corrective action or service termination. Utility rates cannot be lower than residential rates, and the City summary also identifies a minimum taxable-value requirement.

  • To the extent allowed by law, the owner must pay for water or sewer improvements needed to serve the project. The owner must also construct and maintain a public leisure trail along the district perimeter on public streets and install a four-rail fence along street frontage.

  • Before a building permit is issued, the owner must execute and record a development agreement binding future owners, operators, and tenants. The agreement documents project commitments; the City may require surety bonds or other financial assurances where legally permitted.

  • Routine noise is limited to a 24-hour average of 65 dBA at specified street or non-residential boundaries and 55 dBA at a shared residential boundary. Testing or emergency operation may reach 80 dBA, subject to applicable limits and hours.

  • Applicants must pay for pre- and post-development noise studies; if the pre-development level exceeds the applicable limit, the post-development level cannot exceed that baseline. Ground-mounted mechanical equipment must use vibration-dampening mounts, and vibration studies paid for by the applicant must show post-development levels no higher than the baseline.

  • Generators may be used only for periodic testing or an emergency disruption in normal electricity supply, not routine power. Testing is limited to once monthly for up to 15 minutes and two 60-minute events per year, with up to two additional 60-minute events subject to advance notice and approval; testing must occur on weekdays from 9 a.m. to 4 p.m. The materials differ on whether the Tier 4 emissions requirement applies to diesel generators or all on-site generators.

  • Outdoor lighting is subject to dark-sky limits: fixtures may not exceed 24 feet, light levels may not exceed applicable recommendations by more than 25%, luminaires over 1,000 lumens must be fully shielded, color temperature is capped at 3,000 K, and motion lighting must dim or turn off within five minutes. Security or public-safety needs and legal conflicts may justify a waiver.

  • Hazardous-material storage or processing requires site-plan disclosures and necessary permits, cannot occur within 200 feet of a perimeter boundary of a parcel not under common ownership, and visible outdoor activity must be enclosed by a masonry wall at least 10 feet high.

  • Wall signs in the M-3 district may not exceed 800 square feet.

Benefits & exceptionsHide benefits & exceptions10
  • Ordinance 266 was repealed on March 16, 2026, so these provisions are not currently in effect. It would have allowed data centers in the M-3 district by right, without a special use permit, but rezoning and site-plan review—including a public hearing before preliminary site-plan approval—would still have been required.

  • The M-3 district could be established on at least 50 contiguous acres, reduced from 300 acres; the ordinance set no minimum parcel size.

  • M-3 buildings could be up to 70 feet tall, and structures could cover up to 60% of a parcel. Applicable setbacks still applied, including a 200-foot setback along a shared boundary with residentially used or zoned property.

  • A parcel could meet the public-street frontage requirement through an adjacent commonly owned parcel or a recorded perpetual access easement.

  • Parking could be on-site or within 800 feet, at a rate of one space per employee on the maximum shift.

  • Data centers could connect to City water and sanitary sewer under a utility agreement addressing capacity and monitoring. Service depended on demonstrated system capacity; developers were responsible for necessary improvements where legally allowed, and rates could not be below residential rates.

  • Standby generators could provide power during disruptions to normal electricity supply and could be tested periodically. Diesel generators had to meet at least EPA Tier 4 Final emissions standards.

  • Solar panels could be used as an accessory use, including ground-mounted panels, panels on structures, and panels over paved parking areas.

  • Site plans could be reviewed using performance standards without prescribing particular cooling technologies or requiring on-site renewable-energy generation.

  • A recorded development agreement could set out project commitments, including investment levels, development timelines, infrastructure obligations, and operating standards.