City of Methuen

Mixed Data Center Policies

Massachusetts requires covered data-center projects above 25 megawatts to meet community-benefit and environmental conditions for permits, while qualifying large projects may receive 20-year tax exemptions. The exemptions have investment, size, and job requirements, and applications are not currently being accepted.

Rating and summary from Massachusetts statewide as there are no scored current or future laws outside temporary restrictions for City of Methuen.

pending · City of Methuen
Proposes a one-year ban on establishing or approving data centers in Methuen while the city develops permanent rules; the proposal was tabled for a joint public hearing.Methuen Temporary Data Center Moratorium Ordinance TO-26-20 (2026)

What this means

If enacted, the proposal would block new data center construction, conversion, and use, and prevent local permits for those activities (moratorium terms). It would last one year and could be extended once by up to 180 days, making this a severe but temporary restriction (duration).

Timing

Ends
One year from the effective date of the Ordinance, or when the City adopts a zoning ordinance regulating Data Centers, whichever occurs sooner.

The City Council voted to table the measure for a joint public hearing, so the sources do not establish an effective date. The moratorium may be extended once by a two-thirds vote of the City Council, for no more than 180 days.

People behind it

  • Requested the ordinance establishing the temporary moratorium.

  • Tasked with studying data center impacts and developing recommendations for permanent regulations.

  • Named as a department to consult on the study and recommendations.

Restrictions & requirementsHide restrictions & requirements3
  • The measure would impose a temporary moratorium on using land or structures for data centers, including newly constructing, establishing, converting, or using a property for that purpose (moratorium on use).

  • During the moratorium, the City could not issue a building permit, special permit, site plan approval, occupancy permit, or other local zoning approval authorizing a data center, except where state or federal law requires it (local approvals barred).

  • The moratorium would last one year from the ordinance’s effective date or until the City adopts data-center zoning, whichever comes first. It could be extended once, for up to 180 days, by a two-thirds City Council vote (duration and extension).

Benefits & exceptionsHide benefits & exceptions2
  • Computer servers, networking equipment, and similar technology that is accessory and incidental to an otherwise lawful principal use are excluded from the Data Center definition, so the moratorium does not apply to them as Data Centers. Accessory and incidental

  • The moratorium does not bar a use or approval when an exception is required by state or federal law. Except as otherwise required by state or federal law